20100110
|
UNIT
|
TREE REMOVAL (6 TO 15 UNITS DIAMETER)
|
Base items
|
76.000
|
|
20100210
|
UNIT
|
TREE REMOVAL (OVER 15 UNITS DIAMETER)
|
Base items
|
30.000
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
990.000
|
|
21101615
|
SQ YD
|
TOPSOIL FURNISH AND PLACE, 4"
|
Base items
|
5,386.000
|
|
25000210
|
ACRE
|
SEEDING, CLASS 2A
|
Base items
|
1.000
|
|
25000750
|
ACRE
|
MOWING
|
Base items
|
1.000
|
|
25100630
|
SQ YD
|
EROSION CONTROL BLANKET
|
Base items
|
5,386.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
668.000
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
40.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
3,326.000
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
4.000
|
|
28100107
|
SQ YD
|
STONE RIPRAP, CLASS A4
|
Base items
|
421.000
|
|
28200200
|
SQ YD
|
FILTER FABRIC
|
Base items
|
421.000
|
|
30300106
|
SQ YD
|
AGGREGATE SUBGRADE IMPROVEMENT 6"
|
Base items
|
155.000
|
|
40600275
|
POUND
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
1,865.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
66,135.000
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
1,768.000
|
|
40600990
|
SQ YD
|
TEMPORARY RAMP
|
Base items
|
795.000
|
|
40601005
|
TON
|
HOT-MIX ASPHALT REPLACEMENT OVER PATCHES
|
Base items
|
185.000
|
|
40602965
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50
|
Base items
|
7,956.000
|
|
40604050
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
7,866.000
|
|
40800050
|
TON
|
INCIDENTAL HOT-MIX ASPHALT SURFACING
|
Base items
|
432.000
|
|
44000160
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4"
|
Base items
|
20,898.000
|
|
44000400
|
FOOT
|
GUTTER REMOVAL
|
Base items
|
973.000
|
|
44002235
|
SQ YD
|
HOT-MIX ASPHALT REMOVAL OVER PATCHES, 8 3/4"
|
Base items
|
473.000
|
|
44201729
|
SQ YD
|
CLASS D PATCHES, TYPE II, 7 INCH
|
Base items
|
57.000
|
|
44201733
|
SQ YD
|
CLASS D PATCHES, TYPE III, 7 INCH
|
Base items
|
102.000
|
|
44201735
|
SQ YD
|
CLASS D PATCHES, TYPE IV, 7 INCH
|
Base items
|
314.000
|
|
44300200
|
FOOT
|
STRIP REFLECTIVE CRACK CONTROL TREATMENT
|
Base items
|
65,640.000
|
|
48100700
|
SQ YD
|
AGGREGATE SHOULDERS, TYPE A 8"
|
Base items
|
3,513.000
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
2,931.000
|
|
48203023
|
SQ YD
|
HOT-MIX ASPHALT SHOULDERS, 6 1/2"
|
Base items
|
829.000
|
|
60600095
|
CU YD
|
CLASS SI CONCRETE (OUTLET)
|
Base items
|
16.300
|
|
63000001
|
FOOT
|
STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS
|
Base items
|
2,887.500
|
|
63000003
|
FOOT
|
STEEL PLATE BEAM GUARDRAIL, TYPE A, 9 FOOT POSTS
|
Base items
|
237.500
|
|
63000360
|
FOOT
|
LONG-SPAN GUARDRAIL OVER CULVERT, 18 FT 9 IN SPAN
|
Base items
|
43.500
|
|
63000370
|
FOOT
|
LONG-SPAN GUARDRAIL OVER CULVERT, 25 FT SPAN
|
Base items
|
150.000
|
|
63100167
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT
|
Base items
|
18.000
|
|
63200310
|
FOOT
|
GUARDRAIL REMOVAL
|
Base items
|
2,174.000
|
|
63500105
|
EACH
|
DELINEATORS
|
Base items
|
18.000
|
|
64200108
|
FOOT
|
SHOULDER RUMBLE STRIPS, 8 INCH
|
Base items
|
2,354.000
|
|
66600105
|
EACH
|
FURNISHING AND ERECTING RIGHT OF WAY MARKERS
|
Base items
|
4.000
|
|
66700305
|
EACH
|
PERMANENT SURVEY MARKERS, TYPE II
|
Base items
|
6.000
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
9.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
70100460
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701306
|
Base items
|
1.000
|
|
70100500
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701326
|
Base items
|
1.000
|
|
70100600
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701336
|
Base items
|
1.000
|
|
70102621
|
EACH
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701501
|
Base items
|
1.000
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
49,254.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
5,655.000
|
|
72501000
|
EACH
|
TERMINAL MARKER - DIRECT APPLIED
|
Base items
|
18.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
118,527.000
|
|
78000650
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 24"
|
Base items
|
282.000
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
23.000
|
|
X2800400
|
FOOT
|
PERIMETER EROSION BARRIER (SPECIAL)
|
Base items
|
279.000
|
|
X4401198
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH
|
Base items
|
2,739.000
|
|
X6062700
|
FOOT
|
CONCRETE GUTTER, TYPE A (SPECIAL)
|
Base items
|
762.000
|
|
X7820007
|
EACH
|
GUARDRAIL REFLECTORS, TYPE C (SPECIAL)
|
Base items
|
73.000
|
|
X7830070
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 5"
|
Base items
|
118,527.000
|
|
X7830090
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 25"
|
Base items
|
282.000
|
|
Z0004405
|
SQ YD
|
HOT-MIX ASPHALT SCARIFICATION
|
Base items
|
69,363.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0028415
|
SQ YD
|
GEOTECHNICAL REINFORCEMENT
|
Base items
|
125.000
|
|
Z0033700
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
32,820.000
|
|
Z0034105
|
TON
|
MATERIAL TRANSFER DEVICE
|
Base items
|
15,822.000
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
500.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
500.000
|
$15.00
|