35501308
|
SQ YD
|
HOT-MIX ASPHALT BASE COURSE, 6"
|
Base items
|
36.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
162.000
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
325.000
|
|
40604060
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50
|
Base items
|
4.000
|
|
40604062
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70
|
Base items
|
38.000
|
|
42300200
|
SQ YD
|
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH
|
Base items
|
278.000
|
|
42400200
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH
|
Base items
|
1,338.000
|
|
44000200
|
SQ YD
|
DRIVEWAY PAVEMENT REMOVAL
|
Base items
|
278.000
|
|
44000600
|
SQ FT
|
SIDEWALK REMOVAL
|
Base items
|
1,338.000
|
|
50102400
|
CU YD
|
CONCRETE REMOVAL
|
Base items
|
16.100
|
|
50300255
|
CU YD
|
CONCRETE SUPERSTRUCTURE
|
Base items
|
16.800
|
|
50300260
|
SQ YD
|
BRIDGE DECK GROOVING
|
Base items
|
1,790.000
|
|
50300300
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
2,133.000
|
|
50500405
|
POUND
|
FURNISHING AND ERECTING STRUCTURAL STEEL
|
Base items
|
420.000
|
|
50800205
|
POUND
|
REINFORCEMENT BARS, EPOXY COATED
|
Base items
|
2,190.000
|
|
50800515
|
EACH
|
BAR SPLICERS
|
Base items
|
12.000
|
|
52000110
|
FOOT
|
PREFORMED JOINT STRIP SEAL
|
Base items
|
155.000
|
|
52100520
|
EACH
|
ANCHOR BOLTS, 1"
|
Base items
|
20.000
|
|
60406000
|
EACH
|
FRAMES AND LIDS, TYPE 1, OPEN LID
|
Base items
|
2.000
|
|
63302720
|
EACH
|
REMOVE AND REERECT TRAFFIC BARRIER TERMINALS, TYPE 6B
|
Base items
|
3.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
56.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
446.000
|
|
70307120
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE
|
Base items
|
4,095.000
|
|
70400100
|
FOOT
|
TEMPORARY CONCRETE BARRIER
|
Base items
|
475.000
|
|
70400200
|
FOOT
|
RELOCATE TEMPORARY CONCRETE BARRIER
|
Base items
|
450.000
|
|
70600255
|
EACH
|
IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE, NARROW), TEST LEVEL 2
|
Base items
|
2.000
|
|
70600322
|
EACH
|
IMPACT ATTENUATORS, RELOCATE (FULLY REDIRECTIVE, NARROW), TEST LEVEL 2
|
Base items
|
2.000
|
|
78000100
|
SQ FT
|
THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
279.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
3,745.000
|
|
78000400
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 6"
|
Base items
|
465.000
|
|
78000600
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 12"
|
Base items
|
184.000
|
|
78009000
|
SQ FT
|
MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
70.000
|
|
78009004
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 4"
|
Base items
|
921.000
|
|
78009006
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 6"
|
Base items
|
258.000
|
|
78009012
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 12"
|
Base items
|
139.000
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
6.000
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
6.000
|
|
78300202
|
SQ FT
|
PAVEMENT MARKING REMOVAL - WATER BLASTING
|
Base items
|
852.000
|
|
X0326862
|
EACH
|
STRUCTURES TO BE ADJUSTED
|
Base items
|
4.000
|
|
X0327638
|
EACH
|
STREAM GAUGE
|
Base items
|
1.000
|
|
X4400503
|
FOOT
|
COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT GREATER THAN 10 FEET
|
Base items
|
219.000
|
|
X5060700
|
EACH
|
CLEANING AND PAINTING BEARINGS
|
Base items
|
12.000
|
|
X5537800
|
FOOT
|
STORM SEWERS TO BE CLEANED 12"
|
Base items
|
200.000
|
|
X6030310
|
EACH
|
FRAMES AND LIDS TO BE ADJUSTED (SPECIAL)
|
Base items
|
3.000
|
|
X6700407
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A (D1)
|
Base items
|
12.000
|
|
X7010216
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
|
Base items
|
1.000
|
|
X7830050
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REMOVAL
|
Base items
|
43.000
|
|
X7830052
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REPLACEMENT
|
Base items
|
43.000
|
|
Z0001700
|
SQ YD
|
APPROACH SLAB REPAIR (FULL DEPTH)
|
Base items
|
1.000
|
|
Z0006014
|
SQ YD
|
BRIDGE DECK LATEX CONCRETE OVERLAY, 2 1/2 INCHES
|
Base items
|
1,847.000
|
|
Z0007101
|
L SUM
|
CONTAINMENT AND DISPOSAL OF LEAD PAINT CLEANING RESIDUES NO. 1
|
Base items
|
1.000
|
|
Z0012130
|
SQ YD
|
BRIDGE DECK SCARIFICATION 3/4"
|
Base items
|
1,847.000
|
|
Z0012754
|
SQ FT
|
STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES)
|
Base items
|
89.000
|
|
Z0012755
|
SQ FT
|
STRUCTURAL REPAIR OF CONCRETE (DEPTH GREATER THAN 5 INCHES)
|
Base items
|
9.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0015550
|
CU YD
|
DEBRIS REMOVAL
|
Base items
|
10.000
|
|
Z0016002
|
SQ YD
|
DECK SLAB REPAIR (FULL DEPTH, TYPE II)
|
Base items
|
1.000
|
|
Z0018500
|
EACH
|
DRAINAGE STRUCTURES TO BE CLEANED
|
Base items
|
4.000
|
|
Z0030850
|
SQ FT
|
TEMPORARY INFORMATION SIGNING
|
Base items
|
67.000
|
|