Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
1 | 1 | 0.00 | 0.00 | ZL24(463) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
15 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20101000 | FOOT | TEMPORARY FENCE | Base items | 100.000 | |||
21101615 | SQ YD | TOPSOIL FURNISH AND PLACE, 4" | Base items | 100.000 | |||
25200110 | SQ YD | SODDING, SALT TOLERANT | Base items | 100.000 | |||
28000250 | POUND | TEMPORARY EROSION CONTROL SEEDING | Base items | 150.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 220.000 | |||
28001100 | SQ YD | TEMPORARY EROSION CONTROL BLANKET | Base items | 100.000 | |||
44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 90.000 | |||
50100100 | EACH | REMOVAL OF EXISTING STRUCTURES | Base items | 1.000 | |||
50104650 | SQ YD | SLOPE WALL REMOVAL | Base items | 50.000 | |||
50200100 | CU YD | STRUCTURE EXCAVATION | Base items | 35.000 | |||
50300225 | CU YD | CONCRETE STRUCTURES | Base items | 7.000 | |||
50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 790.000 | |||
51100100 | SQ YD | SLOPE WALL 4 INCH | Base items | 70.000 | |||
51201300 | FOOT | FURNISHING STEEL PILES HP8X36 | Base items | 40.000 | |||
51202305 | FOOT | DRIVING PILES | Base items | 40.000 | |||
52200800 | SQ FT | SEGMENTAL CONCRETE BLOCK WALL | Base items | 170.000 | |||
58600101 | CU YD | GRANULAR BACKFILL FOR STRUCTURES | Base items | 50.000 | |||
59100100 | SQ YD | GEOCOMPOSITE WALL DRAIN | Base items | 10.000 | |||
60108104 | FOOT | PIPE UNDERDRAINS, TYPE 1, 4" | Base items | 45.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70102640 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 | Base items | 1.000 | |||
X0322508 | SQ FT | PEDESTRIAN TRUSS SUPERSTRUCTURE | Base items | 150.000 | |||
X0322924 | SQ FT | RETAINING WALL REMOVAL | Base items | 75.000 | |||
X0426200 | L SUM | DEWATERING | Base items | 1.000 | |||
X4240430 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH (SPECIAL) | Base items | 100.000 | |||
Z0013797 | SQ YD | STABILIZED CONSTRUCTION ENTRANCE | Base items | 40.000 | |||
Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
Z0055900 | FOOT | RUSTIC WOOD POST AND RAIL FENCE | Base items | 25.000 | |||
No More Pay Items |