Home > Notice of Letting > Contract Detail

June 12, 2020 Letting 12:00 PM
145-62J91

Bulletin Description

(1.32 Mile) Standard overlay from Bluff Road to Frontage Road West. in Village of Channahon in Will County. , (1.32 Mile) Standard overlay from Bluff Road to Frontage Road West in
Region District DBE % VBP % Federal Project #
1 1 13.00 0.00 STPJUC4(200)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Will
  • FAI 55
  • 2019-095-RS-SW&SR
  • C-91-050-20
  • 1-79538-0000
Contract Specifics
Hot Mix Asphalt-Small Batch
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of June 02, 2020 04:30 PM.

  • There is no tree removal or selective clearing called out on the plans. Please advise.
    Please see the roadway and pavement making plan sheet notes for locations of tree removal, tree pruning and selective clearing. Final locations will be determined in the field by the engineer. (06/03/2020)

Authorized Bidders

  • 1750 P. T. Ferro Construction Co.
    700 South Rowell Ave.
    Joliet, IL 60433
    P.O. Box 156
    Joliet, IL 60434
    Phone: (815) 726-6284 Fax: (815) 726-5614 Email: estimating@ptferro.com
    $361,155.40

  • 6117 Austin Tyler Construction, Inc.
    23343 S Ridge Road
    Elwood, IL 60421
    Phone: (815) 726-1090 Fax: (815) 726-1171 Email: info@austin-tyler.com

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com
    $426,029.49

  • 1950 Gallagher Asphalt Corporation
    18100 South Indiana Avenue
    Thornton, IL 60476
    Phone: (708) 877-7160 Fax: (708) 877-5222 Email: bids@gallagherasphalt.com
    $398,895.24

  • 3069 K-Five Construction Corporation
    999 Oakmont Plaza Drive
    Suite 200
    Westmont, IL 60559
    Phone: (630) 257-5600 Fax: (630) 257-6788 Email: estimating@k-five.net

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20101350 EACH TREE PRUNING (OVER 10 INCH DIAMETER) Base items 11.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 15,168.000
40600400 TON MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS Base items 34.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 72.000
40603200 TON POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-4.75, N50 Base items 927.000
40604062 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 Base items 1,888.000
44000158 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/4" Base items 22,471.000
44201765 SQ YD CLASS D PATCHES, TYPE II, 10 INCH Base items 200.000
44201769 SQ YD CLASS D PATCHES, TYPE III, 10 INCH Base items 150.000
63100167 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT Base items 3.000
63200310 FOOT GUARDRAIL REMOVAL Base items 150.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70100600 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701336 Base items 1.000
70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 8,549.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 2,847.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 19,854.000
70300520 FOOT PAVEMENT MARKING TAPE, TYPE III 4" Base items 2,138.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 19,854.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 147.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 140.000
X2010350 ACRE TREE REMOVAL, ACRES (SPECIAL) Base items 0.750
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 6,612.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 51.400
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 6,974.000
Z0064800 UNIT SELECTIVE CLEARING Base items 25.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.