April 24, 2026 Letting 12:00 PM
134-72B63

Bulletin Description

9.1 miles of pavement patching, HMA surface removal, HMA surfacing, entrance reconstruction and aggregate wedge shoulders on IL 61 from the IL 94 south junction to 0.2 miles west and on IL 94 from the IL 61 south junction to north of US 24.
Region District DBE % VBP % Federal Project #
4 6 0.00 0.00 STPQKTY(907)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Adams
  • FAP 518
  • FAP 733
  • IL 61, IL 94
  • (101,102)RS-6
  • C-96-092-25
  • 6-60125-0000
Contract Specifics
Project Labor Agreement
55 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of April 14, 2026 04:30 PM.

Authorized Bidders

  • 1465 Diamond Construction Company
    2000 North 18th
    Quincy, IL 62301
    PO Box 3486
    Quincy, IL 62305
    Phone: (217) 222-3532 Fax: (217) 222-3080 Email: office@diamond1946.com
    $6,499,143.75

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
35800100 SQ YD PREPARATION OF BASE Base items 157.000
40200800 TON AGGREGATE SURFACE COURSE, TYPE B Base items 50.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 94,524.000
40600370 FOOT LONGITUDINAL JOINT SEALANT Base items 47,882.000
40600405 TON MATERIAL TRANSFER DEVICE Base items 11,690.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 3,391.000
40600985 SQ YD PORTLAND CEMENT CONCRETE SURFACE REMOVAL - BUTT JOINT Base items 168.000
40600990 SQ YD TEMPORARY RAMP Base items 105.000
40602965 TON HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50 Base items 9,747.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 11,690.000
40800029 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 1,641.000
40800050 TON INCIDENTAL HOT-MIX ASPHALT SURFACING Base items 324.000
44000155 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" Base items 128,466.000
44000160 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4" Base items 11,560.000
44200168 SQ YD PAVEMENT PATCHING, TYPE II, 14 INCH Base items 43.000
44200172 SQ YD PAVEMENT PATCHING, TYPE III, 14 INCH Base items 38.000
48102100 TON AGGREGATE WEDGE SHOULDER, TYPE B Base items 3,593.000
48203100 TON HOT-MIX ASPHALT SHOULDERS Base items 80.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70100600 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701336 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 15.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 14,730.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 1,637.000
78009005 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 5" Base items 170,911.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 671.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 354.000
78009024 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24" Base items 170.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 600.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 600.000
Z0048665 L SUM RAILROAD PROTECTIVE LIABILITY INSURANCE Base items 1.000
Z0076600 HOUR TRAINEES Base items 2,500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 2,500.000 $15.00
No More Pay Items