Home > Notice of Letting > Contract Detail

March 06, 2020 Letting 10:00 AM
089-76N07

Bulletin Description

2.4 miles of resurfacing on IL 143 from west of Oasis Drive to east of Drda Lane.
Region District DBE % VBP % Federal Project #
5 8 10.00 0.00 NHPPV9Q0(562)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Madison
  • FAP 789
  • (125,125-1)RS-5
  • C-98-047-20
  • 8-00732-0000
Contract Specifics
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of February 25, 2020 04:30 PM.

Authorized Bidders

  • 1034 Christ Bros. Asphalt, Inc.
    820 s fritz st.
    P.O. Box 158
    Lebanon, IL 62254
    Phone: (618) 537-6174 Fax: (618) 537-6199 Email: No Record
    $1,159,208.01

  • 3157 The Kilian Corporation
    608 South Independence Street
    Mascoutah, IL 62258
    P.O. Box A
    Mascoutah, IL 62258
    Phone: (618) 566-2000 Fax: (618) 566-2314 Email: sharon.weier@kiliancorp.com
    $1,219,441.48

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 31,213.000
40600990 SQ YD TEMPORARY RAMP Base items 245.000
40604062 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 Base items 5,831.000
44000155 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" Base items 69,357.000
44200144 SQ YD PAVEMENT PATCHING, TYPE II, 12 INCH Base items 48.000
44200148 SQ YD PAVEMENT PATCHING, TYPE III, 12 INCH Base items 18.000
44200150 SQ YD PAVEMENT PATCHING, TYPE IV, 12 INCH Base items 37.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 3.000
67100100 L SUM MOBILIZATION Base items 1.000
70100310 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 Base items 1.000
70100420 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701411 Base items 4.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70100600 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701336 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 42.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 5,756.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 830.000
70300210 SQ FT TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS Base items 63.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 60,878.000
70300260 FOOT TEMPORARY PAVEMENT MARKING - LINE 12" Base items 192.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 63.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 60,878.000
78000600 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 12" Base items 192.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 298.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 298.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 20,432.000
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 22,230.000
Z0034105 TON MATERIAL TRANSFER DEVICE Base items 5,831.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.