Home > Notice of Letting > Contract Detail

April 23, 2021 Letting 12:00 PM
05A-DU088

Bulletin Description

Elevated Fixture Grounding Updates
Region District DBE % VBP % Federal Project #
1 1 16.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • DuPage
DPA 4802 DuPage DuPage Airport Authority West Chicago
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
76 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 0 Answered ) Questions not accepted as of April 13, 2021 04:30 PM.

Authorized Bidders

  • 5635 Sonoma Underground Services Inc.
    103 Ford Drive
    New Lenox, IL 60451
    Phone: (815) 320-3222 Fax: (815) 320-3233 Email: Tbaldridge@sonoma-underground.com
    $344,654.00

  • 1647 Electric Conduit Construction
    816 Hicks Drive
    Elburn, IL 60119
    Phone: No Record Fax: No Record Email: ktyler@electricconduitconstruction.com

  • 2475 Hecker and Company, Inc.
    250 Industrial Lane
    Wheeling, IL 60090
    Phone: (847) 459-9222 Fax: (847) 459-9250 Email: dan@heckerco.com
    $619,838.00

  • 3011 J. Ranck Electric, Inc.
    1993 Gover Parkway
    MT. Pleasant, MI 48858
    Phone: (989) 775-7393 Fax: (989) 775-7393 Email: ajranck@jranck.com
    $622,595.00

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR125801 EACH 5/8" X 10' COPPER COATED GROUND ROD Base items 830.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR150536 EACH LIGHTED RUNWAY CLOSURE MARKER Base items 2.000
AR801763 EACH METALLIC FRANGIBLE COUPLING Base items 919.000
AR801764 EACH LIGHT BASE REPLACEMENT Base items 5.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.