Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
1 | 1 | 8.00 | 0.00 | 317SBGPTBD |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
ARR 4648 | Aurora Municipal | City of Aurora | Sugar Grove |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
43 Calendar Days |
Previously advertised on April 26, 2019 (Item 06A). |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 900.000 | |||
AR152540 | SQ YD | SOIL STABILIZATION FABRIC | Base items | 1,715.000 | |||
AR156520 | EACH | INLET PROTECTION | Base items | 4.000 | |||
AR208515 | CU YD | POROUS GRANULAR EMBANKMENT | Base items | 565.000 | |||
AR209608 | SQ YD | CRUSHED AGG. BASE COURSE - 8" | Base items | 325.000 | |||
AR209613 | S.Y. | CRUSHED AGG. BASE COURSE - 13" | Base items | 1,520.000 | |||
AR401613 | TON | BIT. SURF. CSE.-METHOD I, SUPERPAVE | Base items | 708.000 | |||
AR401650 | SQ YD | BITUMINOUS PAVEMENT MILLING | Base items | 4,654.000 | |||
AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 1,500.000 | |||
AR401916 | SQ YD | REM & REP BIT PAVEMENT - TYPE B | Base items | 100.000 | |||
AR403613 | TON | BIT. BASE CSE.-METHOD I, SUPERPAVE | Base items | 175.000 | |||
AR501509 | SQ YD | 9" PCC PAVEMENT | Base items | 110.000 | |||
AR501511 | SQ YD | 11" PCC PAVEMENT | Base items | 380.000 | |||
AR501530 | EACH | PCC TEST BATCH | Base items | 1.000 | |||
AR501900 | SQ YD | REMOVE PCC PAVEMENT | Base items | 575.000 | |||
AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 760.000 | |||
AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 926.000 | |||
AR620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Base items | 4,000.000 | |||
AR620525 | SQ FT | PAVEMENT MARKING-BLACK BORDER | Base items | 2,700.000 | |||
AR620900 | SQ FT | PAVEMENT MARKING REMOVAL | Base items | 200.000 | |||
AR705506 | FOOT | 6" PERFORATED UNDERDRAIN | Base items | 380.000 | |||
AR751980 | EACH | RECONSTRUCT INLET | Base items | 8.000 | |||
AR751995 | EACH | RECONSTRUCT UTILITY STRUCTURE | Base items | 5.000 | |||
AR800009 | SQ FT | PCC SPALL REPAIR | Base items | 100.000 | |||
AR800159 | SQ YD | SEEDING | Base items | 1,025.000 | |||
AR800162 | SQ YD | HEAVY-DUTY HYDRAULIC MULCH | Base items | 1,025.000 | |||
AR905530 | SQ YD | TOPSOILING | Base items | 1,025.000 | |||
AS501509 | SQ YD | 9" PCC PAVEMENT | Additive 1 | 410.000 | |||
AS501900 | SQ YD | REMOVE PCC PAVEMENT | Additive 1 | 410.000 | |||
AS510510 | EACH | TIE DOWN | Additive 1 | 1.000 | |||
AS620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Additive 1 | 124.000 | |||
AS620525 | SQ FT | PAVEMENT MARKING-BLACK BORDER | Additive 1 | 145.000 | |||
AT501509 | SQ YD | 9" PCC PAVEMENT | Additive 2 | 315.000 | |||
AT501900 | SQ YD | REMOVE PCC PAVEMENT | Additive 2 | 315.000 | |||
AT510510 | EACH | TIE DOWN | Additive 2 | 4.000 | |||
AT620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Additive 2 | 100.000 | |||
AT620525 | SQ FT | PAVEMENT MARKING-BLACK BORDER | Additive 2 | 100.000 | |||
No More Pay Items |