Home > Notice of Letting > Contract Detail

August 02, 2019 Letting 10:00 AM
03A-LE053

Bulletin Description

Phase 3 - Reconstruct Remaining Taxiway B Including East of Taxiway E and West of Runway 2-20
Region District DBE % VBP % Federal Project #
1 1 7.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Will
LOT 4666 Lewis University Joliet Regional Port District Romeoville
Contract Specifics
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting.
137 Calendar Days
Note: This item is currently unfunded, but actively seeking discretionary funds.
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of July 23, 2019 04:30 PM.

  • Pay Item #AR905510, CY Topsoiling (From Onsite). Where onsite is the Topsoil Stockpiled?
    From the Special Provisions, Page 63 of 131, Item 905, 905-1.1 Add the following: “Topsoil shall be from on-site and created by stripping of topsoil from within the grading limits shown in the Plans and placed in its final position or stockpiled for re-distribution at locations designated by the Contractor and approved by the Resident Engineer.” (07/24/2019)

  • Is the intent for 03A to not commence until Spring 2020? The project bids on 8/2/2019 and if award takes the full 60 days that is allowed with NTP released immediately upon award then the date would be 10/1/2019. If the project were to begin this late in the year, then the entire project duration would be contained within a time period that the hot-mix asphalt, also possibly pavement markings, would not be able to be installed in accordance with specifications (time of year and temps)?
    Due to the time expected for contract award, subcontractor approvals, materials approvals, and other pre-construction activities, and considering the estimated construction duration of 137 calendar days, it is not anticipated that groundbreaking would occur in 2019, but rather in Spring 2020, subject to favorable weather conditions. (07/19/2019)

Authorized Bidders

  • 1950 Gallagher Asphalt Corporation
    18100 South Indiana Avenue
    Thornton, IL 60476
    Phone: (708) 877-7160 Fax: (708) 877-5222 Email: bids@gallagherasphalt.com
    $2,545,831.05

  • 6117 Austin Tyler Construction, Inc.
    23343 S Ridge Road
    Elwood, IL 60421
    Phone: (815) 726-1090 Fax: (815) 726-1171 Email: info@austin-tyler.com
    $2,653,863.75

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com
    $2,997,455.10

  • 3069 K-Five Construction Corporation
    999 Oakmont Plaza Drive
    Suite 200
    Westmont, IL 60559
    Phone: (630) 257-5600 Fax: (630) 257-6788 Email: estimating@k-five.net
    $3,134,144.57

  • 1750 P. T. Ferro Construction Co.
    700 South Rowell Ave.
    Joliet, IL 60433
    P.O. Box 156
    Joliet, IL 60434
    Phone: (815) 726-6284 Fax: (815) 726-5614 Email: estimating@ptferro.com
    $3,113,259.68

  • 1560 R. W. DUNTEMAN COMPANY
    600 S. LOMBARD RD.
    ADDISON, IL 60101
    P. O. BOX 1129
    ADDISON, IL 60101
    Phone: (630) 953-1500 Fax: (630) 932-0994 Email: estimating@rwdco.com

Non Bidders

  • 2475 Hecker and Company, Inc.
    250 Industrial Lane
    Wheeling, IL 60090
    Phone: (847) 459-9222 Fax: (847) 459-9250 Email: dan@heckerco.com

  • 3848 McDonagh Demolition, Inc.
    (Pending Authorization)
    7243 W. Touhy Avenue
    Chicago, IL 60631
    Phone: (773) 276-7707 Fax: (773) 276-7723 Email: demo@mcdonaghdemo.com

  • 6242 Van-Mack Electric Co.
    1225 Channahon Road, Unit 3
    Rockdale, IL 60436
    Phone: (815) 725-7883 Fax: (815) 725-7888 Email: vanmackelectric@aol.com

Pay Item # UOM Description Type Quantity Unit Price
AR108158 FOOT 1/C #8 5 KV UG CABLE IN UD Base items 8,635.000
AR108258 FOOT 2/C #8 5 KV UG CABLE IN UD Base items 3,361.000
AR108960 FOOT REMOVE CABLE Base items 2,101.000
AR109200 L SUM INSTALL ELECTRICAL EQUIPMENT Base items 1.000
AR109311 EACH 7.5 KW REGULATOR, STYLE 1 Base items 1.000
AR109903 EACH REMOVE REGULATOR Base items 1.000
AR110552 L.F. EXTEND 2-WAY DUCT Base items 77.000
AR110554 L.F. EXTEND 4-WAY DUCT Base items 65.000
AR110610 EACH ELECTRICAL HANDHOLE Base items 1.000
AR125410 EACH MITL-STAKE MOUNTED Base items 16.000
AR125411 EACH MITL-STAKE MOUNTED-LED Base items 52.000
AR125415 EACH MITL-BASE MOUNTED Base items 2.000
AR125416 EACH MITL-BASE MOUNTED-LED Base items 8.000
AR125442 EACH TAXI GUIDANCE SIGN, 2 CHARACTER Base items 2.000
AR125443 EACH TAXI GUIDANCE SIGN, 3 CHARACTER Base items 3.000
AR125444 EACH TAXI GUIDANCE SIGN, 4 CHARACTER Base items 2.000
AR125445 EACH TAXI GUIDANCE SIGN, 5 CHARACTER Base items 1.000
AR125446 EACH TAXI GUIDANCE SIGN, 6 CHARACTER Base items 1.000
AR125901 EACH REMOVE STAKE MOUNTED LIGHT Base items 42.000
AR125902 EACH REMOVE BASE MOUNTED LIGHT Base items 12.000
AR125904 EACH REMOVE TAXI GUIDANCE SIGN Base items 10.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR150540 L SUM HAUL ROUTE Base items 1.000
AR152410 CU YD UNCLASSIFIED EXCAVATION Base items 12,195.000
AR152540 SQ YD SOIL STABILIZATION FABRIC Base items 7,690.000
AR154606 SQ YD GRANULAR DRAINAGE SUBBASE - 6" Base items 20,374.000
AR156510 FOOT SILT FENCE Base items 192.000
AR156513 SQ YD SEPARATION FABRIC Base items 12,684.000
AR156520 EACH INLET PROTECTION Base items 1.000
AR156531 SQ YD EROSION CONTROL BLANKET Base items 854.000
AR156533 ACRE TEMPORARY SEED AND MULCH Base items 2.800
AR156534 S.Y. TURF REINFORCING MAT Base items 369.000
AR209611 S.Y. CRUSHED AGGREGATE BASE COURSE-11" Base items 20,443.000
AR401614 TON BIT. SURF. CSE.-METHOD II, SUPERPAVE Base items 2,513.000
AR401630 EACH BITUMINOUS SURFACE TEST SECTION Base items 1.000
AR401650 SQ YD BITUMINOUS PAVEMENT MILLING Base items 630.000
AR401660 FOOT SAW & SEAL BIT. JOINTS Base items 727.000
AR401665 FOOT BITUMINOUS PAVEMENT SAWING Base items 1,397.000
AR401900 SQ YD REMOVE BITUMINOUS PAVEMENT Base items 13,659.000
AR403614 TON BIT. BASE CSE.-METHOD II, SUPERPAVE Base items 5,543.000
AR403630 EACH BITUMINOUS BASE TEST SECTION Base items 1.000
AR602510 GALLON BITUMINOUS PRIME COAT Base items 5,918.000
AR603510 GALLON BITUMINOUS TACK COAT Base items 6,137.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 4,279.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 5,908.000
AR620530 SQ FT PAVEMENT MARKING-EPOXY Base items 1,164.000
AR620590 SQ FT TEMPORARY MARKING Base items 1,202.000
AR620900 SQ FT PAVEMENT MARKING REMOVAL Base items 1,596.000
AR705506 FOOT 6" PERFORATED UNDERDRAIN Base items 5,233.000
AR705630 EACH UNDERDRAIN INSPECTION HOLE Base items 4.000
AR705640 EACH UNDERDRAIN CLEANOUT Base items 10.000
AR705900 FOOT REMOVE UNDERDRAIN Base items 5,712.000
AR705903 EACH REMOVE UNDERDRAIN INSP. HOLE Base items 4.000
AR705904 EACH REMOVE UNDERDRAIN CLEANOUT Base items 7.000
AR705943 EACH ADJUST UNDERDRAIN INSP. HOLE Base items 1.000
AR800910 L.F. BITUMINOUS PRESSURE RELIEF JOINT Base items 110.000
AR803003 S.Y. CONCRETE CABLE BOTTOM Base items 191.000
AR901510 ACRE SEEDING Base items 3.700
AR904510 SQ YD SODDING Base items 305.000
AR905510 CU YD TOPSOILING (FROM ON SITE) Base items 2,075.000
AR908510 ACRE MULCHING Base items 3.600
AR910216 L.S. TEMPORARY CONSTRUCTION SIGNS Base items 1.000
No More Pay Items