Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 3 | 12.00 | 0.00 | HSIP9AVJ(505) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
35 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 13,087.000 | |||
40600400 | TON | MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS | Base items | 17.200 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100700 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 | Base items | 1.000 | |||
70106800 | CAL MO | CHANGEABLE MESSAGE SIGN | Base items | 2.000 | |||
70300100 | FOOT | SHORT TERM PAVEMENT MARKING | Base items | 13,087.000 | |||
70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 4,363.000 | |||
70303130 | FOOT | TEMPORARY PAVEMENT MARKING - LINE 6" - MODIFIED URETHANE | Base items | 32,716.000 | |||
78004630 | FOOT | PREFORMED PLASTIC PAVEMENT MARKING, TYPE D - STANDARD - LINE 6" | Base items | 32,716.000 | |||
78011035 | FOOT | GROOVING FOR RECESSED PAVEMENT MARKING 7" | Base items | 32,716.000 | |||
78100100 | EACH | RAISED REFLECTIVE PAVEMENT MARKER | Base items | 3,272.000 | |||
78300200 | EACH | RAISED REFLECTIVE PAVEMENT MARKER REMOVAL | Base items | 3,272.000 | |||
78300201 | SQ FT | PAVEMENT MARKING REMOVAL - GRINDING | Base items | 16,359.000 | |||
X4405020 | FOOT | LONGITUDINAL PARTIAL DEPTH REMOVAL 2" | Base items | 29,080.000 | |||
X4420900 | TON | LONGITUDINAL PARTIAL DEPTH PATCHING | Base items | 3,257.000 | |||
No More Pay Items |