| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 2 | 3 | 0.00 | 0.00 | HSIPGDL3(629) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 20 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 44000500 | FOOT | COMBINATION CURB AND GUTTER REMOVAL | Base items | 52.000 | |||
| 60603900 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 (ABUTTING EXISTING PAVEMENT) | Base items | 52.000 | |||
| 60618300 | SQ FT | CONCRETE MEDIAN SURFACE, 4 INCH | Base items | 136.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70100450 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 | Base items | 1.000 | |||
| 73000100 | FOOT | WOOD SIGN SUPPORT | Base items | 52.000 | |||
| 78200020 | EACH | CURB REFLECTORS | Base items | 12.000 | |||
| 80500300 | EACH | SERVICE INSTALLATION, TYPE C | Base items | 1.000 | |||
| 81028200 | FOOT | UNDERGROUND CONDUIT, GALVANIZED STEEL, 2" DIA. | Base items | 271.000 | |||
| 81028350 | FOOT | UNDERGROUND CONDUIT, PVC, 2" DIA. | Base items | 1,433.000 | |||
| 81100500 | FOOT | CONDUIT ATTACHED TO STRUCTURE, 1 1/2" DIA., GALVANIZED STEEL | Base items | 83.000 | |||
| 81400700 | EACH | HANDHOLE, PORTLAND CEMENT CONCRETE | Base items | 8.000 | |||
| 85800100 | EACH | FLASHER CONTROLLER | Base items | 1.000 | |||
| 87301215 | FOOT | ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 2C | Base items | 1,831.000 | |||
| 87301805 | FOOT | ELECTRIC CABLE IN CONDUIT, SERVICE, NO. 6 2 C | Base items | 5.000 | |||
| 87301900 | FOOT | ELECTRIC CABLE IN CONDUIT, EQUIPMENT GROUNDING CONDUCTOR, NO. 6 1C | Base items | 1,831.000 | |||
| 88040030 | EACH | SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 1-SECTION, POST MOUNTED | Base items | 5.000 | |||
| X4402805 | SQ FT | ISLAND REMOVAL | Base items | 136.000 | |||
| X8302125 | EACH | WOOD POLE, 25 FT, CLASS 4 | Base items | 1.000 | |||
| No More Pay Items | |||||||