March 06, 2020 Letting 10:00 AM
08A-PL017

Bulletin Description

Rehabilitation of Main Aircraft Parking Apron Areas Designated as R/1, R/2, R/3 and TH/1
Region District DBE % VBP % Federal Project #
5 9 2.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Perry
PJY 4732 Pinckneyville-DuQuoin City of Pinckneyville Pinckneyville
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
82 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of February 25, 2020 04:30 PM.

  • Will there be an electronic available for this project?
    AutoCAD files will be made available which will include horizontal linework and spot elevations. No 3D model has been developed for this project. The drawings were not developed with the intent or purpose of utilizing them for development of supplemental designs, models or any other purpose. They will be provided solely as a courtesy and Brown & Roberts, Inc. assumes no liability for those using them for any purpose. An acknowledgement from the Contractor will be required showing they understand and agree that the drawings will be utilized at their own risk and that they will not transmit them to any other parties without assuming full liability for their use. (02/26/2020)

  • On page 13 there is a detail for the existing tie down that shows a 24" deep footing. Do the new tie downs have a foundation or just poured into the 6" pavement?
    The new tie downs/mooring eyes will be cast into the new pavement with 36” long rebar bent 45 degrees horizontally in the center of the proposed pavement slab. There will be no additional footing below the pavement. The existing footings will be filled with aggregate and compacted as specified in the special provisions. (02/26/2020)

  • One page under #7 it says that there is a Special Provisions Date January 10, 2020 for Construction of Airports. Can you provided a link or directions on how to find the newest special provisions. The most recent I could find on the website was from 2012.
    The most recent Illinois Standard Specifications for Construction of Airports is dated April 1, 2012. However, the Special Provisions for contract PL017 are dated January 10, 2020 and are amended as necessary to reflect changes made in the Standard Specifications of April 1, 2012. (02/26/2020)

Authorized Bidders

  • 5306 Samron Midwest Contracting, Inc.
    PO Box 1555
    Murphysboro, IL 62966
    Phone: (618) 687-5500 Fax: (618) 684-9341 Email: info@samron.com
    $643,428.00

  • 0338 Baxmeyer Construction, Inc.
    1034 Floraville Road
    Waterloo, IL 62298
    Phone: (618) 939-3000 Fax: (618) 939-4299 Email: estimator@baxmeyerconstruction.com
    $757,977.00

  • 5550 E. T. Simonds Construction Company
    1500 N Oakland Ave
    PO Box 2107
    Carbondale, IL 62902
    PO Box 2107
    Carbondale, IL 62902
    Phone: (618) 457-8191 Fax: (618) 549-0131 Email: jjones@etsimonds.com
    $690,027.50

  • 5802 Stutz Excavating, Inc.
    3837 Fosterburg Road
    Alton, IL 62002
    Phone: (618) 259-2485 Fax: (618) 259-2465 Email: No Record

Non Bidders

  • 3064 Kamadulski Excavating and Grading Company, Inc.
    (Pending Authorization)
    4336 Hwy. 162
    Granite City, IL 62040
    Phone: (618) 931-3760 Fax: (618) 797-1228 Email: brett@kamadulski.com

  • 3352 Lake Contracting, Inc.
    (Pending Authorization)
    4650 Stone Church Rd.
    Addieville, IL 62214
    Phone: (618) 824-6522 Fax: (618) 824-6521 Email: darylf70@yahoo.com

Pay Item # UOM Description Type Quantity Unit Price
AR150520 L SUM MOBILIZATION Base items 1.000
AR152511 SQ YD SUBGRADE REPAIR Base items 2,000.000
AR162504 L.F. CLASS E FENCE 4' Base items 120.000
AR162900 FOOT REMOVE CLASS E FENCE Base items 120.000
AR209510 TON CRUSHED AGGREGATE BASE COURSE Base items 3,000.000
AR401900 SQ YD REMOVE BITUMINOUS PAVEMENT Base items 7,492.000
AR501506 SQ YD 6" PCC PAVEMENT Base items 7,931.000
AR501530 EACH PCC TEST BATCH Base items 1.000
AR501900 SQ YD REMOVE PCC PAVEMENT Base items 298.000
AR510510 EACH TIE DOWN Base items 36.000
AR510900 EACH REMOVE TIE DOWN Base items 36.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 740.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 1,080.000
AR751940 EACH ADJUST INLET Base items 1.000