Home > Notice of Letting > Contract Detail

July 31, 2026 Letting 12:00 PM
028-85781

Bulletin Description

PCC full-depth roadway construction extending Bend Blvd. from 3rd St. to 7th St. in the city of East Moline.
Region District DBE % VBP % Federal Project #
2 2 1.00 0.00 VI5U(891)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Rock Island
  • MS 0028
  • BEND BOULEVARD
  • 22-00159-04-PV (EAST MOLINE)
  • A-92-003-23
  • 2-10641-0000
Contract Specifics
Completion Date: December 01, 2027
No More Contract Specifics

Ask Subscribe Questions and Answers (11 Submitted / 11 Answered ) Questions not accepted as of July 21, 2026 04:30 PM.

  • The Trash Receptacles special provision says to match the existing trash receptacles on Bend Blvd. Do you have the supplier used for the existing trash receptacles?
    The contractor should bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (07/28/2026)

  • Per the Building Demolition Special Provision, any holes, such as basements, shall be backfilled according to article 502.10. Can you confirm that the backfilling of the hole should be included in the lump sum price for Building Removal?
    Backfilling of any holes shall be included in the lump sum cost. Monitor website for addendum. (07/24/2026)

  • For the Building Demo, will the contractor have to hire a qualified environmental specialist to perform an asbestos report of the building, or has this been completed already? If Asbestos is found in the report, then will the removal be included in this pay item? Or a change order issued for the abatement?
    Monitor website for addendum. (07/24/2026)

  • The concrete pad removal special provision says to remove all concrete debris from the site. Will we be able to recycle and reuse the materials as a CS01 or CS02 for the agg subgrade improvement line item?
    Concrete debris may be recycled and reused on-site. Monitor website for addendum. (07/24/2026)

  • Can temporary fence panels attached to above ground posts be used for the temp fence line item, or do we need to install temp posts in the ground?
    Monitor website for addendum. (07/24/2026)

  • Longitudinal Tining is checked. Will Transverse tining be allowed in lieu of the longitudinal tining?
    Either direction will be allowed. Monitor the website for an addendum. (07/24/2026)

  • Since there is a 4" Subbase granular material pay item being used as the capping stone, can the full 12" Aggregate subgrade improvement pay item be 12" of CS1, RR1, or CS2?
    A capping aggregate will not be required within the 12-inch of Aggregate Subgrade Improvement (ASI) layer because there is a 4-inch granular subbase layer above the ASI. (07/24/2026)

  • The special provisions say to match the existing wayfinding signs already installed on Bend Blvd. Do you have the supplier that was used for the previous wayfinding signs? This will ensure that the colors, finishes, and design match the previous.
    The supplier for the existing wayfinding signs installed is either Oertel Metal Works or Quad City Custom Signs. (07/23/2026)

  • Are the electrical conduits and handholes intended for future use? I didn't see any wire or poles with bases so I wanted to confirm that was the intention.
    Underground wires, light poles and fixtures will be installed by others. (07/20/2026)

  • Can you upload a copy of the PSI for the Nonspecial waste materials on this project?
    Please see the Preliminary Site Investigation Report posted as Additional Information. (07/08/2026)

  • Do you have a soil boring log that you can upload for this project to get an idea on groundwater locations?
    Please see the Preliminary Site Investigation Report posted as Additional Information. (07/08/2026)

Authorized Bidders

  • 4117 Miller Trucking & Excavating Company
    3303 John Deere Rd.
    Silvis, IL 61282
    Phone: (309) 755-7644 Fax: (309) 796-2967 Email: bre@mte47.com
    $6,393,210.00 is within a reasonable approximation of the Estimate

  • 2024 Gensini Excavating, Inc.
    10602 Highway 26
    Princeton, IL 61356
    Phone: (815) 659-1660 Fax: (815) 659-1661 Email: No Record
    $6,549,484.67

  • 3810 McCarthy Improvement Company
    5401 Victoria Avenue
    Davenport, IA 52807
    Phone: (563) 359-0321 Fax: (563) 344-3717 Email: estimating@mccarthyimprovement.com
    $6,559,250.74

  • 4741 Phoenix Corporation of the Quad Cities
    1006 Rosehill Rd
    Port Byron, IL 61275
    PO Box 445
    Rapids City, IL 61278
    Phone: (309) 523-3687 Fax: (309) 523-3752 Email: mdecap@phoenixcorp.org

  • 4813 Plote Construction, Inc.
    1100 Brandt Drive
    Hoffman Estates, IL 60192
    Phone: (847) 695-9300 Fax: (847) 695-9317 Email: bids@plote.com

  • 6210 Valley Construction Co.
    3610 78 Avenue West
    Rock Island, IL 61201
    Phone: (309) 787-0292 Fax: (309) 787-7048 Email: estimating@valleyconstruction.com
    $6,525,686.55

Non Bidders

  • 0865 Centennial Contractors of the Quad Cities, Inc.
    (Pending Authorization)
    1505 46th Ave
    Moline, IL 61265
    Phone: (309) 736-1212 Fax: No Record Email: No Record

  • 0902 Central Excavating, Inc.
    (Pending Authorization)
    1805 State Street
    Suite 104
    Bettendorf, IA 52722
    PO BOX 1738
    Bettendorf, IA 52722
    Phone: (608) 728-3692 Fax: No Record Email: No Record

  • 3375 Langman Construction, Inc.
    (Pending Authorization)
    220 - 34th Avenue
    Rock Island, IL 61201
    Phone: (309) 786-8944 Fax: (309) 786-2107 Email: lci@langmanco.com

  • 3384 Law Excavating, Inc.
    (Pending Authorization)
    510 E Benton Street
    Mt. Carroll, IL 61053
    100 N Jackson Street
    Mt. Carroll, IL 61053
    Phone: (815) 238-1614 Fax: No Record Email: No Record

Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 23.000
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 60.000
20100500 ACRE TREE REMOVAL, ACRES Base items 0.200
20200100 CU YD EARTH EXCAVATION Base items 5,695.000
20400800 CU YD FURNISHED EXCAVATION Base items 11,554.000
20800150 CU YD TRENCH BACKFILL Base items 1,901.000
21001000 SQ YD GEOTECHNICAL FABRIC FOR GROUND STABILIZATION Base items 11,481.000
21101615 SQ YD TOPSOIL FURNISH AND PLACE, 4" Base items 26,206.000
21101685 SQ YD TOPSOIL FURNISH AND PLACE, 24" Base items 820.000
25000210 ACRE SEEDING, CLASS 2A Base items 5.500
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 487.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 487.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 487.000
25100115 ACRE MULCH, METHOD 2 Base items 3.400
25100630 SQ YD EROSION CONTROL BLANKET Base items 10,049.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 4,729.000
28000500 EACH INLET AND PIPE PROTECTION Base items 84.000
28100105 SQ YD STONE RIPRAP, CLASS A3 Base items 9.000
28200200 SQ YD FILTER FABRIC Base items 29.000
30300112 SQ YD AGGREGATE SUBGRADE IMPROVEMENT 12" Base items 11,481.000
31100300 SQ YD SUBBASE GRANULAR MATERIAL, TYPE A 4" Base items 11,481.000
31101200 SQ YD SUBBASE GRANULAR MATERIAL, TYPE B 4" Base items 7,794.000
40201000 TON AGGREGATE FOR TEMPORARY ACCESS Base items 306.000
42300400 SQ YD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH Base items 920.000
42400100 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH Base items 56,128.000
42400200 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH Base items 240.000
42400800 SQ FT DETECTABLE WARNINGS Base items 75.000
44000100 SQ YD PAVEMENT REMOVAL Base items 18,050.000
44000600 SQ FT SIDEWALK REMOVAL Base items 688.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 147.000
50200400 CU YD ROCK EXCAVATION FOR STRUCTURES Base items 575.000
54213669 EACH PRECAST REINFORCED CONCRETE FLARED END SECTIONS 24" Base items 3.000
550A0050 FOOT STORM SEWERS, CLASS A, TYPE 1 12" Base items 702.000
550A0070 FOOT STORM SEWERS, CLASS A, TYPE 1 15" Base items 1,165.000
550A0090 FOOT STORM SEWERS, CLASS A, TYPE 1 18" Base items 299.000
550A0120 FOOT STORM SEWERS, CLASS A, TYPE 1 24" Base items 312.000
550A0160 FOOT STORM SEWERS, CLASS A, TYPE 1 36" Base items 899.000
550A0360 FOOT STORM SEWERS, CLASS A, TYPE 2 15" Base items 51.000
550A4000 FOOT STORM SEWERS, CLASS A, TYPE 1 EQUIVALENT ROUND-SIZE 18" Base items 236.000
550A4300 FOOT STORM SEWERS, CLASS A, TYPE 1 EQUIVALENT ROUND-SIZE 30" Base items 73.000
550A4500 FOOT STORM SEWERS, CLASS A, TYPE 1 EQUIVALENT ROUND-SIZE 36" Base items 73.000
550A5530 FOOT STORM SEWERS, CLASS A, TYPE 2 EQUIVALENT ROUND-SIZE 60" Base items 72.000
55100700 FOOT STORM SEWER REMOVAL 15" Base items 205.000
55101200 FOOT STORM SEWER REMOVAL 24" Base items 147.000
55101500 FOOT STORM SEWER REMOVAL 33" Base items 30.000
55102100 FOOT STORM SEWER REMOVAL 60" Base items 80.000
56100050 EACH DUCTILE IRON WATER MAIN TEE, 12" X 6" Base items 9.000
56101160 EACH DUCTILE IRON WATER MAIN REDUCER, 12" X 8" Base items 1.000
56103000 FOOT DUCTILE IRON WATER MAIN 6" Base items 260.000
56103100 FOOT DUCTILE IRON WATER MAIN 8" Base items 80.000
56103300 FOOT DUCTILE IRON WATER MAIN 12" Base items 2,822.000
56109418 EACH DUCTILE IRON WATER MAIN FITTINGS 6" 45 DEGREE BEND Base items 4.000
56109420 EACH DUCTILE IRON WATER MAIN FITTINGS 8" 45 DEGREE BEND Base items 4.000
56109424 EACH DUCTILE IRON WATER MAIN FITTINGS 12" 45 DEGREE BEND Base items 8.000
56400500 EACH FIRE HYDRANTS TO BE REMOVED Base items 2.000
60224459 EACH MANHOLES, TYPE A, 8'-DIAMETER, TYPE 1 FRAME, CLOSED LID Base items 2.000
60500040 EACH REMOVING MANHOLES Base items 2.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 4,188.000
66900400 GALLON SPECIAL WASTE GROUNDWATER DISPOSAL Base items 245,000.000
66900575 EACH VOCS GROUNDWATER ANALYSIS Base items 1.000
66900580 EACH SVOCS GROUNDWATER ANALYSIS Base items 1.000
66900605 EACH RCRA METALS GROUNDWATER ANALYSIS Base items 1.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
66901006 CAL DA REGULATED SUBSTANCES MONITORING Base items 110.000
67100100 L SUM MOBILIZATION Base items 1.000
78005100 SQ FT EPOXY PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 94.000
78005110 FOOT EPOXY PAVEMENT MARKING - LINE 4" Base items 17,081.000
78005180 FOOT EPOXY PAVEMENT MARKING - LINE 24" Base items 196.000
81028350 FOOT UNDERGROUND CONDUIT, PVC, 2" DIA. Base items 5,075.000
A2000316 EACH TREE, ACER MIYABEI MORTON (STATE STREET MIYABEI MAPLE), 2" CALIPER, BALLED AND BURLAPPED Base items 18.000
A2004512 EACH TREE, GINKGO BILOBA AUTUMN GOLD (AUTUMN GOLD GINKGO), 2" CALIPER, BALLED AND BURLAPPED Base items 11.000
A2005516 EACH TREE, NYSSA SYLVATICA (BLACK TUPELO), 2" CALIPER, BALLED AND BURLAPPED Base items 19.000
A2005956 EACH TREE, PLATANUS X ACERIFOLIA MORTON CIRCLE (EXCLAMATION LONDON PLANETREE), 2" CALIPER, TREE FORM, BALLED AND BURLAPPED Base items 8.000
A2016814 EACH TREE, QUERCUS SHUMARDII (SHUMARD RED OAK), 1-3/4" CALIPER, BALLED AND BURLAPPED Base items 20.000
LR420129 SQ YD PORTLAND CEMENT CONCRETE PAVEMENT 8" (SPECIAL) WITH INTEGRAL CURB Base items 11,139.000
X0326806 L SUM WASHOUT BASIN Base items 1.000
X0327301 EACH RELOCATE EXISTING MAILBOX Base items 1.000
X0327997 EACH TRASH RECEPTACLES Base items 3.000
X2011000 FOOT TEMPORARY FENCE (SPECIAL) Base items 1,376.000
X2300025 EACH SWING GATE, NEW Base items 2.000
X4240200 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH COLORED Base items 460.000
X5420124 EACH ELASTOMERIC CHECK VALVE 24" DIAMETER Base items 1.000
X5610804 EACH NON-PRESSURE CONNECTION TO EXISTING WATER MAIN Base items 3.000
X5610806 EACH PRESSURE CONNECTION TO EXISTING WATER MAIN Base items 1.000
X5640150 EACH FIRE HYDRANT ASSEMBLY COMPLETE Base items 9.000
X6022230 EACH MANHOLES, TYPE A, 4'-DIAMETER, WITH SPECIAL FRAME AND GRATE Base items 14.000
X6022930 EACH MANHOLES, TYPE A, 5'-DIAMETER, WITH SPECIAL FRAME AND GRATE Base items 11.000
X6024090 EACH MANHOLES, TYPE A, 6'-DIAMETER, WITH SPECIAL FRAME AND GRATE Base items 1.000
X6024210 EACH DOUBLE INLET (SPECIAL) Base items 2.000
X6024240 EACH INLETS (SPECIAL) Base items 51.000
X6640104 FOOT FENCE REMOVAL Base items 2,224.000
X6640298 FOOT CHAIN LINK FENCE (SPECIAL) Base items 1,258.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
XX001466 FOOT SANITARY SEWER, PVC, 12" Base items 1,993.000
XX003803 FOOT SANITARY SEWER SERVICE 6" Base items 250.000
XX005855 FOOT WATER MAIN CASING PIPE Base items 206.000
XX005896 SQ FT CONCRETE PAD REMOVAL Base items 102,167.000
XX006077 EACH GATE VALVE AND BOX 6" Base items 2.000
XX006088 EACH GATE VALVE AND BOX 12" Base items 3.000
XX006253 EACH SANITARY MANHOLE, 4'-DIAMETER Base items 10.000
XX007031 EACH FRAME AND GRATE, SPECIAL Base items 1.000
XX007125 EACH HANDHOLE SPECIAL 12" X 12" Base items 26.000
XX008269 EACH WAYFINDING SIGN Base items 2.000
Z0003850 EACH BENCHES Base items 6.000
Z0007601 L SUM BUILDING REMOVAL NO. 1 Base items 1.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0058000 FOOT SANITARY SEWER (SPECIAL) Base items 237.000
Z0076600 HOUR TRAINEES Base items 2,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 2,000.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.