July 30, 2021 Letting 12:00 PM
049-85713

Bulletin Description

Replace the bridge carrying TR 120 over Piscasaw Creek, 3.5 miles southeast of Poplar Grove.
Region District DBE % VBP % Federal Project #
2 2 0.00 0.00 5YF7(613)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Boone
  • TR 120
  • 20-03121-00-BR
  • C-92-057-21
  • 2-10591-0000
  • 2-10591-0010
Contract Specifics
40 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (6 Submitted / 6 Answered ) Questions not accepted as of July 20, 2021 04:30 PM.

  • Plan sheet 9 calls out the minimum steel sheet piling effective section modulus, however there are two different sheeting sections required with different section modulus. In addition, the section modulus is provided in inch/foot rather than inch3/foot.
    An addendum will be issued. (07/14/2021)

  • Are plans of the existing bridge available to be published for our use?
    Existing bridge plans will be posted as Additional Information. (07/12/2021)

  • Plan sheet 9, general note for the sheet pile cap calls out AASHTO M164 Type 3. This appears to be a bolt specification – please clarify.
    An addendum will be issued. (07/12/2021)

  • The steel sheeting for the wings appears to be SZ-24 and the toe wall to be SZ-15 in all plan references, except the “corner detail – long wing” detail on plan sheet 10 calls out SZ-15 in the wing wall. Please clarify if this should be SZ-24.
    An addendum will be issued. (07/12/2021)

  • Plan sheet 10, “wingwall elevation” calls out painting for the channel cap. Should the cap receive only a primer but no paint top coats? Is the steel sheeting to be painted or left uncoated – would the cap be painted and the sheeting left uncoated?
    The channel cap shall be coated with an Organic Zinc Rich Primer as listed under the Wingwall Elevation drawing detail on sheet 10. The sheet pile wingwalls will be left uncoated. (07/12/2021)

  • On sheet 9, the out-out of the S-1 rail is shown as 37'-4 which totals 74'-8 not 87 LF. What is the correct footage?
    An addendum will be issued. (07/08/2021)

Authorized Bidders

  • 5570 Sjostrom & Sons, Inc.
    1129 Harrison Ave.
    Rockford, IL 61104
    Phone: (815) 226-0330 Fax: (815) 226-8868 Email: heavyhighway@sjostromconstruction.com
    $409,084.91

  • 0103 Alliance Contractors, Inc.
    1166 Lake Avenue
    Woodstock, IL 60098
    Phone: (815) 338-5900 Fax: (815) 338-9109 Email: estimating@alliancecontractors.com
    $491,727.50

  • 1045 Civil Constructors, Inc. d/b/a/ Helm Civil
    2283 Bus Hwy 20 East
    Freeport, IL 61032
    PO Box 750
    Freeport, IL 61032
    Phone: (815) 235-2200 Fax: (815) 235-2219 Email: civilestimating@helmgroup.com
    $476,786.15

  • 1216 Copenhaver Construction, Inc.
    75 Koppie Dr
    Gilberts, IL 60136
    Phone: (847) 428-6696 Fax: (847) 428-6798 Email: copenhaverinc@yahoo.com
    $531,440.72

  • 3706 Martin & Company Excavating
    2456 E. Pleasant Grove Road
    Oregon, IL 61061
    P.O. Box 443
    Oregon, IL 61061
    Phone: (815) 732-2422 Fax: (815) 732-2092 Email: info@martincoinc.net

  • 4741 Phoenix Corporation of the Quad Cities
    1006 Rosehill Rd
    Port Byron, IL 61275
    PO Box 445
    Rapids City, IL 61278
    Phone: (309) 523-3687 Fax: (309) 523-3752 Email: mdecap@phoenixcorp.org
    $512,989.30

Non Bidders

  • 1305 Curran Contracting Company
    286 Memorial Court
    Crystal Lake, IL 60014
    Phone: (815) 455-5100 Fax: (815) 455-7894 Email: estimating@currancontracting.com

  • 0280 Peter Baker & Son Co.
    1349 Rockland Road
    Lake Bluff, IL 60044
    Phone: (847) 362-3663 Fax: (847) 362-0707 Email: john@peterbaker.com

  • 0958 William Charles Construction Company, LLC
    833 Featherstone Road
    Rockford, IL 61107
    P.O. Box 2071
    Loves Park, IL 61130
    Phone: (815) 654-4700 Fax: (815) 654-4736 Email: estimating@williamcharlesconstruction.com

Pay Item # UOM Description Type Quantity Unit Price
25100630 SQ YD EROSION CONTROL BLANKET Base items 360.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 142.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 177.000
35101400 TON AGGREGATE BASE COURSE, TYPE B Base items 274.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 822.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 83.000
40603080 TON HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 Base items 63.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 63.000
50100100 EACH REMOVAL OF EXISTING STRUCTURES Base items 1.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 3,088.000
50900205 FOOT STEEL RAILING, TYPE S1 Base items 78.000
51500100 EACH NAME PLATES Base items 1.000
52200015 SQ FT PERMANENT SHEET PILING Base items 1,430.000
54003000 CU YD CONCRETE BOX CULVERTS Base items 21.800
54011008 FOOT PRECAST CONCRETE BOX CULVERTS 10' X 8' Base items 106.000
67100100 L SUM MOBILIZATION Base items 1.000
X0900064 SQ YD MEMBRANE WATERPROOFING SYSTEM FOR BURIED STRUCTURES Base items 165.000
X2020410 CU YD EARTH EXCAVATION (SPECIAL) Base items 60.000
X2070304 CU YD POROUS GRANULAR EMBANKMENT (SPECIAL) Base items 204.000
X2501020 ACRE SEEDING, CLASS 2A (SPECIAL) Base items 0.100
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0054400 CU YD ROCK FILL Base items 125.000
No More Pay Items