35800100
|
SQ YD
|
PREPARATION OF BASE
|
Base items
|
157.000
|
|
|
40200800
|
TON
|
AGGREGATE SURFACE COURSE, TYPE B
|
Base items
|
50.000
|
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
94,524.000
|
|
|
40600370
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
47,882.000
|
|
|
40600405
|
TON
|
MATERIAL TRANSFER DEVICE
|
Base items
|
11,690.000
|
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
3,391.000
|
|
|
40600985
|
SQ YD
|
PORTLAND CEMENT CONCRETE SURFACE REMOVAL - BUTT JOINT
|
Base items
|
168.000
|
|
|
40600990
|
SQ YD
|
TEMPORARY RAMP
|
Base items
|
105.000
|
|
|
40602965
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50
|
Base items
|
9,747.000
|
|
|
40604050
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
11,690.000
|
|
|
40800029
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
1,641.000
|
|
|
40800050
|
TON
|
INCIDENTAL HOT-MIX ASPHALT SURFACING
|
Base items
|
324.000
|
|
|
44000155
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2"
|
Base items
|
128,466.000
|
|
|
44000160
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4"
|
Base items
|
11,560.000
|
|
|
44200168
|
SQ YD
|
PAVEMENT PATCHING, TYPE II, 14 INCH
|
Base items
|
43.000
|
|
|
44200172
|
SQ YD
|
PAVEMENT PATCHING, TYPE III, 14 INCH
|
Base items
|
38.000
|
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
3,593.000
|
|
|
48203100
|
TON
|
HOT-MIX ASPHALT SHOULDERS
|
Base items
|
80.000
|
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
6.000
|
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
|
70100460
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701306
|
Base items
|
1.000
|
|
|
70100600
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701336
|
Base items
|
1.000
|
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
15.000
|
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
14,730.000
|
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
1,637.000
|
|
|
78009005
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 5"
|
Base items
|
170,911.000
|
|
|
78009008
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 8"
|
Base items
|
671.000
|
|
|
78009012
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 12"
|
Base items
|
354.000
|
|
|
78009024
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 24"
|
Base items
|
170.000
|
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
600.000
|
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
600.000
|
|
|
Z0048665
|
L SUM
|
RAILROAD PROTECTIVE LIABILITY INSURANCE
|
Base items
|
1.000
|
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
2,500.000
|
$0.80
|
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
2,500.000
|
$15.00
|