Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 2 | 0.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
Hot Mix Asphalt-Small Batch |
15 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20200600 | UNIT | EXCAVATING AND GRADING EXISTING SHOULDER | Base items | 23.860 | |||
21101600 | SQ YD | TOPSOIL FURNISH AND PLACE, VARIABLE DEPTH | Base items | 1,463.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 6,436.000 | |||
40600525 | TON | LEVELING BINDER (HAND METHOD), N50 | Base items | 15.000 | |||
40600627 | TON | LEVELING BINDER (MACHINE METHOD), IL-9.5FG, N50 | Base items | 552.000 | |||
40600982 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT | Base items | 121.000 | |||
40600985 | SQ YD | PORTLAND CEMENT CONCRETE SURFACE REMOVAL - BUTT JOINT | Base items | 750.000 | |||
40600990 | SQ YD | TEMPORARY RAMP | Base items | 200.000 | |||
40603310 | TON | HOT-MIX ASPHALT SURFACE COURSE, MIX "C", N50 | Base items | 844.000 | |||
44000155 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" | Base items | 2,243.000 | |||
44300100 | SQ YD | AREA REFLECTIVE CRACK CONTROL TREATMENT | Base items | 3,765.000 | |||
48102100 | TON | AGGREGATE WEDGE SHOULDER, TYPE B | Base items | 100.000 | |||
48203023 | SQ YD | HOT-MIX ASPHALT SHOULDERS, 6 1/2" | Base items | 1,867.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70102620 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 | Base items | 1.000 | |||
X4401198 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH | Base items | 143.000 | |||
No More Pay Items |