Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
5 | 9 | 0.00 | 0.00 | 4SEF(501) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
30 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
31101000 | TON | SUBBASE GRANULAR MATERIAL, TYPE B | Base items | 73.000 | |||
40600275 | POUND | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 5,741.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 1,148.000 | |||
40600990 | SQ YD | TEMPORARY RAMP | Base items | 170.000 | |||
40602985 | TON | HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N70 | Base items | 148.000 | |||
40604052 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 | Base items | 296.000 | |||
42400300 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH | Base items | 1,564.000 | |||
42400800 | SQ FT | DETECTABLE WARNINGS | Base items | 121.000 | |||
44000161 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 3" | Base items | 2,641.000 | |||
44000500 | FOOT | COMBINATION CURB AND GUTTER REMOVAL | Base items | 219.000 | |||
44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 1,446.000 | |||
60300105 | EACH | FRAMES AND GRATES TO BE ADJUSTED | Base items | 7.000 | |||
60300305 | EACH | FRAMES AND LIDS TO BE ADJUSTED | Base items | 2.000 | |||
60603800 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 | Base items | 219.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70102620 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 | Base items | 1.000 | |||
70102640 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 | Base items | 1.000 | |||
78001130 | FOOT | PAINT PAVEMENT MARKING - LINE 6" | Base items | 350.000 | |||
78001180 | FOOT | PAINT PAVEMENT MARKING - LINE 24" | Base items | 46.000 | |||
No More Pay Items |