Home > Notice of Letting > Contract Detail

August 01, 2025 Letting 12:00 PM
02A-TA009

Plans and Special Provisions are not available at this time

Bulletin Description

Rehabilitate Taxiway A, Phase 2
Region District DBE % VBP % Federal Project #
4 6 Pending Pending 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Christian
TAZ 5080 Taylorville Municipal City of Taylorville Taylorville
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
113 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of July 22, 2025 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
This list of pay items is subject to change until the Plans and Special Provisions have been published.
Pay Item # UOM Description Type Quantity Unit Price
AR108158 FOOT 1/C #8 5 KV UG CABLE IN UD Base items 8,000.000
AR108706 FOOT 1/C #6 COUNTERPOISE Base items 8,000.000
AR108960 FOOT REMOVE CABLE Base items 7,100.000
AR110014 FOOT 4" DIRECTIONAL BORE Base items 65.000
AR110102 EACH DUCT MARKER - IN PAVEMENT Base items 6.000
AR110551 FOOT EXTEND DUCT Base items 20.000
AR110900 FOOT REMOVE DUCT Base items 50.000
AR125411 EACH MITL-STAKE MOUNTED-LED Base items 47.000
AR125416 EACH MITL-BASE MOUNTED-LED Base items 14.000
AR125447 EACH TAXI GUIDANCE SIGN, 7 CHARACTER Base items 1.000
AR125901 EACH REMOVE STAKE MOUNTED LIGHT Base items 48.000
AR125902 EACH REMOVE BASE MOUNTED LIGHT Base items 26.000
AR125904 EACH REMOVE TAXI GUIDANCE SIGN Base items 2.000
AR125924 EACH REPLACE TAXI GUIDANCE SIGN Base items 1.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR152410 CU YD UNCLASSIFIED EXCAVATION Base items 1,200.000
AR152480 SQ YD SHOULDER ADJUSTMENT Base items 15,400.000
AR156520 EACH INLET PROTECTION Base items 7.000
AR201660 FOOT BITUMINOUS CRACK REPAIR Base items 2,400.000
AR201670 SQ YD CRACK CONTROL FABRIC Base items 1,100.000
AR209612 SQ YD CRUSHED AGG. BASE COURSE - 12" Base items 1,100.000
AR401610 TON BITUMINOUS SURFACE COURSE Base items 800.000
AR401650 SQ YD BITUMINOUS PAVEMENT MILLING Base items 7,800.000
AR401655 SQ YD BUTT JOINT CONSTRUCTION Base items 460.000
AR401900 SQ YD REMOVE BITUMINOUS PAVEMENT Base items 7,300.000
AR403610 TON BITUMINOUS BASE COURSE Base items 1,700.000
AR602510 GALLON BITUMINOUS PRIME COAT Base items 310.000
AR603510 GALLON BITUMINOUS TACK COAT Base items 1,600.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 9,600.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 5,600.000
AR620900 SQ FT PAVEMENT MARKING REMOVAL Base items 2,200.000
AR705524 FOOT 4" PERFORATED UNDERDRAIN W/SOCK Base items 4,400.000
AR705544 FOOT 4" NON PERFORATED UNDERDRAIN Base items 85.000
AR705640 EACH UNDERDRAIN CLEANOUT Base items 10.000
AR705645 EACH UNDERDRAIN CONNECTION Base items 5.000
AR901510 ACRE SEEDING Base items 3.000
AR904510 SQ YD SODDING Base items 2,000.000
AR908514 ACRE LIGHT-DUTY HYDRAULIC MULCH Base items 3.000
AS125924 EACH REPLACE TAXI GUIDANCE SIGN Additive 1 2.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.