20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
42.000
|
|
21101615
|
SQ YD
|
TOPSOIL FURNISH AND PLACE, 4"
|
Base items
|
777.000
|
|
25200110
|
SQ YD
|
SODDING, SALT TOLERANT
|
Base items
|
777.000
|
|
25200200
|
UNIT
|
SUPPLEMENTAL WATERING
|
Base items
|
9.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
16.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
6,810.000
|
|
40600400
|
TON
|
MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS
|
Base items
|
15.000
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
232.000
|
|
40600985
|
SQ YD
|
PORTLAND CEMENT CONCRETE SURFACE REMOVAL - BUTT JOINT
|
Base items
|
370.000
|
|
40601005
|
TON
|
HOT-MIX ASPHALT REPLACEMENT OVER PATCHES
|
Base items
|
60.000
|
|
40603200
|
TON
|
POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-4.75, N50
|
Base items
|
424.000
|
|
40604060
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50
|
Base items
|
989.000
|
|
42001300
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
1,316.000
|
|
42300200
|
SQ YD
|
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH
|
Base items
|
10.000
|
|
42400200
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH
|
Base items
|
2,655.000
|
|
42400300
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH
|
Base items
|
50.000
|
|
42400800
|
SQ FT
|
DETECTABLE WARNINGS
|
Base items
|
200.000
|
|
44000159
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/2"
|
Base items
|
7,345.000
|
|
44000200
|
SQ YD
|
DRIVEWAY PAVEMENT REMOVAL
|
Base items
|
10.000
|
|
44000600
|
SQ FT
|
SIDEWALK REMOVAL
|
Base items
|
2,655.000
|
|
44002210
|
SQ YD
|
HOT-MIX ASPHALT REMOVAL OVER PATCHES, 2 1/2"
|
Base items
|
422.000
|
|
44201765
|
SQ YD
|
CLASS D PATCHES, TYPE II, 10 INCH
|
Base items
|
160.000
|
|
44201769
|
SQ YD
|
CLASS D PATCHES, TYPE III, 10 INCH
|
Base items
|
16.000
|
|
44201771
|
SQ YD
|
CLASS D PATCHES, TYPE IV, 10 INCH
|
Base items
|
230.000
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
74.000
|
|
60250200
|
EACH
|
CATCH BASINS TO BE ADJUSTED
|
Base items
|
1.000
|
|
60252800
|
EACH
|
CATCH BASINS TO BE RECONSTRUCTED
|
Base items
|
2.000
|
|
60260100
|
EACH
|
INLETS TO BE ADJUSTED
|
Base items
|
2.000
|
|
60262700
|
EACH
|
INLETS TO BE RECONSTRUCTED
|
Base items
|
2.000
|
|
60406000
|
EACH
|
FRAMES AND LIDS, TYPE 1, OPEN LID
|
Base items
|
2.000
|
|
60406100
|
EACH
|
FRAMES AND LIDS, TYPE 1, CLOSED LID
|
Base items
|
5.000
|
|
66900200
|
CU YD
|
NON-SPECIAL WASTE DISPOSAL
|
Base items
|
42.000
|
|
66900530
|
EACH
|
SOIL DISPOSAL ANALYSIS
|
Base items
|
4.000
|
|
66901001
|
L SUM
|
REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN
|
Base items
|
1.000
|
|
66901003
|
L SUM
|
REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT
|
Base items
|
1.000
|
|
66901006
|
CAL DA
|
REGULATED SUBSTANCES MONITORING
|
Base items
|
2.000
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
6.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70102620
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701501
|
Base items
|
1.000
|
|
70102640
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701801
|
Base items
|
1.000
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
1,490.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
500.000
|
|
70300220
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4"
|
Base items
|
5,150.000
|
|
70300280
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 24"
|
Base items
|
20.000
|
|
70300520
|
FOOT
|
PAVEMENT MARKING TAPE, TYPE III 4"
|
Base items
|
371.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
5,150.000
|
|
78000600
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 12"
|
Base items
|
20.000
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
75.000
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
75.000
|
|
X0320050
|
L SUM
|
CONSTRUCTION LAYOUT (SPECIAL)
|
Base items
|
1.000
|
|
X2020110
|
UNIT
|
GRADING AND SHAPING SHOULDERS
|
Base items
|
37.000
|
|
X4405030
|
FOOT
|
LONGITUDINAL PARTIAL DEPTH REMOVAL 3"
|
Base items
|
909.300
|
|
X440A300
|
SQ YD
|
PORTLAND CEMENT CONCRETE SURFACE REMOVAL (COLD MILLING) VARIABLE DEPTH
|
Base items
|
606.000
|
|
X4420900
|
TON
|
LONGITUDINAL PARTIAL DEPTH PATCHING
|
Base items
|
72.000
|
|
X5537800
|
FOOT
|
STORM SEWERS TO BE CLEANED 12"
|
Base items
|
100.000
|
|
X7030005
|
SQ FT
|
TEMPORARY PAVEMENT MARKING REMOVAL
|
Base items
|
1,840.000
|
|
Z0004562
|
FOOT
|
COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT
|
Base items
|
3,563.000
|
|
Z0018500
|
EACH
|
DRAINAGE STRUCTURES TO BE CLEANED
|
Base items
|
30.000
|
|
Z0030850
|
SQ FT
|
TEMPORARY INFORMATION SIGNING
|
Base items
|
78.000
|
|
Z0033700
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
3,696.000
|
|