November 09, 2018 Letting 10:00 AM
008-62F16

Bulletin Description

Intersection reconstruction with installation of a roundabout at IL 47 and Plato Road.
Region District DBE % VBP % Federal Project #
1 1 20.00 0.00 CMFM49L(232)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Kane
  • FAP 326
  • 106X-R-4
  • C-91-251-17
  • 1-77255-0000
Contract Specifics
Completion Date: October 31, 2019 Plus 5 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (6 Submitted / 6 Answered ) Questions not accepted as of October 30, 2018 04:30 PM.

  • in regards to the 3.0% voids let me cut to the chase here... D1 doesn't approve 3.0% void IL19.0 mixes. They stopped approving it in 2014. I can't get an approved IDOT design because D1 Materials doesn't acknowledge the mix your spec'ing out....page 26 special provision, top line,under high ESAL, target value is 4.0 percent......
    The intended material is an IL 19.0 N50 binder with the adjustment of targeting 3.0 air voids as indicated in the plans on the HMA mix table. The mix is designed at 4.0 air voids and adjusted downward. All other design requirements for the Il 19.0 binder apply. (10/26/2018)

  • Temp pavement isn't allowed to be QCP....
    The Department is in the process of issuing an addendum to clarify the issue. Contractors should monitor the website for the Addendum. (10/26/2018)

  • stabilized sub-base in the plans is 3.0% voids.....where can I find specs on a 3.0% void binder.......
    Mix design requirements are in the inserted special provision “HMA Mixture Design Requirements” and on the Mix Selection table in the plans. (10/25/2018)

  • The Earthwork Schedule (and cross-sections) show all earthwork being completed during Stage 1. However, the temp pavement sits on top of part of the cut (see stations 201+00 thru 207+00 for example). This excavation may need to be hauled off during Stages 2-3. Will this haul-off be paid for? And will additional Furnished Excavation be paid for if cut cannot be taken during Stage 1?
    Outside of the pre-stage quantity shown on the Earthwork Schedule table, earthwork quantity shown on the schedule reflects overall project earthwork. During stage 2 existing temporary pavement may remain in place, no earthwork is required, only proposed pavement construction near roundabout is required. During stage 3, removal of temporary pavement and grading of west side of IL 47 will take place. Stage I earthwork quantity shown on cross section also reflects overall earthwork quantity of project. An addendum is in process to clarify (10/25/2018)

  • Missing pay item for: Pipe Culvert Class A Type 2 EQ RS 42"
    The Department is in the process of issuing an addendum to clarify the issue. Contractors should monitor the website for the Addendum. (10/19/2018)

  • The Asphalt Mix "Stabilized Sub Base" went away in 2014...
    The Pay Item Stabilized Sub Base - Hot Mix Asphalt is valid. The Table states that it will be constructed with IL-19 binder. (10/18/2018)

Authorized Bidders

  • 1305 Curran Contracting Company
    286 Memorial Court
    Crystal Lake, IL 60014
    Phone: (815) 455-5100 Fax: (815) 455-7894 Email: estimating@currancontracting.com
    $3,377,730.00

  • 3315 A Lamp Concrete Contractors, Inc.
    1900 Wright Blvd
    Schaumburg, IL 60193
    Phone: (847) 891-6000 Fax: (847) 891-6100 Email: estimating@alampconcrete.com

  • 0103 Alliance Contractors, Inc.
    1166 Lake Avenue
    Woodstock, IL 60098
    Phone: (815) 338-5900 Fax: (815) 338-9109 Email: estimating@alliancecontractors.com

  • 0392 Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.
    1205 Garland Rd.
    Wauconda, IL 60084
    Phone: (847) 526-5457 Fax: (847) 526-4204 Email: kberger@bergercontractors.com
    $3,892,111.18

  • 2341 Builders Paving, LLC
    4401 Roosevelt Road
    Hillside, IL 60162
    Phone: (847) 419-9000 Fax: (847) 419-9050 Email: ssalinas@builderspavingllc.com

  • 1216 Copenhaver Construction, Inc.
    75 Koppie Dr
    Gilberts, IL 60136
    Phone: (847) 428-6696 Fax: (847) 428-6798 Email: copenhaverinc@yahoo.com
    $4,068,373.52

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com

  • 3345 Lake County Grading Company, LLC
    32901 N. Highway 21
    Libertyville, IL 60048
    PO Box L
    Libertyville, IL 60048
    Phone: (847) 362-2590 Fax: (847) 362-9460 Email: estimating@lcgc.com
    $3,483,776.54

  • 3356 Landmark Contractors, Inc.
    11916 W. Main St.
    Huntley, IL 60142
    Phone: (847) 669-5474 Fax: (847) 669-5529 Email: No Record

  • 3702 Martam Construction Incorporated
    1200 Gasket Dr
    Elgin, IL 60120
    Phone: (847) 608-6800 Fax: (847) 608-6804 Email: No Record
    $3,672,514.97

  • 4813 Plote Construction, Inc.
    1100 Brandt Drive
    Hoffman Estates, IL 60192
    Phone: (847) 695-9300 Fax: (847) 695-9317 Email: bids@plote.com
    $3,410,126.90

Non Bidders

  • 2657 Home Towne Electric, Inc.
    35220 Rt 83
    Lake Villa, IL 60046
    P.O. Box 863
    Lake Villa, IL 60046
    Phone: (847) 223-2800 Fax: (847) 223-7577 Email: No Record

  • 0280 Peter Baker & Son Co.
    1349 Rockland Road
    Lake Bluff, IL 60044
    Phone: (847) 362-3663 Fax: (847) 362-0707 Email: john@peterbaker.com

  • 5635 Sonoma Underground Services Inc.
    103 Ford Drive
    New Lenox, IL 60451
    Phone: (815) 320-3222 Fax: (815) 320-3233 Email: Tbaldridge@sonoma-underground.com

  • 1221 Virgil Cook & Son, Inc.
    119 N Eighth St.
    Dekalb, IL 60115
    PO Box 805
    DeKalb, IL 60115
    Phone: (815) 756-4854 Fax: (815) 756-4289 Email: vcookson@aol.com

Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 271.000
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 224.000
20200100 CU YD EARTH EXCAVATION Base items 10,541.000
20201200 CU YD REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL Base items 11,858.000
20400800 CU YD FURNISHED EXCAVATION Base items 5,525.000
20800150 CU YD TRENCH BACKFILL Base items 909.000
21101505 CU YD TOPSOIL EXCAVATION AND PLACEMENT Base items 6,067.000
25000210 ACRE SEEDING, CLASS 2A Base items 2.100
25000310 ACRE SEEDING, CLASS 4 Base items 4.200
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 567.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 567.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 567.000
25100115 ACRE MULCH, METHOD 2 Base items 6.300
25100630 SQ YD EROSION CONTROL BLANKET Base items 30,492.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 630.000
28000305 FOOT TEMPORARY DITCH CHECKS Base items 1,158.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 4,678.000
28000510 EACH INLET FILTERS Base items 28.000
28100105 SQ YD STONE RIPRAP, CLASS A3 Base items 53.300
28200200 SQ YD FILTER FABRIC Base items 53.300
30300001 CU YD AGGREGATE SUBGRADE IMPROVEMENT Base items 918.000
30300112 SQ YD AGGREGATE SUBGRADE IMPROVEMENT 12" Base items 19,462.000
31101200 SQ YD SUBBASE GRANULAR MATERIAL, TYPE B 4" Base items 6,080.000
31200500 SQ YD STABILIZED SUBBASE - HOT-MIX ASPHALT, 4" Base items 490.000
35501308 SQ YD HOT-MIX ASPHALT BASE COURSE, 6" Base items 193.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 6,346.000
40603335 TON HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 Base items 21.500
40603565 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, MIX "E", N70 Base items 106.000
40701871 SQ YD HOT-MIX ASPHALT PAVEMENT (FULL-DEPTH), 9 1/2" Base items 4,682.000
40701906 SQ YD HOT-MIX ASPHALT PAVEMENT (FULL-DEPTH), 11 1/4" Base items 6,578.000
42001300 SQ YD PROTECTIVE COAT Base items 1,335.000
44000100 SQ YD PAVEMENT REMOVAL Base items 17,098.000
44000157 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2" Base items 953.000
44000200 SQ YD DRIVEWAY PAVEMENT REMOVAL Base items 163.700
48203029 SQ YD HOT-MIX ASPHALT SHOULDERS, 8" Base items 3,954.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 101.000
54213660 EACH PRECAST REINFORCED CONCRETE FLARED END SECTIONS 15" Base items 8.000
54214737 EACH PRECAST REINFORCED CONCRETE FLARED END SECTIONS - ELLIPTICAL, EQUIVALENT ROUND-SIZE 42" Base items 2.000
5421A015 FOOT PIPE CULVERTS, CLASS A, TYPE 1 15" (TEMPORARY) Base items 15.000
54248510 CU YD CONCRETE COLLAR Base items 1.000
542A0220 FOOT PIPE CULVERTS, CLASS A, TYPE 1 15" Base items 30.600
542A8227 FOOT PIPE CULVERTS, CLASS A, TYPE 2 EQUIVALENT ROUND-SIZE 42" Base items 73.200
550A0050 FOOT STORM SEWERS, CLASS A, TYPE 1 12" Base items 23.500
550A0070 FOOT STORM SEWERS, CLASS A, TYPE 1 15" Base items 280.100
550A0340 FOOT STORM SEWERS, CLASS A, TYPE 2 12" Base items 459.300
550A0360 FOOT STORM SEWERS, CLASS A, TYPE 2 15" Base items 141.000
60100060 EACH CONCRETE HEADWALLS FOR PIPE DRAINS Base items 11.000
60108100 FOOT PIPE UNDERDRAINS 4" (SPECIAL) Base items 435.000
60108204 FOOT PIPE UNDERDRAINS, TYPE 2, 4" Base items 7,120.000
60201340 EACH CATCH BASINS, TYPE A, 4'-DIAMETER, TYPE 24 FRAME AND GRATE Base items 16.000
60208240 EACH CATCH BASINS, TYPE C, TYPE 24 FRAME AND GRATE Base items 5.000
60219000 EACH MANHOLES, TYPE A, 4'-DIAMETER, TYPE 8 GRATE Base items 1.000
60221100 EACH MANHOLES, TYPE A, 5'-DIAMETER, TYPE 1 FRAME, CLOSED LID Base items 4.000
60600095 CU YD CLASS SI CONCRETE (OUTLET) Base items 10.500
60600605 FOOT CONCRETE CURB, TYPE B Base items 254.000
60608582 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE M-4.24 Base items 4,003.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 1,945.000
66900450 L SUM SPECIAL WASTE PLANS AND REPORTS Base items 1.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 4.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 12.000
67100100 L SUM MOBILIZATION Base items 1.000
70106700 EACH TEMPORARY RUMBLE STRIPS Base items 32.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 13,195.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 4,398.000
70300210 SQ FT TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS Base items 193.200
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 11,996.000
70300240 FOOT TEMPORARY PAVEMENT MARKING - LINE 6" Base items 47.000
70300250 FOOT TEMPORARY PAVEMENT MARKING - LINE 8" Base items 403.000
70300260 FOOT TEMPORARY PAVEMENT MARKING - LINE 12" Base items 297.000
70300904 FOOT PAVEMENT MARKING TAPE, TYPE IV 4" Base items 14,820.000
70400100 FOOT TEMPORARY CONCRETE BARRIER Base items 2,004.000
70400200 FOOT RELOCATE TEMPORARY CONCRETE BARRIER Base items 2,004.000
70600251 EACH IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 2.000
70600352 EACH IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE,NARROW), TEST LEVEL 3 Base items 2.000
72000100 SQ FT SIGN PANEL - TYPE 1 Base items 299.140
72000200 SQ FT SIGN PANEL - TYPE 2 Base items 64.000
73000100 FOOT WOOD SIGN SUPPORT Base items 35.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 193.200
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 11,996.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 47.000
78000500 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 8" Base items 403.000
78000600 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 12" Base items 297.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 14,820.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 102.000
78100200 EACH TEMPORARY RAISED REFLECTIVE PAVEMENT MARKER Base items 102.000
78200011 EACH BARRIER WALL REFLECTORS, TYPE C Base items 81.000
80400100 EACH ELECTRIC SERVICE INSTALLATION Base items 1.000
80400200 L SUM ELECTRIC UTILITY SERVICE CONNECTION Base items 1.000 $5,000.00
81028220 FOOT UNDERGROUND CONDUIT, GALVANIZED STEEL, 3" DIA. Base items 285.000
81603047 FOOT UNIT DUCT, 600V, 3-1C NO.6, 1/C NO.6 GROUND, (XLP-TYPE USE), 1 1/4" DIA. POLYETHYLENE Base items 3,010.000
81702150 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 1/C NO. 2 Base items 400.000
82500360 EACH LIGHTING CONTROLLER, BASE MOUNTED, 480VOLT, 100AMP Base items 1.000
83050805 EACH LIGHT POLE, ALUMINUM, 47.5 FT. M.H., 12 FT. DAVIT ARM Base items 16.000
83600200 FOOT LIGHT POLE FOUNDATION, 24" DIAMETER Base items 152.000
83800205 EACH BREAKAWAY DEVICE, TRANSFORMER BASE, 15 INCH BOLT CIRCLE Base items 16.000
85000500 EACH MAINTENANCE OF EXISTING FLASHING BEACON INSTALLATION Base items 5.000
89502375 EACH REMOVE EXISTING TRAFFIC SIGNAL EQUIPMENT Base items 1.000
89502400 EACH REMOVE EXISTING FLASHING BEACON INSTALLATION COMPLETE Base items 4.000
A2006716 EACH TREE, QUERCUS MACROCARPA (BUR OAK), 2" CALIPER, BALLED AND BURLAPPED Base items 7.000
A2007620 EACH TREE, TAXODIUM DISTICHUM (COMMON BALD CYPRESS), 2-1/2" CALIPER, BALLED AND BURLAPPED Base items 9.000
A2008470 EACH TREE, ULMUS AMERICANA PRINCETON (PRINCETON AMERICAN ELM), 2-1/2" CALIPER , BALLED AND BURLAPPED Base items 10.000
B2001116 EACH TREE, CERCIS CANADENSIS (EASTERN REDBUD), 2" CALIPER, TREE FORM, BALLED AND BURLAPPED Base items 6.000
B2001916 EACH TREE, CRATAEGUS PHAENOPYRUM (WASHINGTON HAWTHORN), 2" CALIPER, TREE FORM, BALLED AND BURLAPPED Base items 6.000
B2003866 EACH TREE, MALUS IOENSIS (PRAIRIE CRABAPPLE), 6' HEIGHT, CLUMP FORM, BALLED AND BURLAPPED Base items 10.000
B2006016 EACH TREE, SYRINGA PEKINENSIS (PEKING LILAC), 2" CALIPER, TREE FORM, BALLED AND BURLAPPED Base items 10.000
D20010S4 EACH EVERGREEN, JUNIPERUS HORIZONTALIS WILTONII (BLUE RUG JUNIPER), 18" SPREAD, BALLED AND BURLAPPED Base items 58.000
K0012970 UNIT PERENNIAL PLANTS, BULB TYPE Base items 57.000
K0012975 UNIT PERENNIAL PLANTS, ORNAMENTAL TYPE, 4" POT Base items 20.400
K0012990 UNIT PERENNIAL PLANTS, ORNAMENTAL TYPE, GALLON POT Base items 4.800
K0029634 POUND WEED CONTROL, PRE-EMERGENT GRANULAR HERBICIDE Base items 10.700
X0327583 SQ YD STAMPED COLORED PORTLAND CEMENT CONCRETE PAVEMENT 10" (JOINTED) Base items 490.000
X1400203 EACH LUMINAIRE, LED, HORIZONTAL MOUNT, TYPE B Base items 16.000
X1400349 EACH SOLAR-POWERED FLASHING BEACON INSTALLATION Base items 2.000
X4021000 EACH TEMPORARY ACCESS (PRIVATE ENTRANCE) Base items 1.000
X4022000 EACH TEMPORARY ACCESS (COMMERCIAL ENTRANCE) Base items 1.000
X6065760 SQ FT CONCRETE MEDIAN SURFACE, 8" Base items 10,879.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
X7010410 CAL MO SPEED DISPLAY TRAILER Base items 12.000
X7015005 CAL DA CHANGEABLE MESSAGE SIGN Base items 120.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 9,573.000
X7040125 EACH PINNING TEMPORARY CONCRETE BARRIER Base items 962.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0027800 SQ YD GEOTECHNICAL FABRIC Base items 2,386.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 102.800
Z0033020 EACH LUMINAIRE SAFETY CABLE ASSEMBLY Base items 7.000
Z0062456 SQ YD TEMPORARY PAVEMENT Base items 6,857.000
Z0076600 HOUR TRAINEES Base items 500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items