20100110
|
UNIT
|
TREE REMOVAL (6 TO 15 UNITS DIAMETER)
|
Base items
|
41.000
|
|
20100210
|
UNIT
|
TREE REMOVAL (OVER 15 UNITS DIAMETER)
|
Base items
|
39.000
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
161.000
|
|
20300100
|
CU YD
|
CHANNEL EXCAVATION
|
Base items
|
188.000
|
|
20400800
|
CU YD
|
FURNISHED EXCAVATION
|
Base items
|
137.000
|
|
20700220
|
CU YD
|
POROUS GRANULAR EMBANKMENT
|
Base items
|
460.000
|
|
25000210
|
ACRE
|
SEEDING, CLASS 2A
|
Base items
|
0.240
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
21.500
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
21.500
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
21.500
|
|
25000700
|
TON
|
AGRICULTURAL GROUND LIMESTONE
|
Base items
|
0.500
|
|
25100115
|
ACRE
|
MULCH, METHOD 2
|
Base items
|
0.240
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
23.700
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
455.000
|
|
28100109
|
SQ YD
|
STONE RIPRAP, CLASS A5
|
Base items
|
184.000
|
|
28200200
|
SQ YD
|
FILTER FABRIC
|
Base items
|
184.000
|
|
31101200
|
SQ YD
|
SUBBASE GRANULAR MATERIAL, TYPE B 4"
|
Base items
|
494.000
|
|
42000500
|
SQ YD
|
PORTLAND CEMENT CONCRETE PAVEMENT 10"
|
Base items
|
152.000
|
|
44000100
|
SQ YD
|
PAVEMENT REMOVAL
|
Base items
|
152.000
|
|
44004250
|
SQ YD
|
PAVED SHOULDER REMOVAL
|
Base items
|
278.000
|
|
48300500
|
SQ YD
|
PORTLAND CEMENT CONCRETE SHOULDERS 10"
|
Base items
|
571.000
|
|
48301000
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
723.000
|
|
50100100
|
EACH
|
REMOVAL OF EXISTING STRUCTURES
|
Base items
|
1.000
|
|
50200100
|
CU YD
|
STRUCTURE EXCAVATION
|
Base items
|
104.000
|
|
50200400
|
CU YD
|
ROCK EXCAVATION FOR STRUCTURES
|
Base items
|
209.000
|
|
50800105
|
POUND
|
REINFORCEMENT BARS
|
Base items
|
33,500.000
|
|
50800515
|
EACH
|
BAR SPLICERS
|
Base items
|
125.000
|
|
51500100
|
EACH
|
NAME PLATES
|
Base items
|
1.000
|
|
52200020
|
SQ FT
|
TEMPORARY SOIL RETENTION SYSTEM
|
Base items
|
167.000
|
|
54003000
|
CU YD
|
CONCRETE BOX CULVERTS
|
Base items
|
226.600
|
|
59100100
|
SQ YD
|
GEOCOMPOSITE WALL DRAIN
|
Base items
|
206.000
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
10.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70100405
|
EACH
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701321
|
Base items
|
1.000
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
70100500
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701326
|
Base items
|
1.000
|
|
70103815
|
CAL DA
|
TRAFFIC CONTROL SURVEILLANCE
|
Base items
|
6.000
|
|
70106500
|
EACH
|
TEMPORARY BRIDGE TRAFFIC SIGNALS
|
Base items
|
1.000
|
|
70106700
|
EACH
|
TEMPORARY RUMBLE STRIPS
|
Base items
|
6.000
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
42.000
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
120.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
40.000
|
|
70300221
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT
|
Base items
|
1,758.000
|
|
70400100
|
FOOT
|
TEMPORARY CONCRETE BARRIER
|
Base items
|
512.500
|
|
70400125
|
EACH
|
PINNING TEMPORARY CONCRETE BARRIER
|
Base items
|
108.000
|
|
70400200
|
FOOT
|
RELOCATE TEMPORARY CONCRETE BARRIER
|
Base items
|
512.500
|
|
70600260
|
EACH
|
IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3
|
Base items
|
4.000
|
|
70600332
|
EACH
|
IMPACT ATTENUATORS, RELOCATE (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3
|
Base items
|
4.000
|
|
78001110
|
FOOT
|
PAINT PAVEMENT MARKING - LINE 4"
|
Base items
|
1,758.000
|
|
78200011
|
EACH
|
BARRIER WALL REFLECTORS, TYPE C
|
Base items
|
16.000
|
|
78300201
|
SQ FT
|
PAVEMENT MARKING REMOVAL - GRINDING
|
Base items
|
1,172.000
|
|
86200300
|
EACH
|
UNINTERRUPTABLE POWER SUPPLY, EXTENDED
|
Base items
|
1.000
|
|
X5810103
|
SQ YD
|
MEMBRANE WATERPROOFING SYSTEM FOR BURIED STRUCTURES
|
Base items
|
206.000
|
|
X7830050
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REMOVAL
|
Base items
|
10.000
|
|
X7830052
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REPLACEMENT
|
Base items
|
10.000
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
500.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
500.000
|
$15.00
|