| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 3 | 4 | 0.00 | 0.00 | 317SBGPTBD |
| County(s) | IL Project # | Airport | Sponsor | City |
|---|---|---|---|---|
|
C75 5224 | Marshall County | County of Marshall | Lacon |
| Contract Specifics |
|---|
| The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
| 72 Calendar Days |
|
WARNING: FAA Buy American Preference provisions apply to this contract. Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive. |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| AR107508 | EACH | L-806 W C 8' INTERNALLY LIT | Base items | 1.000 | |||
| AR108088 | FOOT | 1/C #8 XLP-USE | Base items | 4,000.000 | |||
| AR108108 | FOOT | 1/C #8 5 KV UG CABLE | Base items | 1,000.000 | |||
| AR109200 | L SUM | INSTALL ELECTRICAL EQUIPMENT | Base items | 1.000 | |||
| AR110012 | FOOT | 2" DIRECTIONAL BORE | Base items | 385.000 | |||
| AR110202 | FOOT | 2" PVC DUCT, DIRECT BURY | Base items | 1,200.000 | |||
| AR125565 | EACH | SPLICE CAN | Base items | 5.000 | |||
| AR125610 | PAIR | REILS | Base items | 1.000 | |||
| AR125615 | EACH | PAPI (L-880 SYSTEM) | Base items | 1.000 | |||
| AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
| AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| AR150530 | L SUM | TRAFFIC MAINTENANCE | Base items | 1.000 | |||
| AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 90.000 | |||
| AR156543 | SQ YD | RIPRAP-GRADATION NO. 3 | Base items | 107.000 | |||
| AR701512 | FOOT | 12" RCP, CLASS IV | Base items | 32.000 | |||
| AR752412 | EACH | PRECAST REINFORCED CONC. FES 12" | Base items | 2.000 | |||
| AR800564 | L SUM | CABLE & CCR TESTING & CALIBRATION | Base items | 1.000 | |||
| AR901510 | ACRE | SEEDING | Base items | 0.200 | |||
| AR905520 | CU YD | TOPSOILING (FROM OFF SITE) | Base items | 173.000 | |||
| AR908510 | ACRE | MULCHING | Base items | 0.200 | |||
| No More Pay Items | |||||||