001-46577
|
Executed
|
10/13/2021
|
|
|
4
|
7
|
Various
|
|
Pavement marking rehabilitation throughout District 7.
|
002-62D79
|
Executed
|
10/13/2021
|
10 / 8 |
1 |
1
|
1
|
Cook, Lake
|
|
The project extends from Montrose Ave to Park Blvd. Improvements cover 13.5 miles along 1-94 and 2 miles along US 41. The scope includes fiber optic cable, CCTV and dynamic message signs in order to provide surveillance coverage of the highway.
|
003-62G35
|
Executed
|
10/12/2021
|
5 / 5 |
1 |
1
|
1
|
McHenry
|
|
(7.74-Mile) Pavement widening and resurfacing to provide left turn lanes at 8 intersections, replacement of 3 culverts, 5 culverts repair, widening 5 culverts to accommodate proposed intersections, guardrails, regrading, shoulder improvements and rumblestrips along IL 176 from Deerpass Rd -Dean St in the City of Marengo.
|
004-62H87
|
Executed
|
10/12/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Intersection improvements at US 14 and Propect Road to include traffic signal modernization, left turn lanes, railroad interconnect, pedestrian signals, drainage system, and ADA/shared-use path improvements in Des Plaines and Mt. Prospect.
|
005-62J90
|
Executed
|
10/12/2021
|
1 / 1 |
|
1
|
1
|
Lake
|
|
(2.17-Mile) Designed Overlay, ADA Improvements; Location: FAU 3506: Sheridan Rd from St. Johns Ave to Lambert Tree Ave in the City of Highland Park in Lake County.
|
006-62K02
|
Executed
|
10/13/2021
|
|
1 |
1
|
1
|
Cook
|
|
(2,897-Ft) Intersection improvement and traffic signal modernization project located at the intersection of IL 19 (FAU 1321) and Barrington Road in the Village of Hanover Park in Cook County.
|
007-62K30
|
Executed
|
10/19/2021
|
6 / 6 |
1 |
1
|
1
|
Will
|
|
(13.6-Mile) Pavement Rehabilitation (designed overlay). Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Southbound, from South of I-80 to just South of Weber Rd in Will County.
|
008-62K51
|
Executed
|
10/19/2021
|
6 / 6 |
1 |
1
|
1
|
Will
|
|
(13.6-miles) Pavement rehabilitation (designed overlay) project for Northbound direction. Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Northbound, from South of I-80 to just South of Weber Rd in Will County.
|
009-62L67
|
Executed
|
11/15/2021
|
|
|
1
|
1
|
Cook
|
|
(5,255-Ft) Standard Overlay with ADA improvements. Location: 47th Street, from Central Ave to IL-50 (Cicero Ave) in the Village of Stickney and the City of Chicago, in Cook County.
|
010-62M76
|
Executed
|
10/19/2021
|
|
1 |
1
|
1
|
Cook
|
|
The improvement is located at the structure carrying Metra commuter rail over 1-90 and CTA at Jefferson Park (SN 016-0515) in the city of Chicago.
|
011-62M86
|
Rejected
|
09/28/2021
|
2 / 2 |
1 |
1
|
1
|
Various
|
Mandatory
|
This contract is for annual maintenance of electrical systems including the Signal Systems, Lighting Systems, Pump Station Systems, Surveilliance System and other Electrical Systems, many subsystems and components, mechanical system and including buildings, structures and grounds located withing District 1.
|
012-62N95
|
Executed
|
10/13/2021
|
1 / 1 |
|
1
|
1
|
Various
|
|
89 Traffic Signal Intersections. Installation of traffic signal safety devices to increase visibility of signal indications during inclement weather. Location - 23 intersections in Cook, 4 locations in Lake, 35 locations in Kane, 4 locations in McHenry, 23 locations in Will.
|
013-62P25
|
Executed
|
10/13/2021
|
|
|
1
|
1
|
Cook
|
|
(597-Ft.) Cleaning and painting designated steel surfaces of bridge structure carrying Western Ave over Calumet Sag Channel in the City of Blue Island, Worth and Calumet Townships, Cook County.
|
014-62P26
|
Executed
|
11/10/2021
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
(16.3-Mile) Pavement surface patching (2-in mill and fill / intermittent resurfacing) improvement. Includes affected PMKs restoration. Location: IL 173 (Maple Ave) from Alden Rd to Lake Co Line in the Villages Alden Hebron and Richmond in McHenry County.
|
015-62P27
|
Executed
|
11/16/2021
|
1 / 1 |
|
1
|
1
|
Various
|
|
(15.3-Mile) Replacement of existing signs with new guide signs, removal of walkway, and removal of existing sign lighting Location - Along 1-55 Northbound and Southbound as well as exit ramps between Weber Rd and l-294 (Tri-State Tollway)
|
016-64L75
|
Executed
|
10/14/2021
|
8 / 8 |
2 |
2
|
2
|
Ogle
|
|
Deck replacement and substructure repairs, IL 251 over Soo Line Railroad 0.1 mile South of Il 72.
|
017-64N63
|
Executed
|
10/14/2021
|
1 / 1 |
|
2
|
2
|
Jo Daviess
|
|
1.0 mile of safety improvements - Road Diet, patching and resurfacing along US 20 from 6th St. to 0.1 mile W of Camillus Drive in East Dubuque.
|
018-64R22
|
Executed
|
10/14/2021
|
1 / 1 |
|
2
|
2
|
Whiteside
|
|
Safety improvement at Science Ridge Road North of Sterling.
|
019-66997
|
Executed
|
10/13/2021
|
5 / 5 |
2 |
2
|
3
|
Kankakee
|
|
The project consists of the structure replacement carrying Maple St/Waldron Rd over I-57 in Kankakee along with construction of adjacent retaining walls. The project includes the reconstruction of portions of Maple St, Waldron Rd, construction of shared-use path and realigning/reconstructing County RD S89E.
|
020-66D53
|
Executed
|
10/12/2021
|
3 / 3 |
1 |
2
|
3
|
Iroquois
|
|
US 52 - 3P milling and resurfacing, shoulder widening and ADA in Iroquois from East of IL 1 to South of Donovan in Iroquois county.
|
021-66F11
|
Executed
|
10/13/2021
|
3 / 3 |
3 |
2
|
3
|
Kankakee
|
|
Removal and replacement of SN 046-0063 carrying Armour Road over Illinois Central Railroad located 0.3 miles west of IL 50.
|
022-66K18
|
Executed
|
10/13/2021
|
|
|
2
|
3
|
Kankakee
|
|
This project consists of 5.9 miles of shoulder widening and rumble strip installation on IL 17 from 0.10 miles South of IL 1/17 (E Taylor St) to State Line Rd in Kankakee County.
|
023-66L97
|
Executed
|
10/13/2021
|
|
|
2
|
3
|
Iroquois
|
|
This project is located at failed 48- diameter pipe culvert at Sta. 391+00 carrying IL 49 over Shavetail Creek approximately 8 miles South of US 24 (Cresent City). This project consists of removal and replacement of existing 48" and 12" storm sewer, catch basin, manhole, pavement patching and other related construction items.
|
024-66M06
|
Executed
|
10/13/2021
|
|
|
2
|
3
|
Various
|
|
This project consists of the removal and replacement of all symbol and stop bar pavement markings at various interchanges throughout District 3.
|
025-66M07
|
Executed
|
10/19/2021
|
|
|
2
|
3
|
Various
|
|
This project consists of the installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems. The work will be completed on a work order basis for repairs and maintenance activities.
|
026-66M08
|
Executed
|
10/15/2021
|
3 / 3 |
|
2
|
3
|
Bureau, LaSalle
|
|
This project consists of the installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and three changeable speed warning signs at the I-80 and I-180 interchange.
|
027-68898
|
Deleted
|
08/05/2021
|
|
|
3
|
4
|
Peoria
|
|
Bridge replacement of structure carrying IL Route 116 (Harmon Highway) over BNSF and UPRR/Kickapoo Creek S.N. 072-0037 (exist); S.N. 072-0249 (new)Ù, 0.1 mile East of Airport Road in Peoria.
|
028-68D17
|
Executed
|
10/13/2021
|
5 / 4 |
1 |
3
|
4
|
Woodford
|
|
Box culvert replacements on US 150 (S.N. 102-1005; S.N. 102-2503 (new)), 0.9 mile East of Mackinaw River and (S.N. 102-1004; S.N. 102-2030 (new)), 0.16 mile East of CR 1825E.
|
029-68G62
|
Executed
|
10/19/2021
|
|
|
3
|
4
|
Fulton
|
|
Intersection improvement with flashing lights and lighting upgrades in Fulton County.
|
030-68G63
|
Executed
|
10/15/2021
|
1 / 1 |
1 |
3
|
4
|
Woodford
|
|
New shoulders along US 150 from County Road 1250E, West of Goodfield to the McLean County Line.
|
031-70F64
|
Executed
|
10/13/2021
|
|
|
3
|
5
|
Champaign, Douglas, McLean
|
|
43.69 miles of pavement marking on I-55 from Sugar Creek to 1.0 miles E of the Veterans Parkway interchange, and on I-57 from the Coles County line S of Arcola to the Ford County line.
|
032-72K08
|
Executed
|
10/12/2021
|
1 / 1 |
|
4
|
6
|
Schuyler
|
|
Bridge replacement (SN 085-0002) carrying US 67 over Bluff Ditch, 1.8 miles northwest of IL 100.
|
033-72N00
|
Executed
|
10/22/2021
|
|
|
4
|
6
|
Morgan
|
|
Lot improvements at the Jacksonville Maintenance Yard.
|
034-72N01
|
Executed
|
11/23/2021
|
|
|
4
|
6
|
Schuyler
|
|
Lot improvements at the Rushville Maintenance Yard.
|
035-72N15
|
Executed
|
10/20/2021
|
|
|
4
|
6
|
Logan
|
|
Pipe culvert removal and replacement on I-55 around Lincoln.
|
036-72N16
|
Executed
|
10/13/2021
|
2 / 2 |
2 |
4
|
6
|
Pike
|
|
Cured-in-place pipe liners on IL 96 in Atlas.
|
037-74752
|
Executed
|
10/12/2021
|
2 / 2 |
|
4
|
7
|
Effingham
|
|
Shoulder work, base course widening, curb and gutter, ADA sidewalk improvements and box culvert replacement on US 40 from the Fayette County line to Division Street in Altamont and on IL 128 from US 40 in Altamont to 0.1 miles north of I-70.
|
038-74899
|
Executed
|
10/20/2021
|
|
|
4
|
7
|
Lawrence
|
|
Tree removal along IL 33 from County Road 1300 to Westport.
|
039-76P29
|
Executed
|
10/13/2021
|
|
|
5
|
8
|
Various
|
|
Repair and maintenance of electrical equipment at various pump stations in District 8.
|
040-76P30
|
Executed
|
10/13/2021
|
|
|
5
|
8
|
Calhoun
|
|
Repair and maintenance of electrical equipment at the Joe Page Bridge in Hardin (SN 031-0001).
|
041-76P31
|
Executed
|
10/15/2021
|
|
|
5
|
8
|
St. Clair
|
|
Well treatment at various locations in East St. Louis and Venice.
|
042-76P38
|
Executed
|
10/13/2021
|
|
|
5
|
8
|
Clinton
|
|
2.6 miles of resurfacing on Old US 50 from 0.2 miles west of Carter Street to 0.6 miles east of Pipeline Road.
|
043-76P63
|
Withdrawn
|
09/01/2021
|
|
|
5
|
8
|
Madison
|
|
Demolition of a building in the southeast quadrant of the intersection of IL 157 and St. Louis Street in Edwardsville. , Demolition of a building in the southeast quadrant of the intersection of IL 157 and St. Louis Street in Edwardsville.
|
044-76P68
|
Executed
|
10/15/2021
|
|
1 |
5
|
8
|
Madison
|
|
Bridge painting on I-255 over I-55/70 (SN 060-0206 and 060-0207).
|
045-76P69
|
Executed
|
10/22/2021
|
|
|
5
|
8
|
St. Clair
|
|
Bridge painting on IL 13 (SN 082-0115 and 082-0116).
|
046-76P74
|
Executed
|
10/19/2021
|
1 / 1 |
|
5
|
8
|
Various
|
|
Pavement marking at various locations in Bond, Clinton, Marion and Washington Counties.
|
047-76P75
|
Executed
|
10/20/2021
|
1 / 1 |
|
5
|
8
|
Greene, Jersey
|
|
39.4 miles of pavement marking removal and replacement on IL 108 from the Calhoun County line to IL 267 and on IL 100/16 from 0.3 miles east of Eldred Eldred Road to 0.1 miles west of Grafton Hills Drive.
|
048-76P76
|
Executed
|
10/19/2021
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Pavement marking in various locations of Madison County.
|
049-76P77
|
Executed
|
10/19/2021
|
1 / 1 |
|
5
|
8
|
Randolph, St. Clair
|
|
Water blasting removal of existing pavement marking and replacement with thermoplastic or modified urethane pavement marking at various locations in St. Clair and Randolph Counties.
|
050-76P81
|
Executed
|
10/19/2021
|
|
|
5
|
8
|
Randolph
|
|
5.6 miles of patching on IL 3 from IL 150 to 1 mile south of Pleasant Hill Road and IL 150 from IL 3 to Murphysboro Road.
|
051-76P82
|
Executed
|
10/12/2021
|
|
|
5
|
8
|
Randolph
|
|
6.2 miles of patching on IL 150 from IL 4, west of Steeleville, to the Perry County line.
|
052-78503
|
Executed
|
10/19/2021
|
1 / 1 |
|
5
|
9
|
Franklin
|
|
Conversion of the wye intersection of IL 149 and IL 184 to a roundabout intersection.
|
053-78602
|
Executed
|
10/19/2021
|
1 / 1 |
|
5
|
9
|
Saline
|
|
5.9 miles of patching, HMA surface removal, HMA surface, HMA shoulders and aggregate shoulders on IL 34 / 145 from the signalized intersection of US 45 and IL 34 / 145 to the intersection of IL 34 and IL 145.
|
054-78848
|
Executed
|
10/19/2021
|
2 / 2 |
1 |
5
|
9
|
Franklin, Union, Williamson
|
|
Bridge deck repairs on SN 100-0069 carrying IL 148 over Crab Orchard Lake, 2.8 miles south of IL 13; SN 091-0064 carrying IL 127 over Lingle Creek, 0.3 miles north of Mill Creek; SN 091-0067 carrying IL 127 over Mill Creek, 0.5 miles 0.5 miles north of Mill Creek; SN 028-0037 carrying IL 149 over Big Muddy River, 1.6 miles east of Ziegler.
|
055-78864
|
Executed
|
10/20/2021
|
2 / 2 |
1 |
5
|
9
|
Jackson
|
|
19.3 miles of patching, HMA surface removal, HMA resurfacing and HMA safety shoulders on IL 3 and IL 149.
|
056-78873
|
Executed
|
10/19/2021
|
1 / 1 |
1 |
5
|
9
|
Union
|
|
7.4 miles of HMA surface removal and resurfacing on US 51 from IL 146 to I-57.
|
057-78875
|
Rejected
|
09/29/2021
|
|
|
5
|
9
|
Alexander
|
|
1.8 miles of pavement patching, HMA surface removal and HMA surfacing on IL 3 in Olive Branch from 0.1 miles west of Pigeon Roost Road to Brownsville Road.
|
058-78889
|
Executed
|
10/19/2021
|
|
|
5
|
9
|
Johnson
|
|
500 feet of grade adjustment by milling and filling with HMA binder and HMA surface coarse on US 45 approximately 2.5 miles north of the I-24 Intersection, near Roosevelt Loop.
|
059-78898
|
Executed
|
10/19/2021
|
1 / 1 |
|
5
|
9
|
Franklin
|
|
5.4 miles of patching, HMA surface removal and resurfacing, safety shoulders and guardrail removal and replacement on IL 154 from near the rail crossing in Sesser to near Fitzgerrell Park Drive.
|
060-61H17
|
Executed
|
10/15/2021
|
3 / 2 |
2 |
1
|
1
|
Kane
|
|
Reconstruct the existing Illinois Prairie Path from Indian Trial Road to the DuPage County line in Aurora.
|
061-61H21
|
Executed
|
10/27/2021
|
|
|
1
|
1
|
McHenry
|
|
Resurfacing Reed Road from the west village limits to Lakewood Road in the Village of Lake in the Hills.
|
062-64R29
|
Executed
|
10/15/2021
|
|
|
2
|
2
|
Various
|
|
Installation of oversized chevrons along interchange ramp curves at various locations.
|
063-72D40
|
Executed
|
10/20/2021
|
|
|
4
|
6
|
Scott
|
|
Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston.
|
064-74A72
|
Rejected
|
09/28/2021
|
2 / 2 |
|
4
|
7
|
Various
|
|
Chain link fence replacement at 4 locations: D7 headquarters in Effingham, Shelbyville Yard, Charleston Yard and Lawrenceville Yard.
|
065-87660
|
Executed
|
12/13/2021
|
|
|
2
|
3
|
Ford
|
|
Replace the bridge carrying CH 23 over Crane Creek, 0.75 mile east of Cabery.
|
066-87740
|
Executed
|
12/13/2021
|
|
|
2
|
3
|
Ford
|
|
Replace the bridge carrying CH 18 over the West Branch of Horse Creek, 2 miles southeast of Cabery.
|
067-89725
|
Executed
|
10/13/2021
|
|
|
3
|
4
|
Tazewell
|
|
Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road to IL 8 in Washington.
|
068-89795
|
Executed
|
10/13/2021
|
2 / 2 |
1 |
3
|
4
|
Fulton
|
|
Replace the bridge carrying CH 2 over Coal Creek, 4.25 miles south of London Mills.
|
069-93772
|
Executed
|
10/13/2021
|
|
|
4
|
6
|
Cass
|
|
Resurfacing CH 8 from IL 125 to south of Pine Street.
|
070-97758
|
Executed
|
10/15/2021
|
3 / 3 |
|
5
|
8
|
Madison
|
|
Replace the bridge carrying Albers Lane over Rocky Branch Creek in Bethalto.
|
071-97760
|
Executed
|
10/15/2021
|
|
|
5
|
8
|
Madison
|
|
Pavement reconstruction, new sidewalks and drainage improvements on North Prairie Street from Corbin Street to Dorothy Street in Bethalto.
|
072-97762
|
Executed
|
10/15/2021
|
3 / 3 |
|
5
|
8
|
Madison
|
|
Construction of a shared-use path along IL 157 from Lewis Road to the Goshen Trail Pedestrian Tunnel under IL 157 in Edwardsville.
|
073-97764
|
Executed
|
11/10/2021
|
|
|
5
|
8
|
Madison
|
|
Resurfcing Johnson Road from Terrace Lane to Wabsh Avenue in Granite City.
|
074-78862
|
Executed
|
10/20/2021
|
|
|
5
|
9
|
Various
|
|
Surface preparation and application of bridge deck sealer on bridges in Alexander, Johnson, Massac, Pulaski and Union Counties.
|
075-78881
|
Executed
|
11/10/2021
|
|
|
5
|
9
|
Various
|
|
Bridge painting in various counties; 2 in Jefferson, 1 in Hamilton, 1 in White, 1 in Johnson and 4 in Pulaski Counties.
|
076-62P21
|
Executed
|
10/12/2021
|
|
|
1
|
1
|
Various
|
|
This improvement consists of High Tension Cable Barrier Repairs at Various Locations on Various Expressway Medians District Wide.
|
077-68G12
|
Executed
|
10/13/2021
|
|
|
3
|
4
|
Various
|
|
Distressed tree removal at various locations within District Four.
|
078-70F17
|
Executed
|
10/20/2021
|
|
|
3
|
5
|
Various
|
|
District-Wide On-Call Tree Removal.
|
01A-GR011
|
Executed
|
02/22/2022
|
1 / 1 |
|
5
|
8
|
Bond
|
|
Replace Runway and Taxiway Lights and Cables
|
01W-FR441
|
Active
|
08/10/2021
|
4 / 4 |
1 |
0
|
0
|
LaSalle
|
|
Removal of Vermilion River Dam on the Vermilion River at Oglesby, IL and bank stabilization in the vicinity of the dam
|