June 17, 2022 Letting 12:00 PM
233-70F78

Bulletin Description

Upgrading and repairing 3 locations of cable median barrier on I 57 and I 74.
Region District DBE % VBP % Federal Project #
3 5 0.00 0.00 COVDDA6W(102)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Various
  • VARIOUS
  • D5 GR 2022-1
  • C-95-015-22
  • 0-01212-5001
Contract Specifics
70 Working Days
Previously advertised on April 29, 2022 (Item 175).
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of June 07, 2022 04:30 PM.

  • 1. Adding a 4th CRP post to the terminal will make its length 57’-6”. Will there be enough room to accommodate the additional 6’3” of length? 2.There is nothing in the plans or JSP that specifies the pay item “HIGH TENSION CABLE MEDIAN BARRIER REFLECTORS”. 3.Page 21 in the plans shows replacing the existing spacers and adding a cable to upgrade the existing system to a 4-cable system. However, the JSP says this job will consist of NEW posts, driven in the mow strip. Please clarify.
    1. Per the detail on sheet 20, the 4th post has its own end anchorage foundation and is noted to be designed by contractor. 2. The reflectors are referenced in the BDE Special Provision "High Tension Cable Median Barrier" 3. The special provisions states the following: "This work shall consist of furnishing all labor, materials and equipment necessary to convert the existing high tension cable median barrier systems from a three cable system to a four cable system." "New line posts shall be installed driving the posts directly into the soil/HMA mow strip per the manufacture’s recommendations at locations adjacent to the existing foundation locations. The soil/HMA mow strip area shall be clear of debris before and after placement of the new line posts" (06/03/2022)

Authorized Bidders

  • 3288 Kujo, Inc.
    5303 Johnsburg Rd
    Johnsburg, IL 60051
    Phone: No Record Fax: (847) 497-9278 Email: dan@kujoinc.com
    $783,300.00

  • 1163 Collins & Hermann, Inc.
    1215 Dunn Road
    St. Louis, MO 63138
    Phone: (314) 869-8000 Fax: (314) 869-8498 Email: msedelkova@collinsandhermann.com

  • 1538 Duce Construction Company
    417 Wilbur Ave.
    Champaign, IL 61822
    Phone: (217) 355-0222 Fax: (217) 355-0999 Email: No Record

  • 4424 Northern Contracting, Inc.
    1851 Coltonville Rd.
    Sycamore, IL 60178
    Phone: (815) 895-5855 Fax: (815) 895-2117 Email: fran@northerncontracting.net

Non Bidders

  • 0392 Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.
    (Pending Authorization)
    1205 Garland Rd.
    Wauconda, IL 60084
    Phone: (847) 526-5457 Fax: (847) 526-4204 Email: kberger@bergercontractors.com

Pay Item # UOM Description Type Quantity Unit Price
67100100 L SUM MOBILIZATION Base items 1.000
70100700 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 15.000
78200021 EACH HIGH TENSION CABLE MEDIAN BARRIER REFLECTORS Base items 140.000
X0326201 FOOT REPAIR HIGH TENSION CABLE (TRINITY) Base items 14,025.000
X0326203 EACH REPAIR HIGH TENSION CABLE SYSTEM END SECTION (TRINITY) Base items 10.000
X0800003 CU YD COARSE AGGREGATE BACKFILL (SPECIAL) Base items 137.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.