20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
5,980.000
|
|
20800150
|
CU YD
|
TRENCH BACKFILL
|
Base items
|
21.200
|
|
21101615
|
SQ YD
|
TOPSOIL FURNISH AND PLACE, 4"
|
Base items
|
24,637.000
|
|
25000200
|
ACRE
|
SEEDING, CLASS 2
|
Base items
|
5.250
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
473.000
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
473.000
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
473.000
|
|
25100115
|
ACRE
|
MULCH, METHOD 2
|
Base items
|
5.250
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
508.000
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
24.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
19,665.000
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
8.000
|
|
35101400
|
TON
|
AGGREGATE BASE COURSE, TYPE B
|
Base items
|
10,464.000
|
|
40200800
|
TON
|
AGGREGATE SURFACE COURSE, TYPE B
|
Base items
|
452.000
|
|
40300200
|
TON
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
5.400
|
|
40300400
|
TON
|
BITUMINOUS MATERIALS (COVER AND SEAL COATS)
|
Base items
|
11.700
|
|
40300500
|
TON
|
COVER COAT AGGREGATE
|
Base items
|
52.000
|
|
40300600
|
TON
|
SEAL COAT AGGREGATE
|
Base items
|
41.000
|
|
40600275
|
POUND
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
45,321.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
4,401.000
|
|
40602965
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50
|
Base items
|
1,683.000
|
|
40604050
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
1,647.000
|
|
42400300
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH
|
Base items
|
567.000
|
|
42400800
|
SQ FT
|
DETECTABLE WARNINGS
|
Base items
|
183.000
|
|
48101200
|
TON
|
AGGREGATE SHOULDERS, TYPE B
|
Base items
|
1,308.000
|
|
50104400
|
EACH
|
CONCRETE HEADWALL REMOVAL
|
Base items
|
1.000
|
|
50200100
|
CU YD
|
STRUCTURE EXCAVATION
|
Base items
|
5.000
|
|
50300225
|
CU YD
|
CONCRETE STRUCTURES
|
Base items
|
23.600
|
|
50300300
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
35.000
|
|
50301350
|
CU YD
|
CONCRETE SUPERSTRUCTURE (APPROACH SLAB)
|
Base items
|
11.800
|
|
50800105
|
POUND
|
REINFORCEMENT BARS
|
Base items
|
3,730.000
|
|
50800205
|
POUND
|
REINFORCEMENT BARS, EPOXY COATED
|
Base items
|
4,140.000
|
|
51200957
|
FOOT
|
FURNISHING METAL SHELL PILES 12" X 0.250"
|
Base items
|
100.000
|
|
51202305
|
FOOT
|
DRIVING PILES
|
Base items
|
100.000
|
|
51203200
|
EACH
|
TEST PILE METAL SHELLS
|
Base items
|
2.000
|
|
52100520
|
EACH
|
ANCHOR BOLTS, 1"
|
Base items
|
8.000
|
|
54001001
|
EACH
|
BOX CULVERT END SECTIONS, CULVERT NO. 1
|
Base items
|
1.000
|
|
54001002
|
EACH
|
BOX CULVERT END SECTIONS, CULVERT NO. 2
|
Base items
|
1.000
|
|
54002020
|
EACH
|
EXPANSION BOLTS 3/4 INCH
|
Base items
|
61.000
|
|
54003000
|
CU YD
|
CONCRETE BOX CULVERTS
|
Base items
|
13.800
|
|
54010403
|
FOOT
|
PRECAST CONCRETE BOX CULVERTS 4' X 3'
|
Base items
|
12.000
|
|
54213660
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 15"
|
Base items
|
1.000
|
|
54248510
|
CU YD
|
CONCRETE COLLAR
|
Base items
|
0.600
|
|
54261718
|
EACH
|
STEEL FLARED END SECTIONS 18"
|
Base items
|
6.000
|
|
54261818
|
EACH
|
STEEL FLARED END SECTIONS, EQUIVALENT ROUND-SIZE 18"
|
Base items
|
10.000
|
|
542D0223
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 1 18"
|
Base items
|
88.000
|
|
542D5473
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 1 EQUIVALENT ROUND-SIZE 18"
|
Base items
|
534.000
|
|
58600101
|
CU YD
|
GRANULAR BACKFILL FOR STRUCTURES
|
Base items
|
32.000
|
|
58700300
|
SQ FT
|
CONCRETE SEALER
|
Base items
|
486.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
72000100
|
SQ FT
|
SIGN PANEL - TYPE 1
|
Base items
|
144.000
|
|
72800100
|
FOOT
|
TELESCOPING STEEL SIGN SUPPORT
|
Base items
|
476.000
|
|
78000100
|
SQ FT
|
THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
151.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
574.000
|
|
78000600
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 12"
|
Base items
|
260.000
|
|
78000650
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 24"
|
Base items
|
40.000
|
|
X0300010
|
POUND
|
BITUMINOUS MATERIALS (FOG SEAL)
|
Base items
|
4,856.000
|
|
X0322508
|
SQ FT
|
PEDESTRIAN TRUSS SUPERSTRUCTURE
|
Base items
|
2,100.000
|
|
X0350805
|
EACH
|
FOLD DOWN BOLLARDS
|
Base items
|
11.000
|
|
X6640535
|
FOOT
|
CHAIN LINK FENCE, 6' ATTACHED TO STRUCTURE
|
Base items
|
20.000
|
|
X6640560
|
FOOT
|
CHAIN LINK FENCE, 6' (SPECIAL)
|
Base items
|
20.000
|
|
X7010216
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
|
Base items
|
1.000
|
|
XX006985
|
CU YD
|
SHOULDER EXCAVATION
|
Base items
|
120.000
|
|
XX008340
|
FOOT
|
TIMBER BRIDGE APPROACH RAILING
|
Base items
|
80.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
500.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
500.000
|
$15.00
|