Home > Notice of Letting > Contract Detail

July 31, 2026 Letting 12:00 PM
026-64V41

Bulletin Description

2.37 Miles of intermittent resurfacing between US 150 and 38th St. along 27th St.
Region District DBE % VBP % Federal Project #
2 2 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Rock Island
  • FAU 5789
  • FAU 5834
  • US 6, 27TH S.
  • ((33, 40-1)&(115))PP
  • C-92-052-26
  • 0-02181-2002
  • 0-02181-2003
Contract Specifics
25 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of July 21, 2026 04:30 PM.

Authorized Bidders

  • 6210 Valley Construction Co.
    3610 78 Avenue West
    Rock Island, IL 61201
    Phone: (309) 787-0292 Fax: (309) 787-7048 Email: estimating@valleyconstruction.com
    $755,266.20 is within a reasonable approximation of the Estimate

  • 0593 Brandt Construction Co.
    700 4th Street West
    Milan, IL 61264
    Phone: (309) 787-4644 Fax: (309) 787-6344 Email: bids@brandtconstructionco.com
    $791,482.20

Non Bidders

  • 3375 Langman Construction, Inc.
    (Pending Authorization)
    220 - 34th Avenue
    Rock Island, IL 61201
    Phone: (309) 786-8944 Fax: (309) 786-2107 Email: lci@langmanco.com

Pay Item # UOM Description Type Quantity Unit Price
40600295 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) Base items 12,079.000
44000157 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2" Base items 26,842.000
67100100 L SUM MOBILIZATION Base items 1.000
70102625 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701606 Base items 1.000
70102630 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701601 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 28.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 3,102.000
X4062950 TON HOT-MIX ASPHALT SKIP PATCH IL-9.5FG, N50 Base items 3,006.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.