March 05, 2021 Letting 12:00 PM
055-62M08

Bulletin Description

(2.8-Mile) SMART overlay, detector loop replacement and ADA improvements on US 30 (Lincoln Highway) from IL 43 (Harlem Avenue) to IL 50 (Cicero Avenue) within the Village of Matteson.
Region District DBE % VBP % Federal Project #
1 1 13.00 0.00 NHPP9GTI(190)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Cook
  • FAP 353
  • 2020-130-RS
  • C-91-328-20
  • 1-80521-0000
Contract Specifics
75 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of February 23, 2021 04:30 PM.

  • Please clarify the location of the guardrail removal & replacement work on the project. Thank you.
    The proposed removal and replacement of guardrail of 150ft is located on the radius corners of US 30 at Ridgeland Ave. The remaining 75ft of guardrail is for the two traffic barrier terminals to be replaced located at the box culvert approximately 1/4 mile west of Ridgeland Ave. (02/18/2021)

  • 63000001 Steel Plate Beam Guardrail TY A 6’: Please advise where the proposed guardrail removal, and guardrail installation is located. HMA: The cross sections do not illustrate the guardrail and the plans do not clearly identify if the guardrail will be positioned in an aggregate or HMA / WMA shoulder. Please amend the cross sections or declare what type of shoulder the guardrail posts will be driven in to. It would also be helpful to advise the depth of HMA under the guardrail.
    The proposed removal and replacement of guardrail of 150ft is located on the radius corners of US 30 at Ridgeland Ave. The remaining 75ft of guardrail is for the two traffic barrier terminals to be replaced located at the box culvert approximately 1/4 mile west of Ridgeland Ave. The guardrail will be positioned within the aggregate shoulder. (02/18/2021)

Authorized Bidders

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com
    $2,036,371.41

  • 6117 Austin Tyler Construction, Inc.
    23343 S Ridge Road
    Elwood, IL 60421
    Phone: (815) 726-1090 Fax: (815) 726-1171 Email: info@austin-tyler.com
    $2,125,384.00

  • 2341 Builders Paving, LLC
    4401 Roosevelt Road
    Hillside, IL 60162
    Phone: (847) 419-9000 Fax: (847) 419-9050 Email: ssalinas@builderspavingllc.com

  • 1950 Gallagher Asphalt Corporation
    18100 South Indiana Avenue
    Thornton, IL 60476
    Phone: (708) 877-7160 Fax: (708) 877-5222 Email: bids@gallagherasphalt.com
    $2,255,830.93

  • 2880 Iroquois Paving Corporation
    1889 E US Hwy 24
    PO Box 466
    Watseka, IL 60970
    PO Box 466
    Watseka, IL 60970
    Phone: (815) 432-5211 Fax: (815) 432-5234 Email: estimating@iroqpavcorp.com
    $2,096,091.76

  • 3069 K-Five Construction Corporation
    999 Oakmont Plaza Drive
    Suite 200
    Westmont, IL 60559
    Phone: (630) 257-5600 Fax: (630) 257-6788 Email: estimating@k-five.net
    $2,241,450.00

  • 1750 P. T. Ferro Construction Co.
    700 South Rowell Ave.
    Joliet, IL 60433
    P.O. Box 156
    Joliet, IL 60434
    Phone: (815) 726-6284 Fax: (815) 726-5614 Email: estimating@ptferro.com
    $2,683,611.50

Non Bidders

  • 2657 Home Towne Electric, Inc.
    35220 Rt 83
    Lake Villa, IL 60046
    P.O. Box 863
    Lake Villa, IL 60046
    Phone: (847) 223-2800 Fax: (847) 223-7577 Email: No Record

  • 9016 Rula's Enterprises
    1030 S La Grange Rd Ste 4
    La Grange, IL 60525
    Phone: (708) 354-4311 Fax: (708) 354-4312 Email: Rulas_Enterp@Yahoo.com

  • 5635 Sonoma Underground Services Inc.
    103 Ford Drive
    New Lenox, IL 60451
    Phone: (815) 320-3222 Fax: (815) 320-3233 Email: Tbaldridge@sonoma-underground.com

  • 6242 Van-Mack Electric Co.
    1225 Channahon Road, Unit 3
    Rockdale, IL 60436
    Phone: (815) 725-7883 Fax: (815) 725-7888 Email: vanmackelectric@aol.com

Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 100.000
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 100.000
20200100 CU YD EARTH EXCAVATION Base items 7.000
21101615 SQ YD TOPSOIL FURNISH AND PLACE, 4" Base items 148.000
25200110 SQ YD SODDING, SALT TOLERANT Base items 148.000
25200200 UNIT SUPPLEMENTAL WATERING Base items 3.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 59,222.000
40600400 TON MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS Base items 198.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 856.000
40604062 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 Base items 2,161.000
40605026 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, STONE MATRIX ASPHALT, 9.5, MIX "F", N80 Base items 10,737.000
42001300 SQ YD PROTECTIVE COAT Base items 193.000
42400200 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH Base items 414.000
42400800 SQ FT DETECTABLE WARNINGS Base items 40.000
44000156 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 1 3/4" Base items 131,604.000
44000600 SQ FT SIDEWALK REMOVAL Base items 394.000
44201803 SQ YD CLASS D PATCHES, TYPE II, 13 INCH Base items 659.000
44201807 SQ YD CLASS D PATCHES, TYPE III, 13 INCH Base items 396.000
44201809 SQ YD CLASS D PATCHES, TYPE IV, 13 INCH Base items 964.000
48102100 TON AGGREGATE WEDGE SHOULDER, TYPE B Base items 976.000
60250200 EACH CATCH BASINS TO BE ADJUSTED Base items 8.000
60300105 EACH FRAMES AND GRATES TO BE ADJUSTED Base items 11.000
60300305 EACH FRAMES AND LIDS TO BE ADJUSTED Base items 2.000
60618300 SQ FT CONCRETE MEDIAN SURFACE, 4 INCH Base items 300.000
63000001 FOOT STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS Base items 225.000
63100167 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT Base items 2.000
63200310 FOOT GUARDRAIL REMOVAL Base items 225.000
64200108 FOOT SHOULDER RUMBLE STRIPS, 8 INCH Base items 25,252.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 7.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 2.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
66901006 CAL DA REGULATED SUBSTANCES MONITORING Base items 15.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 12.000
67100100 L SUM MOBILIZATION Base items 1.000
70102630 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701601 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70102640 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 30.000
70300210 SQ FT TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS Base items 841.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 71,160.000
70300240 FOOT TEMPORARY PAVEMENT MARKING - LINE 6" Base items 2,812.000
70300250 FOOT TEMPORARY PAVEMENT MARKING - LINE 8" Base items 2,353.000
70300260 FOOT TEMPORARY PAVEMENT MARKING - LINE 12" Base items 670.000
70300280 FOOT TEMPORARY PAVEMENT MARKING - LINE 24" Base items 702.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 841.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 71,160.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 2,812.000
78000500 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 8" Base items 2,353.000
78000600 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 12" Base items 670.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 702.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 1,874.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 1,687.000
88600600 FOOT DETECTOR LOOP REPLACEMENT Base items 1,896.000
K0026700 EACH TREE CARE Base items 50.000
K0029624 GALLON WEED CONTROL, TEASEL Base items 2.500
X0100018 UNIT TREE REMOVAL (UNDER 6 UNITS DIAMETER) Base items 50.000
X0320050 L SUM CONSTRUCTION LAYOUT (SPECIAL) Base items 1.000
X2020110 UNIT GRADING AND SHAPING SHOULDERS Base items 244.000
X4400501 FOOT COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT LESS THAN OR EQUAL TO 10 FEET Base items 100.000
X4402020 SQ FT CONCRETE MEDIAN SURFACE REMOVAL Base items 300.000
X5537800 FOOT STORM SEWERS TO BE CLEANED 12" Base items 1,500.000
X6030310 EACH FRAMES AND LIDS TO BE ADJUSTED (SPECIAL) Base items 6.000
X7011015 L SUM TRAFFIC CONTROL AND PROTECTION (EXPRESSWAYS) Base items 1.000
Z0004562 FOOT COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT Base items 885.000
Z0018500 EACH DRAINAGE STRUCTURES TO BE CLEANED Base items 11.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 205.600
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 40,219.000
Z0076600 HOUR TRAINEES Base items 500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.