Home > Notice of Letting > Contract Detail

August 05, 2022 Letting 12:00 PM
019-68H09

Bulletin Description

Mill and resurface parking area and install parking striping at the Peoria West storage yard (6500 W. Highway 150, Edwards, IL., 2.5 Miles west of Peoria ou US 150).
Region District DBE % VBP % Federal Project #
3 4 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Peoria
  • PEORIA
  • WEST
  • MAINT.
  • YARD
  • D4 PARKING LOT RESUFR 2022-1
  • C-94-043-22
  • N/A
Contract Specifics
15 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of July 26, 2022 04:30 PM.

  • Could you please clarify your PREPARATION OF BASE (SPECIAL) special provision on page 3? The special provision states "the existing gravel parking area" but the existing lot is a deteriorating HMA lot. Is the lot to be tilled or the remaining asphalt and chunks removed since they cannot be shaped? Also what frequency of rolling is required during the two days of repeated wetting and rolling?
    The existing surface appears to be both HMA and gravel, or the HMA is so badly broken that it appears to be loose gravel. The borders of the lot have the most remaining HMA, that is heaved up along the curb. This will be graded and compacted "By others" prior to base preparation. (See page 7) The IDOT Peoria West maintenance crew will be completing this task. Under Job Specific Notes on page 2, Jesse Staley needs contacted 7 days prior to the contractors work beginning. This will allow them the time needed to remove larger chunks of asphalt within the 12' ring of the parking lot. The remaining portion of the lot has been field verified by the D4's Mixture Control Engineer, confirming that reshaping, compacting and smoothing the base is possible in its existing state. There is no specific rolling frequency. Wetting shall be sufficient to compact virgin materials and there shall be adequate rolling to set the base. These shall be done to the satisfaction of the Engineer. (07/26/2022)

Authorized Bidders

  • 1284 R. A. Cullinan and Son, a div of UCM, Inc.
    121 West Park Street
    Tremont, IL 61568
    P.O. Box 166
    Tremont, IL 61568
    Phone: (309) 925-2711 Fax: (309) 925-7131 Email: tom.wall@ucm.biz
    $204,296.20

Non Bidders

  • 0335 Otto Baum Company, Inc.
    (Pending Authorization)
    866 N. Main Street
    Morton, IL 61550
    Phone: (309) 266-7114 Fax: (309) 263-1050 Email: johnbasham@ottobaum.com

Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 69.000
31101000 TON SUBBASE GRANULAR MATERIAL, TYPE B Base items 19.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 554.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 2,289.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 329.000
42400800 SQ FT DETECTABLE WARNINGS Base items 10.000
44000300 FOOT CURB REMOVAL Base items 41.000
60260100 EACH INLETS TO BE ADJUSTED Base items 1.000
60600605 FOOT CONCRETE CURB, TYPE B Base items 36.000
67100100 L SUM MOBILIZATION Base items 1.000
78001100 SQ FT PAINT PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 45.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 1,474.000
X0301430 EACH PRECAST CONCRETE PARKING BLOCK Base items 13.000
X0800006 SQ YD PREPARATION OF BASE (SPECIAL) Base items 1,467.000
X1200251 EACH CONCRETE APRON FOR INLET Base items 1.000
X1800002 TON RIVER ROCK Base items 30.000
X4240420 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH (SPECIAL) Base items 106.000
X4401198 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH Base items 192.000
X4404700 SQ FT SIDEWALK REMOVAL (SPECIAL) Base items 177.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.