Bulletin Description

3.7 miles of patching, surface removal, surfacing and ADA ramp improvements on 14th and 11th Streets in Murphysboro.
Region District DBE % VBP % Federal Project #
5 9 3.00 0.00 STPFGRG(465)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Jackson
  • FAU 9675
  • FAU 9664
  • 13RS-4
  • C-99-095-20
  • 9-00277-0000
  • 9-00277-0100
Contract Specifics
40 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of April 13, 2021 04:30 PM.

  • At locations where HMA surface removal is over existing PCC pavement, will the HMA surface removal be limited to the depth of the existing PCC pavement surface as it is for the areas with existing brick pavement? Or, will the contractor be required to remove the full 3-3/4" in these area regardless of the thickness of the of the existing HMA?
    According to existing plans, the District believes there is enough HMA over the PCC pavement to accommodate the 3 3/4" HMA surface removal. (04/13/2021)

  • It appears that the ending station of 153+00 may be incorrect. The net length of the project is shown as 3.63 miles, but the actual measured length of the project from IL 149 to Ava Road is only about 3.2 miles. This will significantly affect the quantities of several pay items. Can you confirm that the net length of section and associated quantities are correct?
    An addendum will be issued to address this question. Please continue to watch the site for an update. (04/13/2021)

  • According to the special provisions the patching is to be completed after the milling. Will 440.04 "Milled pavement shall be resurfaced within 10 calendar days" be waived or lengthened for this project?
    An addendum will be issued to address this question. Please, watch the site for an update. (03/30/2021)

  • The HMA mixture requirements listed in the table one page 5 of the plans do not match the asphalt pay items on page 6. Which asphalt mixtures are correct?
    An addendum will be issued to address this question. Please, watch the site for an update. (03/25/2021)

Authorized Bidders

  • 5306 Samron Midwest Contracting, Inc.
    PO Box 1555
    Murphysboro, IL 62966
    Phone: (618) 687-5500 Fax: (618) 684-9341 Email: info@samron.com
    $1,216,660.94

  • 5550 E. T. Simonds Construction Company
    1500 N Oakland Ave
    PO Box 2107
    Carbondale, IL 62902
    PO Box 2107
    Carbondale, IL 62902
    Phone: (618) 457-8191 Fax: (618) 549-0131 Email: jjones@etsimonds.com
    $1,256,580.93

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 28,861.000
40600990 SQ YD TEMPORARY RAMP Base items 149.000
40603085 TON HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70 Base items 5,276.000
40604062 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 Base items 3,636.000
42400800 SQ FT DETECTABLE WARNINGS Base items 229.000
44000155 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" Base items 1,398.000
44000164 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 3 3/4" Base items 41,826.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 371.000
44000600 SQ FT SIDEWALK REMOVAL Base items 2,881.000
44201377 SQ YD CLASS C PATCHES, TYPE II, 12 INCH Base items 697.000
44201381 SQ YD CLASS C PATCHES, TYPE III, 12 INCH Base items 257.000
44201383 SQ YD CLASS C PATCHES, TYPE IV, 12 INCH Base items 289.000
60255500 EACH MANHOLES TO BE ADJUSTED Base items 2.000
60260100 EACH INLETS TO BE ADJUSTED Base items 6.000
60265700 EACH VALVE VAULTS TO BE ADJUSTED Base items 3.000
60605000 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 Base items 371.000
67100100 L SUM MOBILIZATION Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70100600 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701336 Base items 1.000
70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 14.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 5,037.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 1,679.000
70300210 SQ FT TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS Base items 47.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 44,946.000
70300240 FOOT TEMPORARY PAVEMENT MARKING - LINE 6" Base items 261.000
70300260 FOOT TEMPORARY PAVEMENT MARKING - LINE 12" Base items 104.000
70300280 FOOT TEMPORARY PAVEMENT MARKING - LINE 24" Base items 87.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 47.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 44,946.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 261.000
78000600 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 12" Base items 104.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 87.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 219.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 219.000
X4240430 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH (SPECIAL) Base items 3,041.000
X6026200 EACH INLETS TO BE ADJUSTED (SPECIAL) Base items 1.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 30,496.000
X8140115 EACH HANDHOLE TO BE ADJUSTED Base items 1.000
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 16,632.000
Z0034105 TON MATERIAL TRANSFER DEVICE Base items 8,912.000
No More Pay Items