August 05, 2022 Letting 12:00 PM
13A-MV068

Bulletin Description

Replace High Intensity Runway Lights (HIRL) on primary runway and replace Medium Intensity Runway Lights (MIRL) on crosswind runway
Region District DBE % VBP % Federal Project #
5 9 1.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Jefferson
MVN 4951 Mt. Vernon Mt. Vernon Airport Authority Mt. Vernon
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
85 Calendar Days
Previously advertised on June 17, 2022 (Item 09A).
This project is currently unfunded but actively seeking discretionary funds.
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of July 26, 2022 04:30 PM.

Authorized Bidders

  • 6537 Wissehr Electric, Inc.
    5801 W State Route 161
    Belleville, IL 62223
    Phone: (618) 398-7575 Fax: (618) 398-7180 Email: jk@wissehr.com

  • 0936 Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC
    1414 W. Anthony Drive
    Urbana, IL 61802
    PO Box 1730
    Champaign, IL 61824
    Phone: (217) 356-2518 Fax: (217) 356-1539 Email: kyleb@champaignasphalt.com

  • 1671 Electrico, Inc.
    7706 Wagner Road
    Millstadt, IL 62260
    Phone: (618) 538-9500 Fax: (618) 538-7878 Email: matt@electricoinc.us

  • 1630 J. F. Edwards Construction Company
    220 SOUTH CHICAGO STREET
    Geneseo, IL 61254
    220 S Chicago St
    Geneseo, IL 61254
    Phone: (309) 944-4681 Fax: No Record Email: kelliott@jfecc.net

  • 3011 J. Ranck Electric, Inc.
    1993 Gover Parkway
    MT. Pleasant, MI 48858
    Phone: (989) 775-7393 Fax: (989) 775-7393 Email: ajranck@jranck.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR108108 FOOT 1/C #8 5 KV UG CABLE Base items 31,150.000
AR109200 L SUM INSTALL ELECTRICAL EQUIPMENT Base items 1.000
AR110012 FOOT 2" DIRECTIONAL BORE Base items 2,400.000
AR110202 FOOT 2" PVC DUCT, DIRECT BURY Base items 24,600.000
AR115610 EACH ELECTRICAL HANDHOLE Base items 6.000
AR125400 EACH REPLACE ISOLATION TRANSFORMER Base items 15.000
AR125511 EACH MIRL, BASE MOUNTED-LED Base items 28.000
AR125512 EACH MIRL, INPAVEMENT Base items 1.000
AR125515 EACH HIRL, BASE MOUNTED Base items 59.000
AR125525 EACH HIRL, INPAVEMENT Base items 5.000
AR125546 EACH MI THRESHOLD LIGHT BASE MTD-LED Base items 16.000
AR125550 EACH HI THRESHOLD LIGHT BASE MTD Base items 22.000
AR125565 EACH SPLICE CAN Base items 43.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR800476 L SUM REMOVE AIRFIELD LIGHTING Base items 1.000
No More Pay Items