| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 5 | 8 | 0.00 | 0.00 | 4MG2(557) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 60 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 8,178.000 | |||
| 40600985 | SQ YD | PORTLAND CEMENT CONCRETE SURFACE REMOVAL - BUTT JOINT | Base items | 514.000 | |||
| 40602970 | TON | HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N70 | Base items | 761.000 | |||
| 40604012 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5FG, MIX "D", N70 | Base items | 849.000 | |||
| 42400800 | SQ FT | DETECTABLE WARNINGS | Base items | 253.000 | |||
| 44000500 | FOOT | COMBINATION CURB AND GUTTER REMOVAL | Base items | 631.000 | |||
| 44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 1,565.000 | |||
| 44200050 | SQ YD | WELDED WIRE REINFORCEMENT | Base items | 842.000 | |||
| 44201298 | EACH | DOWEL BARS 1 1/4" | Base items | 1,179.000 | |||
| 44213200 | FOOT | SAW CUTS | Base items | 8,123.000 | |||
| 44213204 | EACH | TIE BARS 3/4" | Base items | 1,179.000 | |||
| 60255500 | EACH | MANHOLES TO BE ADJUSTED | Base items | 8.000 | |||
| 60260100 | EACH | INLETS TO BE ADJUSTED | Base items | 3.000 | |||
| 60265700 | EACH | VALVE VAULTS TO BE ADJUSTED | Base items | 5.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 78000100 | SQ FT | THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS | Base items | 86.000 | |||
| 78000200 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 4" | Base items | 6,014.000 | |||
| 78000600 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 12" | Base items | 336.000 | |||
| 78000650 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 24" | Base items | 51.000 | |||
| LR403200 | TON | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 19.000 | |||
| LR403600 | TON | SEAL COAT AGGREGATE | Base items | 133.000 | |||
| X4240420 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH (SPECIAL) | Base items | 1,690.000 | |||
| X4420668 | SQ YD | CLASS B PATCHES, TYPE IV, 8 INCH (SPECIAL) | Base items | 422.000 | |||
| X4420669 | SQ YD | CLASS B PATCHES, TYPE II, 8 INCH (SPECIAL) | Base items | 478.000 | |||
| X4420694 | SQ YD | CLASS B PATCHES, TYPE I, 8 INCH (SPECIAL) | Base items | 206.000 | |||
| X4420695 | SQ YD | CLASS B PATCHES, TYPE III, 8 INCH (SPECIAL) | Base items | 420.000 | |||
| X6060052 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 (SPECIAL) | Base items | 631.000 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| X8860105 | FOOT | DETECTOR LOOP REPLACEMENT | Base items | 1,722.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| Z0076600 | HOUR | TRAINEES | Base items | 500.000 | $0.80 | ||
| Z0076604 | HOUR | TRAINEES TRAINING PROGRAM GRADUATE | Base items | 500.000 | $15.00 | ||
| No More Pay Items | |||||||