Home > Notice of Letting > Contract Detail

March 06, 2020 Letting 10:00 AM
161-85675

Bulletin Description

Sidewalk construction on various routes in the Village of Creston.
Region District DBE % VBP % Federal Project #
2 2 0.00 0.00 SCBY(614)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Ogle
  • VARIOUS
  • 12-00008-00-SW (CRESTON)
  • C-92-143-12
  • 0-01753-2003
Contract Specifics
40 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (5 Submitted / 4 Answered ) Questions not accepted as of February 25, 2020 04:30 PM.

  • The special provisions for SIDEWALK REMOVAL and PAVEMENT REMOVAL (sheet 2/9) indicate that all surplus excavation needs to be disposed of off site at a licensed landfill. Are clean (CCDD) materials required to be disposed of at a licensed landfill? Can clean materials be disposed of with an approved BDE2290? Is this a requirement for all spoils generated or just those that result from SIDEWALK and PAVEMENT REMOVAL?
    Disposal of clean materials with a BDE2290 is acceptable for locations not listed on the plans as Special Waste areas. All of the Special Waste areas are near the UP Railroad crossings (labeled on sheets 6-7 of the plans & within the PESA for properties with REC’s). If the excess material can be used on the same property that is allowed. All excess materials within the properties labeled Special Waste on the plan should be disposed of at a landfill (sidewalk, pavement and soil). (02/26/2020)

  • The bid documents do not include any justification of amounts or locations of the items to be addressed issues under the Removal and Disposal of Regulated Substances Section. I was able to obtain the draft PESA, however it does not address this either. Is the a PSI that addresses this or another document?
    An addendum will be issued. (02/25/2020)

  • Will a site-specific provision for Removal and Disposal of Regulated substances be added?
    No. An addendum will be issued to further clarify. (02/25/2020)

  • you have LR1030 Percent Growth curve in the specials, then in the special's under Incidental Hot Mix Asphalt Surfacing you have "densities shall be 93%" which is not IDOT density spec for a 9.5 surface, nor is it the spec if were using LR1030.
    LR 1030 should be used. (02/19/2020)

Authorized Bidders

  • 4906 Stenstrom Excavation & Blacktop, Inc.
    2422 Center Street
    Rockford, IL 61108
    Phone: (815) 398-3478 Fax: (815) 229-0978 Email: excavation@rstenstrom.com

  • 0103 Alliance Contractors, Inc.
    1166 Lake Avenue
    Woodstock, IL 60098
    Phone: (815) 338-5900 Fax: (815) 338-9109 Email: estimating@alliancecontractors.com

  • 0791 Campos Construction, Inc.
    1201 12th Street
    Rockford, IL 61104
    Phone: (815) 394-1414 Fax: (815) 394-1484 Email: Linda@camposconstruction.net

  • 1045 Civil Constructors, Inc. d/b/a/ Helm Civil
    2283 Bus Hwy 20 East
    Freeport, IL 61032
    PO Box 750
    Freeport, IL 61032
    Phone: (815) 235-2200 Fax: (815) 235-2219 Email: civilestimating@helmgroup.com

  • 1689 Elliott and Wood, Inc.
    210 Industrial Drive
    DeKalb, IL 60115
    PO Box 544
    DeKalb, IL 60115
    Phone: (815) 756-4555 Fax: (815) 758-0207 Email: bids@elliott-wood.com

  • 3596 M & M Concrete, Inc.
    225 E. Carpenter Ave
    Stockton, IL 61085
    P.O. Box 40
    Stockton, IL 61085
    Phone: (815) 947-2178 Fax: No Record Email: mmconcreteoffice@gmail.com

  • 3706 Martin & Company Excavating
    2456 E. Pleasant Grove Road
    Oregon, IL 61061
    P.O. Box 443
    Oregon, IL 61061
    Phone: (815) 732-2422 Fax: (815) 732-2092 Email: info@martincoinc.net

  • 4461 O'Brien Civil Works, Inc.
    2963 W Mud Creek Rd
    Mt Morris, IL 61054
    Phone: (815) 734-7722 Fax: (815) 734-7723 Email: office@obriencw.com

Non Bidders

  • 1305 Curran Contracting Company
    286 Memorial Court
    Crystal Lake, IL 60014
    Phone: (815) 455-5100 Fax: (815) 455-7894 Email: estimating@currancontracting.com

Pay Item # UOM Description Type Quantity Unit Price
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 24.000
28000500 EACH INLET AND PIPE PROTECTION Base items 17.000
35102000 SQ YD AGGREGATE BASE COURSE, TYPE B 8" Base items 514.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 1,712.000
40800050 TON INCIDENTAL HOT-MIX ASPHALT SURFACING Base items 88.000
42400100 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH Base items 17,836.000
42400300 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH Base items 3,144.000
42400800 SQ FT DETECTABLE WARNINGS Base items 438.000
44000100 SQ YD PAVEMENT REMOVAL Base items 755.000
44000600 SQ FT SIDEWALK REMOVAL Base items 8,121.000
44213200 FOOT SAW CUTS Base items 1,277.000
52200800 SQ FT SEGMENTAL CONCRETE BLOCK WALL Base items 260.000
60250200 EACH CATCH BASINS TO BE ADJUSTED Base items 1.000
60603800 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 Base items 419.000
61140200 FOOT STORM SEWERS (SPECIAL), 12" Base items 140.000
61140400 FOOT STORM SEWERS (SPECIAL), 15" Base items 235.000
67100100 L SUM MOBILIZATION Base items 1.000
X0323378 EACH CONCRETE PARKING BLOCKS Base items 4.000
X6024242 EACH INLETS, SPECIAL, NO. 1 Base items 2.000
X6024244 EACH INLETS, SPECIAL, NO. 2 Base items 1.000
X6024246 EACH INLETS, SPECIAL, NO. 3 Base items 2.000
X6026050 EACH SANITARY MANHOLES TO BE ADJUSTED Base items 1.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
XX002053 L SUM LANDSCAPE RESTORATION Base items 1.000
XX006821 L SUM CONCRETE TRUCK WASHOUT Base items 1.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0019500 EACH DRYWELL Base items 1.000
Z0048665 L SUM RAILROAD PROTECTIVE LIABILITY INSURANCE Base items 1.000
No More Pay Items