Home > Notice of Letting > Contract Detail

January 20, 2023 Letting 12:00 PM
013-68E42

Bulletin Description

0.47 miles, Bridge Replacement on I-155 over Indian Creek near Hopedale.
Region District DBE % VBP % Federal Project #
3 4 3.00 0.00 NHPPSR1Z(025)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Tazewell
  • FAI 155
  • I-155/ IL 122
  • (108-B-2)BR
  • C-94-077-18
  • 4-00133-0000
Contract Specifics
Project Labor Agreement
Completion Date: October 04, 2024 Plus 20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (9 Submitted / 9 Answered ) Questions not accepted as of January 10, 2023 04:30 PM.

  • What is the temp paint and Type 4 tape being used for. Is there a pay item for temp pavement marking removal
    Temporary Paint is being used for the winter shutdown periods, when traffic must be resumed to normal operations with 2 lanes each direction. Temporary Paint Removal is paid for as Pavement Marking Removal - Grinding and Water Blasting. Type IV Tape is being used for Staged Traffic. Type IV tape removal is paid for as Short-Term Pavement Marking Removal. (01/06/2023)

  • A large portion of the temporary pavement gets removed near the completion of the project, the bituminous mix table calls for PG SBS 76-28 for all of the temp pavement , can there be a reduced oil type used to reduce cost of this pavement?
    A PG 58-28 will be accepted for temporary pavement. (01/06/2023)

  • Can a typical section be provided for the aggregate shoulders and the guardrail aggregate erosion control shoulders? Stationing is clearly provided but width and thickness is not depicted or noted.
    The widths are the same as existing aggregate shoulders with 4' width for guardrail (except at the end section of a Type 1 where it tapers out). The depth is variable depending on the amounts of existing aggregate and bituminous resurfacing buildup. It is the contractor's responsibility to review the job site prior to bidding to confirm existing site conditions. (01/05/2023)

  • With the amount of work required for prestage construction, and the possibility of not having an executed contract until early-mid March, there is a very good possibility that the prestage work will drift well past the April 1st date to begin stage 1. Is there any chance the stage 1 completion date of November 3rd, 2023 can be pushed back closer to the end of November 2023?
    No. The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (01/04/2023)

  • Will the tree trimming required as part of this contract be subject to the tree removal restriction described on sheet 2 of the plans?
    There are no restrictions with tree trimming as long as it is only branches and not full tree removal. (01/04/2023)

  • The details in the plans for the piers call for the 14" shell piling to be driven through 14" precored holes. Being unaware of the intent for this requirement, can the precored holes be oversized? Would 18" diameter precored holes be acceptable?
    A 14” diameter precore hole is preferred because this allows the pile to develop some skin friction along the hole and avoids gaps that need to be filled. Oversized holes are acceptable but may cause a pile to drive longer, and the voids need to be backfilled in order to maintain lateral load capacity. Refer also to the Precoring Special Provision in the contract, which requires that any void space outside of the piles be filled with dry, loose sand. Also, no additional compensation will be allowed for filling the void spaces outside of the piles. PLEASE NOTE - the Structural Geotechnical Report will be replaced in the ADDITIONAL INFORMATION file with an updated version labeled I-155 over Indian Creek SGR_rev1. Please monitor the website for this update. (01/04/2023)

  • Is traffic control standard 701428 applicable to this contract? The standard is listed in the special provisions but omitted from the cover sheet of the plans. ADT is also less than 25,000.
    Highway Standards 701426 and 701428 appear at the end of the list of Highway Standards on the cover sheet of the plans. The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications posted online. (01/04/2023)

  • Can a cross section of the channel be provided showing existing and proposed profiles?
    This information is contained in the Hydraulic Report. It will be posted to the ADDITIONAL INFORMATION file online with the plans and specifications. PLEASE NOTE - the Structural Geotechnical Report will also be replace with an updated version labeled I-155 over Indian Creek SGR_rev1. Please monitor the website for these updates. (01/04/2023)

  • The S.E. corner of Str. #090-0184 calls for a Temp. Traf Bar Term Type 6A. Type 6A Terminals are designed to attach to Steel Railing. Should this be a Temp Type 6 or Type 6B?
    It should be a Temporary Type 6. An addendum will be issued to address this. (01/03/2023)

Authorized Bidders

  • 5672 Stark Excavating, Inc.
    1805 W Washington St.
    Bloomington, IL 61701
    Phone: (309) 828-5034 Fax: (309) 829-3897 Email: estimating@starkcompanies.com
    $8,247,341.87

  • 0335 Otto Baum Company, Inc.
    866 N. Main Street
    Morton, IL 61550
    Phone: (309) 266-7114 Fax: (309) 263-1050 Email: johnbasham@ottobaum.com
    $10,586,000.00

  • 6450 White Construction LLC
    3900 E. White Ave.
    Clinton, IN 47842
    PO Box 249
    Clinton, IN 47842
    Phone: (765) 828-2593 Fax: (765) 832-1860 Email: civilestimating@whiteconstruction.com
    $9,527,966.49

Non Bidders

  • 9034 Atlas Crane Service
    1275 Aurora Avenue Lane
    Aurora, IL 60505
    Phone: (630) 524-8813 Fax: (630) 425-3143 Email: No Record

  • 3382 Laser Electric, Inc.
    3611 S.W. Adams St.
    Peoria, IL 61605
    PO Box 5008
    Peoria, IL 61601
    Phone: (309) 693-2400 Fax: (309) 676-7732 Email: jason@laserelectricinc.com

  • 1284 R. A. Cullinan and Son, a div of UCM, Inc.
    121 West Park Street
    Tremont, IL 61568
    P.O. Box 166
    Tremont, IL 61568
    Phone: (309) 925-2711 Fax: (309) 925-7131 Email: tom.wall@ucm.biz

Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 525.000
20400800 CU YD FURNISHED EXCAVATION Base items 675.000
21101615 SQ YD TOPSOIL FURNISH AND PLACE, 4" Base items 3,181.000
21400100 FOOT GRADING AND SHAPING DITCHES Base items 95.000
25000300 ACRE SEEDING, CLASS 3 Base items 3.750
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 337.500
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 337.500
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 337.500
25000750 ACRE MOWING Base items 4.500
25100115 ACRE MULCH, METHOD 2 Base items 3.750
25100630 SQ YD EROSION CONTROL BLANKET Base items 6,204.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 128.000
28000305 FOOT TEMPORARY DITCH CHECKS Base items 591.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 360.000
28000500 EACH INLET AND PIPE PROTECTION Base items 6.000
28100107 SQ YD STONE RIPRAP, CLASS A4 Base items 3,398.000
28100109 SQ YD STONE RIPRAP, CLASS A5 Base items 2,374.000
28100227 TON STONE RIPRAP, CLASS B4 Base items 319.000
28200200 SQ YD FILTER FABRIC Base items 6,467.000
31100100 TON SUBBASE GRANULAR MATERIAL, TYPE A Base items 2,431.000
40600295 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) Base items 3,660.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 2,800.000
40603208 TON POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N70 Base items 108.000
40604162 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 Base items 188.000
42000060 SQ YD WELDED WIRE REINFORCEMENT Base items 160.000
42000080 SQ YD PAVEMENT CONNECTOR (PCC) FOR BRIDGE APPROACH SLAB Base items 267.000
44000100 SQ YD PAVEMENT REMOVAL Base items 90.000
44000157 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2" Base items 446.000
44000161 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 3" Base items 267.000
44004250 SQ YD PAVED SHOULDER REMOVAL Base items 2,070.000
44200148 SQ YD PAVEMENT PATCHING, TYPE III, 12 INCH Base items 22.000
48101200 TON AGGREGATE SHOULDERS, TYPE B Base items 195.000
48203100 TON HOT-MIX ASPHALT SHOULDERS Base items 292.000
50100100 EACH REMOVAL OF EXISTING STRUCTURES Base items 2.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 384.000
50200100 CU YD STRUCTURE EXCAVATION Base items 862.000
50300225 CU YD CONCRETE STRUCTURES Base items 576.600
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 589.600
50300260 SQ YD BRIDGE DECK GROOVING Base items 2,070.000
50300300 SQ YD PROTECTIVE COAT Base items 2,630.000
50301350 CU YD CONCRETE SUPERSTRUCTURE (APPROACH SLAB) Base items 232.800
50500105 L SUM FURNISHING AND ERECTING STRUCTURAL STEEL Base items 1.000
50500505 EACH STUD SHEAR CONNECTORS Base items 12,312.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 290,920.000
51200958 FOOT FURNISHING METAL SHELL PILES 14" X 0.250" Base items 836.000
51200959 FOOT FURNISHING METAL SHELL PILES 14" X 0.312" Base items 2,040.000
51202305 FOOT DRIVING PILES Base items 2,876.000
51203200 EACH TEST PILE METAL SHELLS Base items 4.000
51204650 EACH PILE SHOES Base items 56.000
51500100 EACH NAME PLATES Base items 2.000
52100520 EACH ANCHOR BOLTS, 1" Base items 96.000
5421D018 FOOT PIPE CULVERTS, CLASS D, TYPE 1 18" (TEMPORARY) Base items 356.000
54260718 EACH SLOPED METAL END SECTION WITH GRATE, STANDARD 542411, 18", 1:6 Base items 4.000
58600101 CU YD GRANULAR BACKFILL FOR STRUCTURES Base items 286.000
59100100 SQ YD GEOCOMPOSITE WALL DRAIN Base items 158.000
59300100 CU YD CONTROLLED LOW-STRENGTH MATERIAL Base items 10.000
60100060 EACH CONCRETE HEADWALLS FOR PIPE DRAINS Base items 2.000
60108100 FOOT PIPE UNDERDRAINS 4" (SPECIAL) Base items 150.000
60146304 FOOT PIPE UNDERDRAINS FOR STRUCTURES 4" Base items 388.000
63000001 FOOT STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS Base items 2,512.500
63100045 EACH TRAFFIC BARRIER TERMINAL, TYPE 2 Base items 2.000
63100085 EACH TRAFFIC BARRIER TERMINAL, TYPE 6 Base items 6.000
63100167 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT Base items 4.000
63200310 FOOT GUARDRAIL REMOVAL Base items 2,769.000
63301210 FOOT REMOVE AND REERECT STEEL PLATE BEAM GUARDRAIL, TYPE A Base items 25.000
63800920 FOOT MODULAR GLARE SCREEN SYSTEM, TEMPORARY Base items 3,775.000
64200116 FOOT SHOULDER RUMBLE STRIPS, 16 INCH Base items 4,898.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 26.000
67000600 CAL MO ENGINEER'S FIELD LABORATORY Base items 26.000
67100100 L SUM MOBILIZATION Base items 1.000
70100410 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701416 Base items 1.000
70100420 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701411 Base items 1.000
70100800 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701401 Base items 1.000
70100825 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701456 Base items 1.000
70107007 FOOT PAVEMENT MARKING BLACKOUT TAPE, 7" Base items 1,740.000
70107009 FOOT PAVEMENT MARKING BLACKOUT TAPE, 9" Base items 678.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 56.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 10,233.000
70300221 FOOT TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT Base items 12,035.000
70300241 FOOT TEMPORARY PAVEMENT MARKING - LINE 6"- PAINT Base items 2,300.000
70300251 FOOT TEMPORARY PAVEMENT MARKING - LINE 8"- PAINT Base items 678.000
70307120 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE Base items 26,127.000
70400100 FOOT TEMPORARY CONCRETE BARRIER Base items 3,225.000
70400200 FOOT RELOCATE TEMPORARY CONCRETE BARRIER Base items 1,100.000
70500100 FOOT TEMPORARY STEEL PLATE BEAM GUARDRAIL, TYPE A Base items 362.500
70500665 EACH TEMPORARY TRAFFIC BARRIER TERMINAL, TYPE 6 Base items 2.000
72501000 EACH TERMINAL MARKER - DIRECT APPLIED Base items 7.000
78004630 FOOT PREFORMED PLASTIC PAVEMENT MARKING, TYPE D - STANDARD - LINE 6" Base items 12,764.000
78004640 FOOT PREFORMED PLASTIC PAVEMENT MARKING, TYPE D - STANDARD - LINE 8" Base items 925.000
78011035 FOOT GROOVING FOR RECESSED PAVEMENT MARKING 7" Base items 12,764.000
78011045 FOOT GROOVING FOR RECESSED PAVEMENT MARKING 9" Base items 925.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 8.000
78200005 EACH GUARDRAIL REFLECTORS, TYPE A Base items 51.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 8.000
78300201 SQ FT PAVEMENT MARKING REMOVAL - GRINDING Base items 1,649.000
78300202 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 400.000
X0301728 CU YD CONCRETE COLLAR (SPECIAL) Base items 1.000
X0301993 EACH REMOVE AND REINSTALL CONCRETE HEADWALL FOR PIPE DRAIN Base items 10.000
X0322881 EACH TREE TRIMMING Base items 1.000
X2810228 TON STONE RIPRAP, CLASS B4 (SPECIAL) Base items 773.000
X4400110 SQ YD TEMPORARY PAVEMENT REMOVAL Base items 4,481.000
X5120003 FOOT PRECORING Base items 896.000
X6040171 EACH GRATES (SPECIAL) Base items 1.000
X6050310 EACH FILLING INLETS (SPECIAL) Base items 2.000
X6650208 FOOT WOVEN WIRE FENCE REMOVAL AND REPLACEMENT Base items 125.000
X7050167 EACH TEMPORARY TRAFFIC BARRIER TERMINAL, TYPE 1, SPECIAL (TANGENT) Base items 3.000
X8410102 L SUM TEMPORARY LIGHTING SYSTEM Base items 1.000
X8950425 L SUM REMOVE EXISTING TRAFFIC SURVEILLANCE EQUIPMENT Base items 1.000
Z0001002 TON GUARDRAIL AGGREGATE EROSION CONTROL Base items 274.000
Z0004552 SQ YD APPROACH SLAB REMOVAL Base items 711.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0040530 FOOT PIPE UNDERDRAIN REMOVAL Base items 147.000
Z0062456 SQ YD TEMPORARY PAVEMENT Base items 6,391.000
Z0065765 FOOT SLOTTED DRAIN 18" WITH VARIABLE SLOT Base items 358.000
Z0076600 HOUR TRAINEES Base items 1,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 1,000.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.