Home > Notice of Letting > Contract Detail

June 12, 2020 Letting 12:00 PM
051-68F58

Bulletin Description

2.42 miles of longitudinal joint repair and pavement marking maintenance along US 150 (War Memorial Dr) from N Frostwood Pkwy to W Northbound Ave.
Region District DBE % VBP % Federal Project #
3 4 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Peoria
  • FAP 317
  • 116-I-2;117-I-4
  • C-94-072-20
  • 0-02175-4003
Contract Specifics
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of June 02, 2020 04:30 PM.

Authorized Bidders

  • 1284 R. A. Cullinan and Son, a div of UCM, Inc.
    121 West Park Street
    Tremont, IL 61568
    P.O. Box 166
    Tremont, IL 61568
    Phone: (309) 925-2711 Fax: (309) 925-7131 Email: tom.wall@ucm.biz
    $591,671.09

Non Bidders

  • 3382 Laser Electric, Inc.
    3611 S.W. Adams St.
    Peoria, IL 61605
    PO Box 5008
    Peoria, IL 61601
    Phone: (309) 693-2400 Fax: (309) 676-7732 Email: jason@laserelectricinc.com

Pay Item # UOM Description Type Quantity Unit Price
67100100 L SUM MOBILIZATION Base items 1.000
70102632 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701602 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 60.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 2,884.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 961.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 59,548.000
78001130 FOOT PAINT PAVEMENT MARKING - LINE 6" Base items 6,150.000
78001140 FOOT PAINT PAVEMENT MARKING - LINE 8" Base items 11,961.000
78001180 FOOT PAINT PAVEMENT MARKING - LINE 24" Base items 541.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 360.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 360.000
X0327739 L SUM MISCELLANEOUS ELECTRICAL WORK Base items 1.000
Z0033600 FOOT LONGITUDINAL JOINT REPAIR Base items 33,102.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.