20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
4,305.000
|
|
31101400
|
SQ YD
|
SUBBASE GRANULAR MATERIAL, TYPE B 6"
|
Base items
|
20,663.000
|
|
40600275
|
POUND
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
46,492.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
8,789.000
|
|
40603085
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70
|
Base items
|
3,472.000
|
|
40604062
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70
|
Base items
|
2,510.000
|
|
42001300
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
569.000
|
|
42300400
|
SQ YD
|
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH
|
Base items
|
261.000
|
|
42400200
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH
|
Base items
|
300.000
|
|
42400800
|
SQ FT
|
DETECTABLE WARNINGS
|
Base items
|
20.000
|
|
44000100
|
SQ YD
|
PAVEMENT REMOVAL
|
Base items
|
20,663.000
|
|
44000155
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2"
|
Base items
|
9,216.000
|
|
44000200
|
SQ YD
|
DRIVEWAY PAVEMENT REMOVAL
|
Base items
|
261.000
|
|
44000500
|
FOOT
|
COMBINATION CURB AND GUTTER REMOVAL
|
Base items
|
212.000
|
|
44000600
|
SQ FT
|
SIDEWALK REMOVAL
|
Base items
|
300.000
|
|
44200970
|
SQ YD
|
CLASS B PATCHES, TYPE II, 10 INCH
|
Base items
|
56.000
|
|
44200974
|
SQ YD
|
CLASS B PATCHES, TYPE III, 10 INCH
|
Base items
|
50.000
|
|
44201713
|
SQ YD
|
CLASS D PATCHES, TYPE I, 6 INCH
|
Base items
|
24.000
|
|
44201717
|
SQ YD
|
CLASS D PATCHES, TYPE II, 6 INCH
|
Base items
|
306.000
|
|
44201721
|
SQ YD
|
CLASS D PATCHES, TYPE III, 6 INCH
|
Base items
|
139.000
|
|
44201723
|
SQ YD
|
CLASS D PATCHES, TYPE IV, 6 INCH
|
Base items
|
116.000
|
|
66900200
|
CU YD
|
NON-SPECIAL WASTE DISPOSAL
|
Base items
|
2,650.000
|
|
66900530
|
EACH
|
SOIL DISPOSAL ANALYSIS
|
Base items
|
4.000
|
|
66901001
|
L SUM
|
REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN
|
Base items
|
1.000
|
|
66901003
|
L SUM
|
REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT
|
Base items
|
1.000
|
|
66901006
|
CAL DA
|
REGULATED SUBSTANCES MONITORING
|
Base items
|
4.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
78000100
|
SQ FT
|
THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
19.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
1,253.000
|
|
78000600
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 12"
|
Base items
|
202.000
|
|
X4400503
|
FOOT
|
COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT GREATER THAN 10 FEET
|
Base items
|
1,279.000
|
|
X5537800
|
FOOT
|
STORM SEWERS TO BE CLEANED 12"
|
Base items
|
400.000
|
|
X6700407
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A (D1)
|
Base items
|
12.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0018400
|
EACH
|
DRAINAGE STRUCTURES TO BE ADJUSTED
|
Base items
|
2.000
|
|
Z0018500
|
EACH
|
DRAINAGE STRUCTURES TO BE CLEANED
|
Base items
|
10.000
|
|
Z0018600
|
EACH
|
DRAINAGE STRUCTURES TO BE RECONSTRUCTED
|
Base items
|
4.000
|
|