Home > Notice of Letting > Contract Detail

August 02, 2019 Letting 10:00 AM
026-76J86

Bulletin Description

Constructing ADA accessible sidewalk ramps on IL 159 from Park Street in Edwardsville to Glen Crossing Road in Glen Carbon and IL 157 from Vandalia Street/St. Louis Street in Edwardsville to Meridian Road in Glen Carbon.
Region District DBE % VBP % Federal Project #
5 8 20.00 0.00 NHPP-STPNSDE(740)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Madison
  • FAP 600
  • FAP 592
  • 34-1,127-1SW-1,65-1SW-1
  • C-98-273-18
  • 8-00480-0019
Contract Specifics
110 Working Days
Previously advertised on April 26, 2019 (Item 094).
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of July 23, 2019 04:30 PM.

Authorized Bidders

  • 3108 Keller Construction, Inc.
    22 Illini Drive
    Glen Carbon, IL 62034
    Phone: (618) 656-0033 Fax: (618) 656-7134 Email: dan.walker@kellerconstruction.com
    $349,450.15

  • 2308 Hank's Excavating & Landscaping, Inc.
    5825 West State Route 161
    Belleville, IL 62223
    Phone: (618) 398-5556 Fax: (618) 398-2729 Email: No Record

  • 4732 Petroff Trucking Company, Inc.
    3469 State Rt. 111
    Pontoon Beach, IL 62040
    P.O. Box 148
    Collinsville, IL 62234
    Phone: (618) 797-6100 Fax: (618) 797-6105 Email: Adam@PetroffTrucking.com

  • 4928 RCS Construction, Inc.
    960 E. Airline Drive
    East Alton, IL 62024
    Phone: (618) 254-3816 Fax: (618) 254-3841 Email: heather@rcs-construction.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
42400100 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH Base items 2,209.000
42400800 SQ FT DETECTABLE WARNINGS Base items 383.000
44000100 SQ YD PAVEMENT REMOVAL Base items 5.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 401.000
44000600 SQ FT SIDEWALK REMOVAL Base items 2,209.000
44003100 SQ FT MEDIAN REMOVAL Base items 462.000
44200050 SQ YD WELDED WIRE REINFORCEMENT Base items 4.000
44201003 SQ YD CLASS B PATCHES, TYPE I, 13 INCH Base items 4.000
44201299 EACH DOWEL BARS 1 1/2" Base items 50.000
44213200 FOOT SAW CUTS Base items 30.000
60603500 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.06 Base items 81.000
60605000 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 Base items 528.000
60618300 SQ FT CONCRETE MEDIAN SURFACE, 4 INCH Base items 594.000
66900105 EACH UNDERGROUND STORAGE TANK REMOVAL Base items 1.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 55.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 4.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901002 CAL DA ON-SITE MONITORING OF REGULATED SUBSTANCES Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000
70102632 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701602 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70102640 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 Base items 1.000
70103815 CAL DA TRAFFIC CONTROL SURVEILLANCE Base items 180.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 140.000
70300250 FOOT TEMPORARY PAVEMENT MARKING - LINE 8" Base items 369.000
70300260 FOOT TEMPORARY PAVEMENT MARKING - LINE 12" Base items 1,605.000
70300280 FOOT TEMPORARY PAVEMENT MARKING - LINE 24" Base items 12.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 140.000
78000500 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 8" Base items 369.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 1,296.000
78001100 SQ FT PAINT PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 43.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 2.000
78200020 EACH CURB REFLECTORS Base items 35.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 2.000
81028340 FOOT UNDERGROUND CONDUIT, PVC, 1 1/2" DIA. Base items 131.000
87301215 FOOT ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 2C Base items 479.000
87301225 FOOT ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 3C Base items 1,006.000
87502640 EACH TRAFFIC SIGNAL POST, ALUMINUM 10 FT. Base items 2.000
87600100 EACH PEDESTRIAN PUSH-BUTTON POST, TYPE I Base items 4.000
87800100 FOOT CONCRETE FOUNDATION, TYPE A Base items 9.000
87900200 EACH DRILL EXISTING HANDHOLE Base items 6.000
88102810 EACH PEDESTRIAN SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, BRACKET MOUNTED Base items 3.000
88102850 EACH PEDESTRIAN SIGNAL HEAD, POLYCARBONATE, LED, 3-FACE, BRACKET MOUNTED Base items 1.000
88800100 EACH PEDESTRIAN PUSH-BUTTON Base items 6.000
89500100 EACH RELOCATE EXISTING SIGNAL HEAD Base items 2.000
89500400 EACH RELOCATE EXISTING PEDESTRIAN PUSH-BUTTON Base items 2.000
89502200 EACH MODIFY EXISTING CONTROLLER Base items 2.000
89502210 EACH MODIFY EXISTING CONTROLLER CABINET Base items 2.000
89502350 FOOT REMOVE AND REINSTALL ELECTRIC CABLE FROM CONDUIT Base items 4,276.000
89502376 EACH REBUILD EXISTING HANDHOLE Base items 3.000
89502385 EACH REMOVE EXISTING CONCRETE FOUNDATION Base items 1.000
X0327979 SQ FT PAVEMENT MARKING REMOVAL - GRINDING Base items 1,861.000
X1400031 EACH REMOVE PEDESTRIAN PUSH-BUTTON Base items 1.000
X6660445 EACH RIGHT OF WAY AND PROPERTY CORNERS Base items 12.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 1,629.000
X7800100 SQ FT PAINT PAVEMENT MARKING - RAISED MEDIAN Base items 86.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.