Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
4 | 6 | 7.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
Hot Mix Asphalt-Small Batch |
15 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
40300400 | TON | BITUMINOUS MATERIALS (COVER AND SEAL COATS) | Base items | 137.000 | |||
40300500 | TON | COVER COAT AGGREGATE | Base items | 559.000 | |||
40300600 | TON | SEAL COAT AGGREGATE | Base items | 447.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 20,118.000 | |||
40600400 | TON | MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS | Base items | 5.000 | |||
40600625 | TON | LEVELING BINDER (MACHINE METHOD), N50 | Base items | 1,909.000 | |||
40600982 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT | Base items | 220.000 | |||
40600990 | SQ YD | TEMPORARY RAMP | Base items | 44.000 | |||
48101200 | TON | AGGREGATE SHOULDERS, TYPE B | Base items | 1,389.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100450 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 | Base items | 1.000 | |||
70100460 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 | Base items | 1.000 | |||
78300200 | EACH | RAISED REFLECTIVE PAVEMENT MARKER REMOVAL | Base items | 230.000 | |||
X4401198 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH | Base items | 44,706.000 | |||
No More Pay Items |