Home > Notice of Letting > Contract Detail

January 19, 2018 Letting 10:00 AM
08A-MR022

Bulletin Description

Install Precision Approach Path Indicators (PAPI)
Region District DBE % VBP % Federal Project #
2 3 0.00 0.00 317SBGP120
County(s) IL Project # Airport Sponsor City
  • Grundy
C09 4442 Morris Municipal City of Morris Morris
Contract Specifics
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting.
46 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 1 Answered ) Questions not accepted as of January 09, 2018 04:30 PM.

  • The LED PAPI is a sole sourced item. Is the ILDOT supplying the PAPI? If not, it should be removed and changed to Halogen.
    An addendum will be posted regarding this matter. (01/04/2018)

Authorized Bidders

  • 1630 J. F. Edwards Construction Company
    220 SOUTH CHICAGO STREET
    Geneseo, IL 61254
    220 S Chicago St
    Geneseo, IL 61254
    Phone: (309) 944-4681 Fax: No Record Email: kelliott@jfecc.net
    $170,743.15

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com
    $227,267.50

Non Bidders

  • 6242 Van-Mack Electric Co.
    1225 Channahon Road, Unit 3
    Rockdale, IL 60436
    Phone: (815) 725-7883 Fax: (815) 725-7888 Email: vanmackelectric@aol.com

Pay Item # UOM Description Type Quantity Unit Price
AR108656 FOOT 3/C #6 600 V UG CABLE IN UD Base items 6,650.000
AR109210 L SUM VAULT MODIFICATIONS Base items 1.000
AR110014 FOOT 4" DIRECTIONAL BORE Base items 445.000
AR125615 EACH PAPI (L-880 SYSTEM) Base items 2.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.