Home > Notice of Letting > Contract Detail

July 31, 2020 Letting 12:00 PM
03A-WI058

Bulletin Description

Terminal Ramp Rehabilitation
Region District DBE % VBP % Federal Project #
5 9 2.00 0.00 3170065TBD
County(s) IL Project # Airport Sponsor City
  • Williamson
MWA 4829 Veterans Airport of Southern Illinois Williamson County Airport Authority Marion
Contract Specifics
A voluntary pre-bid meeting will be held on Tuesday, July 21, 2020 at 11:00 AM in the Veterans Airport of Southern Illinois at 10400 Terminal Drive, Marion, IL 62959. Location Notes - Airport Administration Office Board Room. Meeting Description - For engineering information, contact Matt Wiggins of Clarida & Ziegler Engineering at (618) 993-6411.  (please note that this phone number was updated on 7/7 at 11:36 AM).
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
50 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of July 21, 2020 04:30 PM.

  • What are the dimensions of the joint sealant and joint filler on the slab replacement detail on sheet 6 and the spall repair detail on sheet 8?
    Joint sealant dimensions have been added to revised sheet 6. Existing ramp joints are ½” wide and shall be re-sealed per “EXISTING CONCRETE JOINT CLEANING AND SEALING” detail table shown on sheet 8. Spall repair joints shall be re-sealed per same table. See Addendum A for revised Sheet 6. (07/10/2020)

  • The "CONCRETE SLAB REPLACEMENT PLAN VIEW" detail on Sheet 6 shows dowel bars at 30" spacing and tie bars at 15" spacing, but the legend with that detail lists dowel bars at 15" and tie bars at 30". Please clarify the spacing of tie bars and dowel bars. Also, what is the length of the tie bars?
    The “CONCRETE SLAB REPLACEMENT PLAN VIEW” inadvertently switched the spacing dimensions for dowel and tie bars. The legend shows the correct spacing. Dowel bar spacing shall be 15” and tie bar spacing shall be 30”. Tie bar length shall be 30”. See Addendum A for revised Sheet 6. (07/07/2020)

Authorized Bidders

  • 5306 Samron Midwest Contracting, Inc.
    PO Box 1555
    Murphysboro, IL 62966
    Phone: (618) 687-5500 Fax: (618) 684-9341 Email: info@samron.com
    $374,272.50

  • 5550 E. T. Simonds Construction Company
    1500 N Oakland Ave
    PO Box 2107
    Carbondale, IL 62902
    PO Box 2107
    Carbondale, IL 62902
    Phone: (618) 457-8191 Fax: (618) 549-0131 Email: jjones@etsimonds.com
    $537,258.09

  • 5526 Sierra Bravo Contractors, LLC
    7038 Highway 154
    P.O. Box 130
    Sesser, IL 62884
    PO Box 130
    Sesser, IL 62884
    Phone: (618) 625-3456 Fax: (618) 625-6516 Email: engineering@sierrabravocontractors.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR501509 SQ YD 9" PCC PAVEMENT Base items 97.000
AR501515 S.Y. 15" PCC PAVEMENT Base items 429.000
AR501909 S.Y. 9" PCC PAVEMENT REMOVAL Base items 97.000
AR501915 S.Y. 15" PCC PAVEMENT REMOVAL Base items 429.000
AR605540 FOOT CLEAN & SEAL JOINTS Base items 29,300.000
AR605541 FOOT CLEAN & SEAL CRACKS Base items 225.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 770.000
AR801358 S.F. SPALL REPAIR Base items 361.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.