Home > Notice of Letting > Contract Detail

April 24, 2026 Letting 12:00 PM
151-74D60

Bulletin Description

Installation of fencing at the Fayette County Maintenance Storage Facility.
Region District DBE % VBP % Federal Project #
4 7 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Fayette
  • FAS 2801
  • IL 128
  • 103 FNC
  • C-97-060-25
  • N/A
Contract Specifics
15 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of April 14, 2026 04:30 PM.

  • Chain Link Fence 6 will be installed per IDOT Standard 664001-02 which allows the use of Type B pipe. Special Provision page 2 for CL Gate Assembly Special calls out the use of Type A pipe (Schedule 40) which is considered unusual for IDOT projects. Please confirm that Type B pipe can be utilized for the gate consistent with fence installation.
    The special provision for the gate assembly specifically calls out 2.375 in. OD Schedule 40 pipe for the horizontal top and bottom members of the gate assembly. The special provision should be followed. (04/14/2026)

  • Please also confirm that the excavated materials from post footings can either be scattered along the line of fence or placed in on-site stock piles.
    It is fine if the excavated material is placed or spread at that yard. (04/14/2026)

  • Please confirm that any grading, clearing or tree removal, if any, will be completed by IDOT prior to beginning work.
    Everything will be graded and cleared prior to the contractor installing the fence. (04/14/2026)

  • Special provision page 2 also notes Borrow Areas, Use Areas and / or Waste Areas. What is intent or is expected with this abbreviated notation? IF applicable, how is it quantified and paid if this type of work is deemed necessary?
    The contractor should bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (04/13/2026)

Authorized Bidders

  • 4055 Midwest Fence Corporation
    900 N Kedzie Ave
    Chicago, IL 60651
    Phone: (773) 722-6616 Fax: (773) 722-6626 Email: No Record
    $80,191.00

  • 1163 Collins & Hermann, Inc.
    1215 Dunn Road
    St. Louis, MO 63138
    Phone: (314) 869-8000 Fax: (314) 869-8498 Email: msedelkova@collinsandhermann.com
    $108,360.93

  • 0737 CSD Environmental Services, Inc.
    9979 Palm Road
    Glenarm, IL 62536
    Phone: (217) 522-4085 Fax: (217) 522-4087 Email: frank@csdenviro.com
    $139,999.99

Non Bidders

  • 3288 Kujo, Inc.
    (Pending Authorization)
    4102 Crystal Lake Road
    McHenry, IL 60050
    Phone: (847) 497-9277 Fax: (847) 497-9278 Email: jake@kujoinc.com

  • 4051 Midwest Construction Services, Inc.
    (Pending Authorization)
    4200 S. Ricketts
    Bartonville, IL 61607
    PO Box 4185
    Bartonville, IL 61607
    Phone: No Record Fax: No Record Email: No Record

Pay Item # UOM Description Type Quantity Unit Price
66400305 FOOT CHAIN LINK FENCE, 6' Base items 1,827.000
67100100 L SUM MOBILIZATION Base items 1.000
X6640500 EACH CHAIN LINK GATE ASSEMBLY (SPECIAL) Base items 1.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.