Home > Notice of Letting > Contract Detail

June 17, 2022 Letting 12:00 PM
192-68G96

Bulletin Description

0.87 miles of HMA Patching from US 150/IL 97 Interchange with I-74 to CH 17/CR 1290N.
Region District DBE % VBP % Federal Project #
3 4 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Knox
  • FAP 626
  • FAS 2400
  • IL 97, US 150
  • (42,106)PP
  • C-94-030-22
  • 0-02176-4026
Contract Specifics
15 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of June 07, 2022 04:30 PM.

  • Can a stationed base line drawing be provided w/ any station equations? Can the schedule be updated for the Partial Depth patches to include location/station?
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (06/09/2022)

Authorized Bidders

  • 2242 Gunther Construction, a div of UCM, Inc.
    600 East Main Street
    Galesburg, IL 61401
    P.O. Box 1488
    Galesburg, IL 61402
    Phone: (309) 342-4155 Fax: (309) 342-4150 Email: Gunther@ucm.biz
    $165,743.22

  • 0593 Brandt Construction Co.
    700 4th Street West
    Milan, IL 61264
    Phone: (309) 787-4644 Fax: (309) 787-6344 Email: bids@brandtconstructionco.com
    $242,250.99

  • 5564 G. M. Sipes Construction, Inc.
    503 E. ADAMS ST
    RUSHVILLE, IL 62681
    P.O. BOX 109
    RUSHVILLE, IL 62681
    Phone: (217) 322-6543 Fax: (217) 322-4712 Email: support@gmsipes.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100600 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701336 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 14.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 30.000
X0556100 SQ YD PARTIAL DEPTH PATCHING (SPECIAL) Base items 2,062.000
X4421000 TON PARTIAL DEPTH PATCHING Base items 235.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.