Home > Notice of Letting > Contract Detail

April 23, 2021 Letting 12:00 PM
090-87746

Bulletin Description

Resurfacing Suydam Road from IL 23 to the city limits of Sandwich.
Region District DBE % VBP % Federal Project #
2 3 8.00 0.00 7YNA(609)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • DeKalb
  • FAS 172
  • 15-00255-00-RS
  • C-93-012-21
  • 3-10637-0000
Contract Specifics
Completion Date: August 31, 2021
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 1 Answered ) Questions not accepted as of April 13, 2021 04:30 PM.

  • What stations Lt & Rt will the Hot-Mix Asphalt Shoulders, Special take place at?
    The Hot-Mix Asphalt Shoulders, Special begin in the radii at Illinois Route 23 (approximately Sta 407+72 Lt & Rt) and end at the Gletty Road radius (approximately Sta 734+44 Rt) and the Sandwich Fair Association Office entrance (Sta 734+74 Lt). (04/13/2021)

Authorized Bidders

  • 1305 Curran Contracting Company
    286 Memorial Court
    Crystal Lake, IL 60014
    Phone: (815) 455-5100 Fax: (815) 455-7894 Email: estimating@currancontracting.com
    $1,104,983.07

  • 2341 Builders Paving, LLC
    4401 Roosevelt Road
    Hillside, IL 60162
    Phone: (847) 419-9000 Fax: (847) 419-9050 Email: ssalinas@builderspavingllc.com
    $1,176,888.00

  • 3706 Martin & Company Excavating
    2456 E. Pleasant Grove Road
    Oregon, IL 61061
    P.O. Box 443
    Oregon, IL 61061
    Phone: (815) 732-2422 Fax: (815) 732-2092 Email: info@martincoinc.net

Non Bidders

  • 4741 Phoenix Corporation of the Quad Cities
    1006 Rosehill Rd
    Port Byron, IL 61275
    PO Box 445
    Rapids City, IL 61278
    Phone: (309) 523-3687 Fax: (309) 523-3752 Email: mdecap@phoenixcorp.org

Pay Item # UOM Description Type Quantity Unit Price
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 45,847.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 1,616.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 12,068.000
42400100 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH Base items 70.000
42400800 SQ FT DETECTABLE WARNINGS Base items 16.000
48101200 TON AGGREGATE SHOULDERS, TYPE B Base items 1,790.000
60266600 EACH VALVE BOXES TO BE ADJUSTED Base items 1.000
67100100 L SUM MOBILIZATION Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 6,509.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 2,170.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 85,007.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 54.000
X4823105 TON HOT-MIX ASPHALT SHOULDERS (SPECIAL) Base items 3,855.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.