20400800
|
CU YD
|
FURNISHED EXCAVATION
|
Base items
|
270.000
|
|
25000210
|
ACRE
|
SEEDING, CLASS 2A
|
Base items
|
0.500
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
45.000
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
45.000
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
45.000
|
|
25100115
|
ACRE
|
MULCH, METHOD 2
|
Base items
|
0.500
|
|
25100630
|
SQ YD
|
EROSION CONTROL BLANKET
|
Base items
|
2,086.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
84.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
559.000
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
2.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
103,446.000
|
|
40600990
|
SQ YD
|
TEMPORARY RAMP
|
Base items
|
337.000
|
|
40602965
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50
|
Base items
|
10,728.000
|
|
40604050
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
12,816.000
|
|
40800029
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
2,103.000
|
|
40800050
|
TON
|
INCIDENTAL HOT-MIX ASPHALT SURFACING
|
Base items
|
393.000
|
|
44000159
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/2"
|
Base items
|
4,093.000
|
|
44000160
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4"
|
Base items
|
145,855.000
|
|
44201863
|
SQ YD
|
CLASS D PATCHES, TYPE II, 18 INCH
|
Base items
|
921.000
|
|
44201867
|
SQ YD
|
CLASS D PATCHES, TYPE III, 18 INCH
|
Base items
|
565.000
|
|
44201869
|
SQ YD
|
CLASS D PATCHES, TYPE IV, 18 INCH
|
Base items
|
52.000
|
|
48101200
|
TON
|
AGGREGATE SHOULDERS, TYPE B
|
Base items
|
4,026.000
|
|
63000001
|
FOOT
|
STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS
|
Base items
|
812.500
|
|
63000053
|
FOOT
|
WEAK POST GUARDRAIL ATTACHED TO CULVERT CASE IV
|
Base items
|
50.000
|
|
63100085
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 6
|
Base items
|
4.000
|
|
63100167
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT
|
Base items
|
12.000
|
|
63200310
|
FOOT
|
GUARDRAIL REMOVAL
|
Base items
|
1,685.000
|
|
67000500
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE B
|
Base items
|
6.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
70100460
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701306
|
Base items
|
1.000
|
|
70100600
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701336
|
Base items
|
1.000
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
20,814.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
6,938.000
|
|
70300220
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4"
|
Base items
|
118,419.000
|
|
72501000
|
EACH
|
TERMINAL MARKER - DIRECT APPLIED
|
Base items
|
12.000
|
|
78001110
|
FOOT
|
PAINT PAVEMENT MARKING - LINE 4"
|
Base items
|
119,391.000
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
650.000
|
|
78200005
|
EACH
|
GUARDRAIL REFLECTORS, TYPE A
|
Base items
|
34.000
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
650.000
|
|
78300202
|
SQ FT
|
PAVEMENT MARKING REMOVAL - WATER BLASTING
|
Base items
|
39,473.000
|
|
X4400196
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL (SPECIAL)
|
Base items
|
7,980.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0033700
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
52,023.000
|
|
Z0070100
|
EACH
|
SURVEY MONUMENT COVER ASSEMBLY
|
Base items
|
15.000
|
|