Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
5 | 9 | 0.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
45 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
35400500 | SQ YD | PORTLAND CEMENT CONCRETE BASE COURSE WIDENING 10" | Base items | 244.000 | |||
44004250 | SQ YD | PAVED SHOULDER REMOVAL | Base items | 244.000 | |||
58700300 | SQ FT | CONCRETE SEALER | Base items | 292.000 | |||
59000200 | FOOT | EPOXY CRACK INJECTION | Base items | 60.000 | |||
67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 2.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100100 | EACH | TRAFFIC CONTROL AND PROTECTION, STANDARD 701316 | Base items | 1.000 | |||
70100450 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 | Base items | 1.000 | |||
70103815 | CAL DA | TRAFFIC CONTROL SURVEILLANCE | Base items | 4.000 | |||
70106500 | EACH | TEMPORARY BRIDGE TRAFFIC SIGNALS | Base items | 1.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 56.000 | |||
70300220 | FOOT | TEMPORARY PAVEMENT MARKING - LINE 4" | Base items | 2,110.000 | |||
78001110 | FOOT | PAINT PAVEMENT MARKING - LINE 4" | Base items | 1,097.000 | |||
78300201 | SQ FT | PAVEMENT MARKING REMOVAL - GRINDING | Base items | 365.000 | |||
86200300 | EACH | UNINTERRUPTABLE POWER SUPPLY, EXTENDED | Base items | 1.000 | |||
X0325747 | FOOT | BRIDGE DECK CONCRETE CRACK SEALER | Base items | 2,000.000 | |||
X0325748 | SQ YD | ACRYLIC COATING | Base items | 77.000 | |||
X0325749 | SQ FT | FIBER WRAP | Base items | 948.000 | |||
X0326331 | EACH | CLEANING AND PAINTING BEARINGS | Base items | 56.000 | |||
X7030005 | SQ FT | TEMPORARY PAVEMENT MARKING REMOVAL | Base items | 696.000 | |||
Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 292.000 | |||
Z0016200 | SQ YD | DECK SLAB REPAIR (PARTIAL) | Base items | 18.000 | |||
Z0043800 | SQ FT | PRECAST PRESTRESSED CONCRETE I-BEAM REPAIR | Base items | 138.000 | |||
Z0073200 | EACH | TEMPORARY SHORING AND CRIBBING | Base items | 8.000 | |||
No More Pay Items |