Home > Notice of Letting > Contract Detail

March 05, 2021 Letting 12:00 PM
061-72M54

Bulletin Description

Patching on I-55 from the Macoupin/Madison County line to the Montgomery / Sangamon County line.
Region District DBE % VBP % Federal Project #
4 6 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Montgomery
  • FAI 55
  • D6 PATCHING 2020
  • C-96-020-21
  • 0-02175-6012
Contract Specifics
15 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of February 23, 2021 04:30 PM.

Authorized Bidders

  • 3163 Kinney Contractors, Inc.
    19342 E. Frontage Rd.
    Raymond, IL 62560
    Phone: (217) 229-3322 Fax: (217) 229-3609 Email: kinney@roadbuilder.net
    $527,978.00

  • 0385 Beniach Construction Co., Inc.
    307 S. Main Street
    Tuscola, IL 61953
    P.O. Box 20
    Tuscola, IL 61953
    Phone: (217) 253-6100 Fax: (217) 253-6144 Email: steven@beniachconstruction.com

  • 5564 G. M. Sipes Construction, Inc.
    503 E. ADAMS ST
    RUSHVILLE, IL 62681
    P.O. BOX 109
    RUSHVILLE, IL 62681
    Phone: (217) 322-6543 Fax: (217) 322-4712 Email: support@gmsipes.com
    $576,545.08

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
44200610 SQ YD CLASS A PATCHES, TYPE II, 13 INCH Base items 375.000
44200612 SQ YD CLASS A PATCHES, TYPE III, 13 INCH Base items 120.000
44200614 SQ YD CLASS A PATCHES, TYPE IV, 13 INCH Base items 560.000
44213000 SQ YD PATCHING REINFORCEMENT Base items 1,055.000
44213200 FOOT SAW CUTS Base items 4,508.000
44213204 EACH TIE BARS 3/4" Base items 720.000
67100100 L SUM MOBILIZATION Base items 1.000
70100420 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701411 Base items 6.000
70100800 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701401 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 30.000
70200100 L SUM NIGHTTIME WORK ZONE LIGHTING Base items 1.000
X4820110 SQ YD HOT-MIX ASPHALT SHOULDER REMOVAL AND REPLACEMENT (SPECIAL) Base items 250.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.