Home > Notice of Letting > Contract Detail

June 12, 2020 Letting 12:00 PM
219-66J73

Bulletin Description

3P milling and resurfacing (Standard Overlay) on SBI 23 from Coltonville Rd to Highland Dr in Sycamore.
Region District DBE % VBP % Federal Project #
2 3 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • DeKalb
  • SBI 23
  • (27)RS-1
  • C-93-051-19
  • 3-02319-0110
Contract Specifics
Small Business Initiative (Bid Bond is not required)
15 Working Days
Previously advertised on April 24, 2020 (Item 034).
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of June 02, 2020 04:30 PM.

Authorized Bidders

  • 2545 Herbig Blacktop Construction
    900 Depot Avenue
    Dixon, IL 61021
    Phone: No Record Fax: No Record Email: No Record
    $261,874.00

  • 5564 G. M. Sipes Construction, Inc.
    503 E. ADAMS ST
    RUSHVILLE, IL 62681
    P.O. BOX 109
    RUSHVILLE, IL 62681
    Phone: (217) 322-6543 Fax: (217) 322-4712 Email: support@gmsipes.com
    $325,984.85

Non Bidders

  • 1305 Curran Contracting Company
    286 Memorial Court
    Crystal Lake, IL 60014
    Phone: (815) 455-5100 Fax: (815) 455-7894 Email: estimating@currancontracting.com

  • 3706 Martin & Company Excavating
    (Pending Authorization)
    2456 E. Pleasant Grove Road
    Oregon, IL 61061
    P.O. Box 443
    Oregon, IL 61061
    Phone: (815) 732-2422 Fax: (815) 732-2092 Email: info@martincoinc.net

  • 5112 Rock Road Companies, Inc.
    301 W B-R Townline Road
    Janesville, WI 53546
    P.O. Box 1818
    Janesville, WI 53547
    Phone: (608) 752-8944 Fax: (608) 365-1113 Email: bids@rockroads.com

  • 5378 Schroeder Asphalt Services, Inc.
    (Pending Authorization)
    11022 Grant Hwy.
    Marengo, IL 60152
    PO Box 831
    Huntley, IL 60142
    Phone: (815) 923-4380 Fax: (815) 923-4389 Email: No Record

Pay Item # UOM Description Type Quantity Unit Price
35100500 SQ YD AGGREGATE BASE COURSE, TYPE A 6" Base items 609.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 274.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 2,072.000
40600400 TON MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS Base items 1.100
40600900 TON HOT-MIX ASPHALT BINDER COURSE (HAND METHOD), N50 Base items 2.000
40600990 SQ YD TEMPORARY RAMP Base items 90.000
40602965 TON HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50 Base items 223.000
40604000 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5FG, MIX "C", N50 Base items 223.000
40800050 TON INCIDENTAL HOT-MIX ASPHALT SURFACING Base items 3.000
44000154 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/4" Base items 41.000
44000158 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/4" Base items 2,580.000
44004250 SQ YD PAVED SHOULDER REMOVAL Base items 1,069.000
44201761 SQ YD CLASS D PATCHES, TYPE I, 10 INCH Base items 32.000
44201765 SQ YD CLASS D PATCHES, TYPE II, 10 INCH Base items 120.000
44201769 SQ YD CLASS D PATCHES, TYPE III, 10 INCH Base items 123.000
44201771 SQ YD CLASS D PATCHES, TYPE IV, 10 INCH Base items 96.000
48102100 TON AGGREGATE WEDGE SHOULDER, TYPE B Base items 28.000
48203029 SQ YD HOT-MIX ASPHALT SHOULDERS, 8" Base items 459.000
60300305 EACH FRAMES AND LIDS TO BE ADJUSTED Base items 1.000
67100100 L SUM MOBILIZATION Base items 1.000
70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 211.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 70.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 2,184.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 295.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 9.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 42.000
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 1,244.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.