| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 11.00 | 0.00 | N/A |
| County(s) | IL Project # | Airport | Sponsor | City |
|---|---|---|---|---|
|
1C5 4718 | Bolingbrook's Clow International | Village of Bolingbrook | Bolingbrook |
| Contract Specifics |
|---|
| A voluntary pre-bid meeting will be held on Monday, January 6, 2025 at 10:00 AM in the Bolingbrook Airport Management Office at 130 Clow International Parkway C, Bolingbrook, IL. Location Notes - Management Office. Meeting Description - For engineering information, contact Junaid Yahya (Junaid.yahya@kimley-horn.com) or Luke Burlingame (luke.burlingame@kimley-horn.com). |
| The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
| 138 Calendar Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| AR101510 | EACH | AIRPORT ROTATING BEACON | Base items | 1.000 | |||
| AR101900 | EACH | BEACON REMOVAL | Base items | 1.000 | |||
| AR109210 | L SUM | VAULT MODIFICATIONS | Base items | 1.000 | |||
| AR110949 | EACH | ADJUST CABLE MARKER | Base items | 8.000 | |||
| AR125100 | EACH | ELEVATED RETROREFLECTIVE MARKER | Base items | 78.000 | |||
| AR125912 | EACH | REMOVE RETROREFLECTIVE MARKER | Base items | 40.000 | |||
| AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| AR150530 | L SUM | TRAFFIC MAINTENANCE | Base items | 1.000 | |||
| AR150540 | L SUM | HAUL ROUTE | Base items | 1.000 | |||
| AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 7,580.000 | |||
| AR152515 | CU YD | SUBGRADE UNDERCUT | Base items | 920.000 | |||
| AR154606 | SQ YD | GRANULAR DRAINAGE SUBBASE - 6" | Base items | 11,920.000 | |||
| AR156510 | FOOT | SILT FENCE | Base items | 5,800.000 | |||
| AR156513 | SQ YD | SEPARATION FABRIC | Base items | 11,920.000 | |||
| AR156520 | EACH | INLET PROTECTION | Base items | 25.000 | |||
| AR401614 | TON | BIT. SURF. CSE.-METHOD II, SUPERPAVE | Base items | 2,480.000 | |||
| AR401650 | SQ YD | BITUMINOUS PAVEMENT MILLING | Base items | 150.000 | |||
| AR401660 | FOOT | SAW & SEAL BIT. JOINTS | Base items | 1,050.000 | |||
| AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 10,000.000 | |||
| AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 775.000 | |||
| AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 1,330.000 | |||
| AR620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Base items | 3,100.000 | |||
| AR701412 | FOOT | 12" RCP, CLASS III | Base items | 187.000 | |||
| AR701418 | FOOT | 18" RCP, CLASS III | Base items | 82.000 | |||
| AR701424 | FOOT | 24" RCP, CLASS III | Base items | 113.000 | |||
| AR701900 | FOOT | REMOVE PIPE | Base items | 424.000 | |||
| AR705506 | FOOT | 6" PERFORATED UNDERDRAIN | Base items | 3,425.000 | |||
| AR705548 | FOOT | 8" NON PERFORATED UNDERDRAIN | Base items | 256.000 | |||
| AR705640 | EACH | UNDERDRAIN CLEANOUT | Base items | 22.000 | |||
| AR751411 | EACH | INLET-TYPE A | Base items | 7.000 | |||
| AR751540 | EACH | MANHOLE 4' | Base items | 1.000 | |||
| AR751906 | EACH | REMOVE CATCH BASIN | Base items | 10.000 | |||
| AR751940 | EACH | ADJUST INLET | Base items | 2.000 | |||
| AR801714 | EACH | PROVIDE AND INSTALL NEW H-20 LOAD RATED CONCRETE HANDHOLE | Base items | 1.000 | |||
| AR801715 | FOOT | NEW CONCRETE ENCASED 1-2" SCH 40 PVC WITH (2) CU #8 AWG AND (1) #8 CU AWG GND | Base items | 35.000 | |||
| AR801716 | CU YD | CRUSHED AGG. BASE COURSE - VARIABLE DEPT | Base items | 2,430.000 | |||
| AR901510 | ACRE | SEEDING | Base items | 7.160 | |||
| AR905510 | CU YD | TOPSOILING (FROM ON SITE) | Base items | 2,330.000 | |||
| AR908510 | ACRE | MULCHING | Base items | 7.160 | |||
| No More Pay Items | |||||||