Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
3 | 4 | 0.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
30 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
50300225 | CU YD | CONCRETE STRUCTURES | Base items | 1.100 | |||
50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 230.000 | |||
58700300 | SQ FT | CONCRETE SEALER | Base items | 58.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100405 | EACH | TRAFFIC CONTROL AND PROTECTION, STANDARD 701321 | Base items | 1.000 | |||
70106500 | EACH | TEMPORARY BRIDGE TRAFFIC SIGNALS | Base items | 1.000 | |||
70106700 | EACH | TEMPORARY RUMBLE STRIPS | Base items | 6.000 | |||
70107005 | FOOT | PAVEMENT MARKING BLACKOUT TAPE, 5" | Base items | 790.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 6.000 | |||
70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 329.000 | |||
70400100 | FOOT | TEMPORARY CONCRETE BARRIER | Base items | 300.000 | |||
70400200 | FOOT | RELOCATE TEMPORARY CONCRETE BARRIER | Base items | 300.000 | |||
70600250 | EACH | IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3 | Base items | 2.000 | |||
70600350 | EACH | IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE), TEST LEVEL 3 | Base items | 2.000 | |||
78009004 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 4" | Base items | 790.000 | |||
X7040125 | EACH | PINNING TEMPORARY CONCRETE BARRIER | Base items | 12.000 | |||
Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 85.400 | |||
Z0073200 | EACH | TEMPORARY SHORING AND CRIBBING | Base items | 3.000 | |||
No More Pay Items |