25000210
|
ACRE
|
SEEDING, CLASS 2A
|
Base items
|
0.500
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
47.000
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
47.000
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
47.000
|
|
25100630
|
SQ YD
|
EROSION CONTROL BLANKET
|
Base items
|
2,518.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
53.000
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
150.000
|
|
28100805
|
TON
|
STONE DUMPED RIPRAP, CLASS A3
|
Base items
|
3.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
106,455.000
|
|
40600400
|
TON
|
MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS
|
Base items
|
71.000
|
|
40600990
|
SQ YD
|
TEMPORARY RAMP
|
Base items
|
1,157.000
|
|
40604052
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70
|
Base items
|
25,626.000
|
|
44000157
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2"
|
Base items
|
236,557.000
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
1,921.000
|
|
48203100
|
TON
|
HOT-MIX ASPHALT SHOULDERS
|
Base items
|
871.000
|
|
64200108
|
FOOT
|
SHOULDER RUMBLE STRIPS, 8 INCH
|
Base items
|
128,340.000
|
|
64200116
|
FOOT
|
SHOULDER RUMBLE STRIPS, 16 INCH
|
Base items
|
9,974.000
|
|
66700205
|
EACH
|
PERMANENT SURVEY MARKERS, TYPE I
|
Base items
|
27.000
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
4.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70100460
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701306
|
Base items
|
1.000
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
20,803.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
6,935.000
|
|
78000100
|
SQ FT
|
THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
31.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
3,254.000
|
|
78000500
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 8"
|
Base items
|
595.000
|
|
78000600
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 12"
|
Base items
|
736.000
|
|
78000650
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 24"
|
Base items
|
25.000
|
|
78001110
|
FOOT
|
PAINT PAVEMENT MARKING - LINE 4"
|
Base items
|
299,604.000
|
|
78001130
|
FOOT
|
PAINT PAVEMENT MARKING - LINE 6"
|
Base items
|
33,523.000
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
938.000
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
938.000
|
|
X0325893
|
EACH
|
CLEAN EXISTING END SECTION
|
Base items
|
4.000
|
|
X2140100
|
FOOT
|
GRADING AND SHAPING DITCHES (SPECIAL)
|
Base items
|
1,500.000
|
|
X7830076
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 9"
|
Base items
|
226.000
|
|
X7830090
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 25"
|
Base items
|
25.000
|
|
Z0005305
|
FOOT
|
BOX CULVERTS TO BE CLEANED
|
Base items
|
489.000
|
|
Z0030850
|
SQ FT
|
TEMPORARY INFORMATION SIGNING
|
Base items
|
84.000
|
|
Z0033700
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
69,157.000
|
|
Z0034105
|
TON
|
MATERIAL TRANSFER DEVICE
|
Base items
|
25,626.000
|
|
Z0055300
|
EACH
|
RUMBLE STRIP
|
Base items
|
3.000
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
2,000.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
2,000.000
|
$15.00
|