Home > Notice of Letting > Contract Detail

July 31, 2020 Letting 12:00 PM
097-62M24

Bulletin Description

This improvement consists of High Tension Cable Barrier Repairs at Various Locations on Various Expressway Medians District Wide.
Region District DBE % VBP % Federal Project #
1 1 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Various
  • VARIOUS
  • 2020-186-I
  • C-91-348-20
  • 0-01871-1000
  • 0-02175-1007
Contract Specifics
Completion Date: November 30, 2021
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of July 21, 2020 04:30 PM.

  • In the plans they have included our TL-4, 3 CABLE layout. However, after reviewing our previous cable installations in IL, I see that we have supplied both 3 CABLE and 4 CABLE systems along I-55, I-57 & I-80. Some of the systems used a driven post and others used a sleeve in concrete. Both systems are different and utilize different posts and parts. Do you know exactly which CASS system you will be repairing on this project?
    The only system used in District One for the Cable repair contract is the sleeve in concrete. (07/17/2020)

Authorized Bidders

  • 4424 Northern Contracting, Inc.
    1851 Coltonville Rd.
    Sycamore, IL 60178
    Phone: (815) 895-5855 Fax: (815) 895-2117 Email: office@northerncontracting.net
    $340,980.00

  • 3353 Lion Construction 1, LLC
    2598 S. 14000 E. Road
    Pembroke Twp, IL 60958
    Phone: (815) 944-5788 Fax: (815) 944-5787 Email: lajobiemosley@att.net
    $903,125.00

  • 4055 Midwest Fence Corporation
    900 N Kedzie Ave
    Chicago, IL 60651
    Phone: (773) 722-6616 Fax: (773) 722-6626 Email: No Record

Non Bidders

  • 3574 MYS, Incorporated
    (Pending Authorization)
    12416 S. Harlem Ave
    Palos Heights, IL 60463
    Phone: (708) 448-0983 Fax: (708) 448-8098 Email: tyelnick@mysincorporated.com

Pay Item # UOM Description Type Quantity Unit Price
X0325256 FOOT REPAIR HIGH TENSION CABLE (BRIFEN) Base items 180.000
X0325258 EACH REPAIR HIGH TENSION CABLE SYSTEM END SECTION (BRIFEN) Base items 8.000
X0325260 EACH REPAIR POSTS (BRIFEN) Base items 750.000
X0325899 FOOT REPAIR HIGH TENSION CABLE (GIBRALTAR) Base items 120.000
X0325901 EACH REPAIR POSTS (GIBRALTAR) Base items 975.000
X0325975 EACH REPAIR HIGH TENSION CABLE SYSTEM END SECTION (GIBRALTAR) Base items 7.000
X0326201 FOOT REPAIR HIGH TENSION CABLE (TRINITY) Base items 90.000
X0326202 EACH REPAIR POSTS (TRINITY) Base items 75.000
X0326203 EACH REPAIR HIGH TENSION CABLE SYSTEM END SECTION (TRINITY) Base items 4.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.