Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
1 | 1 | 0.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
Small Business Initiative (Bid Bond is not required) |
25 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
25003210 | ACRE | INTERSEEDING, CLASS 2A | Base items | 0.500 | |||
25100125 | ACRE | MULCH, METHOD 3 | Base items | 0.500 | |||
44000400 | FOOT | GUTTER REMOVAL | Base items | 100.000 | |||
50300300 | SQ YD | PROTECTIVE COAT | Base items | 28.000 | |||
66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 10.000 | |||
66900530 | EACH | SOIL DISPOSAL ANALYSIS | Base items | 1.000 | |||
66901001 | L SUM | REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN | Base items | 1.000 | |||
66901003 | L SUM | REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT | Base items | 1.000 | |||
66901006 | CAL DA | REGULATED SUBSTANCES MONITORING | Base items | 2.000 | |||
67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 3.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100310 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 | Base items | 1.000 | |||
X0322906 | EACH | WEEP HOLES CORED | Base items | 124.000 | |||
X6062400 | FOOT | CONCRETE GUTTER (SPECIAL) | Base items | 100.000 | |||
Z0015550 | CU YD | DEBRIS REMOVAL | Base items | 22.000 | |||
Z0018500 | EACH | DRAINAGE STRUCTURES TO BE CLEANED | Base items | 3.000 | |||
Z0018600 | EACH | DRAINAGE STRUCTURES TO BE RECONSTRUCTED | Base items | 1.000 | |||
Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 51.400 | |||
Z0064800 | UNIT | SELECTIVE CLEARING | Base items | 22.000 | |||
No More Pay Items |